Loading...
HomeMy WebLinkAboutNCC190866_NOT Closeout Documents_20201005North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Harris Plant - Erwin 230kV Line Install County: Harnett Project: Switch at Buies Creek Tap River basin: Cape Fear Person financially responsible: Duke Energy Progress, LLC — Thomas Williams, Jr., PE, Project #: HARNE-2020-001 Manager of Transmission Engineering NPDES COC: NCC190866 Address: 410 South Wilmington Street, Raleigh, NC 27601 1. Project Location: NC 27 East, Buies Creek Pictures: No 2. Weather and soil conditions: sunny, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: Yes If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Rick Sago via phone Title: Inspection report: Sent Report Date given/sent: September 08, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Mike Lawyer Others present: Date of inspection: September 04, 2020 Time arriving on site: 1:52 PM Time leaving site: 2:06 PM cc: Rick Sago - ESK