HomeMy WebLinkAbout20040799 Ver 1_Complete File_20040514?QF WATFR p Michael F. Easley, Governor
William G. Ross Jr., Secretary
\Q (? North Carolina Department of Environment and Natural Resources
CO Alan W. Klimek, P.E. Director
O Division of Water Quality
DWQ Project No.: OLf-O? 6J _ County:
Applicant: _ (f P J_
Project Name: , r , _-S-O? JAV7 Date of Issuance of 401 Water Quality Certification:
'VI eg4on
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, CJt d?+ feat t^ f , hereby state that, to the best of my abilities, due care
and diligence as used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approve plans and specifications, and other sup orting materials.
Signature: ?oL Date: ?
Agent's Certification
I, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
1, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature Registration No. Date
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/
GA
?NCUEN
F W A T? Michael F. Easley, Governor
O ?pG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
> i Coleen H. Sullins, Deputy Director
p Division of Water Quality
May 28, 2004
Madison County
DWQ Project No. 040799
SR 1309 (Johnson Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. J. J. Swain, Jr., P.E. WETLANDS/ 401 GROUP
Division Engineer
N C Department of Transportation JUN 0 7 2004
Post Office Box 3279
Asheville, North Carolina 28802 WATER QUALITY SECTION
Dear Mr. Swain:
You have our approval, in accordance with the attached conditions and those listed below, to impact 20 linear feet of
an unnamed tributary to Shelton Laurel Creek (20 linear feet of new pipe) in order to make improvements to NCSR
1309 (Johnson Road) in Madison County. The project must be constructed in accordance with the application dated
May 10, 2004 (received May 14, 2004), including the environmental commitments made in the application letter.
After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No.
3404, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must
acquire any other federal, state or local permits before you proceed with your project including (but not limited to)
Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire
with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the DWQ in writing and submit a new application. If the property is
sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for
complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if
total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions
listed in the attached certification and any additional conditions listed below.
Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. Any reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
2090 U. S. Highway 70, Swannanoa, N.C. 28778 Telephone: 828/296-4500 Fax: 828/299-7043 Customer Service: 1-877/623-6748
Mr. J.J. Swain, Jr., P.E.
May 28, 2004
Page Two
2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint
of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the
design, installation, operation, and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes, or rules occur.
3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they
shall be removed and the natural grade restored within six months of the date that the Division of Land Quality
has released the project.
4. In-stream work and land disturbance within the 25-foot trout buffer zone should not be conducted during the
trout-spawning season of October 15 through April 15, to protect the egg and fry stages of trout from the effects
of sedimentation, during construction.
5. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing
season following completion of construction. The WRC recommends and encourages DOT to use erosion
control matting instead of straw mulch in riparian areas. NCWRC is also requesting that temporary or permanent
herbaceous vegetation be planted on all bare soil as soon as possible and within 15 days of ground disturbing
activities to provide long-term erosion control.
6. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site
for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of
existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater diffuse flow.
7. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their
size to allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12
inches below the stream bottom to allow natural stream bottom material to become established in the culvert
following installation and to provide aquatic life passage during periods of low flow. This may require
increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched,
they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically
unfeasible.
8. Removal of vegetation at the stream crossing and adjacent to streams should be minimized. Native trees and
shrubs (e.g. Rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple)
should be planted along the streambank to reestablish the riparian zone and to provide long-term erosion control
in the vicinity of the road crossing and along the streams within dedicated rights of way.
9. Riprap placed for bank stabilization should be limited to the streambank below the high water mark, and
vegetation should be used for stabilization above the high water elevation.
10. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and to reduce the likelihood of introducing other pollutants into the stream.
11. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
12. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags,
cofferdams, flexible pipe or other diversion structures should be used to minimize excavation in flowing water.
13. If concrete is used during culvert installation (e.g., headwalls), a dry work area should be maintained to prevent
direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete
should not be discharged to surface waters due to the potential for fish kills.
14. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is strictly prohibited.
15. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other
materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate
vicinity of the culverts. Instream dredging has catastrophic effects on aquatic life and disturbance of the natural
form of the stream channel will likely cause downstream erosion problems, possible affecting other landowners.
16. Rock check dams at culvert outlets should be removed at project completion to avoid blocking movement of
aquatic life.
17. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except
for permitted areas associated with culvert conditions.
Mr. J.J. Swain, Jr., P.E.
May 28, 2004
Page Three
18. All work shall be performed during low flow conditions (below bankfull).
19. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion"
form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible
party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water
Quality upon completion of the project. NCDOT is strongly advised to send in photographs upstream and
downstream of each structure to document correct installation.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you
have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500.
Sincerely,
P. 0?9-z,
Alan W. Klimek, P.E.
Attachment
cc: Wilmington District, U S Army Corps of Engineers
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Steve Lund, USACE Asheville Field Office
Wetlands/401 Unit
Mike Parker, NCDWQ Asheville Regional Office
WETLANDS / 401 rROOP
10 U_
STATE OF NORTH CAROLINA
WATER QUALITY SECTION
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR
PO BOX 3279, ASHEVILLE, NC 28802
May 10, 2004
Mr. Steve Lund
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
SR 1309, Johnson Road
SECRETARY
,I 1
99
r
State Project No. 13C.057077(DWQ Minor Permit Fee $200)
Madison County, NC
Dear Mr. Lund:
I have enclosed a straight-line diagram with erosion control plan, a PCN application for
NWP #14, and a vicinity map relative to the proposed project on SR 1309, Johnson Road,
Madison County, NC.
Johnson Road is currently a 12-14 feet wide gravel road. Division of Highways plans to
pave the road 18 feet wide and increase the typical section. Grading will be light.
We propose to extend one existing culvert on an UT to Shelton Laurel Creek. Total
culvert extension will be 20 linear feet. No stream relocation will be performed for the
project. Existing channel morphology will be maintained upstream and downstream of
the culvert. The culvert will be placed below existing streambed elevation. Riparian
vegetation will be reestablished along disturbed areas associated with the culvert
extension. Stormwater will be diverted through grass-lined ditches or vegetated buffers
prior to entering streams.
No effect on federally listed species (threatened or endangered) or their habitats is
anticipated.
Mr. Steve Lund
Page -2 SR 1309, Madison County
May 10, 2004
As a p-rt of the 401 Certification process, a copy of the application will be forwarded to
the NC State Historic Preservation Office as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a).
By copy of this letter, we request that the North Carolina Wildlife Resources Commission
Coordinator, to comment directly to the Corps concerning the permit request.
By copy of this letter, we are asking Ed Ingle, Area Roadside Field Operations Engineer,
to comment on the above project. Temporary encroachment into the buffer zone of
Shelton Laurel Creek will be required from Station 13+00 to 21+80. The stream is
classified as trout. A buffer variance will be required.
By copy of this letter, I am forwarding seven (7) copies of the application package to
Cynthia Van der Wiele, NC Division of Water Quality, 401 /Wetland Unit and an
additional copy to Mike Parker, NC DWQ Asheville Regional Office for review and
comment. Please charge the application processing fee of $200.00 to WBS element #
13C.057077. Please forward comments directly to the Corps with copy to Division 13
Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
RobXE . Bryan
Division 13 Environmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
H. M. Coates, P.E.
Ed Ingle
David McHenry
Cynthia Van der Wiele
Mike Parker
Office Use Only: y Form Version April 2001
USACE Action ID No. DWQ No. 0 1 J 9
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
Check all of the approval(s) requested for this project:
X Section 404 Permit
? Section 10 Permit
X 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation
Mailing Address: P.O. Box 3279
Asheville, NC 28802
Telephone Number: 828-251-6171 Fax Number: 828-251-6394
E-mail Address: rdbryan a,dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.) N/A
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1309 Johnson Road
2. T.I.P. or State Project Number (NCDOT Only): I 3C.057077
3. Property Identification Number (Tax PIN):
4. Location
N/A
County: Madison Nearest Town: Shelton Laurel
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): SR1309 is located off of NC 212
approximately 6 miles southwest of the NC/TN state line..
5. Site coordinates, if available (UTM or Lat/Long): 35°57'58"N 82041'53"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Existing secondary road
7. Property size (acres): 1.0
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Shelton Laurel Creek (Class
C -Trout
9. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://li2o.enr.state.ne.us/,tdinin/maps/.)
Page 2 of 8
10. Describe the purpose of the proposed work: We propose to grade, drain, base, pave and
install erosion control measures for SR 1309 (Johnson Road). We propose to extend one
existing culvert on an UT to Shelton Laurel Creek. Total stream impacts will be 20 linear
feet. The culvert will be installed to insure aquatic life passage within the streams.
11. List the type of equipment to be used to construct the project: Excavator, backhoe, and
trucks.
12. Describe the land use in the vicinity of this project: Rural, homes, wooded.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: No, no future plans.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact Area of Located within Distance to
Site Number Type of Impact* Impact 100-year Flood lain** Nearest Stream T e of Wetland***
Page 3 of 8
(indicate on
N/A
List each impact separately ano tocnttty temporary impacts. impacts mctuae, our are not nmiteu to: mccnan¢ca clearing, gratnng, nu,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www•.t'ema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0.0
Total area of wetland impact proposed: 0.0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please secif )
21+60 Culvert 20 UT to Shelton Laurel 1 ft P
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditch ing/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no natne, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.us"'S.gov. Several interact sites also allow direct download and printing of USGS maps (e.g., www.to2oztme.coin,
W 'a W. nta1)qucst.cont, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 20 feet.
Page 4 of 8
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Name Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation - N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The existine secondary road must be improved to meet current safety standards for paved
roads. The culvert extension requested is the minimum necessary to establish an appropriate
typical section for the roadway. Riparian vegetation will be established on disturbed areas
associated with the project construction.
VIII. Mitigation - N/A
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
Page 5 of 8
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://Ii2o.enr.state.nc.us/ncwetlatids/strm,ide.litni1.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at hap:i-h2o.enr.state.nc.us/cvr2/index.htni. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
Page 6 of 8
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes X No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No X
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) - N/A
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone I extends out 30 tect perpendicular trom near bank of channel; Gone G extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 7 of 8
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The existing compacted gavel roadway acts as an impervious surface. Paving of the roadway
should eliminate sedimentation from fines associated with gavel surface treatment. The
roadway surface will be 40% of right of way acreage. Stormwater will be diverted through
settling basins or grass lined buffers prior to entering the streams.
XII. Sevva ;e Disposal (DWQ Only)- N/A
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No X
Is this an after-the-fact permit application?
Yes ? No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
With regard to hazardous spill basins, the road is not classified as an arterial route therefore
hazardous spill basins are not reauired.
D. f3 ,gut _Z?, ?//o/e
Appliont/Agent's Sigdature Da{
(Agent's signature is valid only if an authorization letter from the applicant is provided.
Page 8 of 8
ktGlt ??? \!?,
21
I 1 ?? ? J + f?? F
-?{r? ? I rte ?., •- ? °?+J``? ? ' ` ' ? ? __?4 a%>.?.
[7
?.+
?cc)
40
6* W
Name: WHITE ROCK Location: 035° 57'47.28" N 082° 41'53.85" W
Date: 5/10/2004 Caption: SR 1309, Johnson Road
Scale: 1 inch equals 1000 feet Madison County, NC.
• t
y
0
1 ,.
i
.F
•
(C) 1998, Maptech, Inc.
' F
1
ALUfV
KNOB
C4
n
?r
Ni
1310
?' Qng
n \
._ ?i- ,1
O 2
212 ?
\`?...?Zwoo" Z jN
Laurai
i
4 1446
--J
1_
,l
2.9 i
Figure 1. SR 1309, Johnson Road, UT to Shelton Laurel Creek, Madison County, NC.
N.C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT: SR 1,309 JOHNSON RD
LOCATION: F ROM U 7 .21 2To F N D M N .
WORK TYPE:GR? D L RA N P
WORK ORDER: ?3c. os?o?7 PRIORITY: ?g
COUNTY: ?,/jp,[ A ON TOWNSHIP:
DATE: I2- I(-'-U ?' SCALE:
NOTES: 4j' RI W ,
o.aa M???S PREPARED BY: JPF
PIPE DATA SR# )30q
CO
STATION . fil A,0150tj .
PRESENT SIZE WORK ORDE
PROPOSED SIZE R
NOTES
ol_
270
6 0' cm /9
-30"
?701 /27
CCoS
--------------
-------------
i
CD
rn Z
U O O
Q O O
CL
U)
a) ^
U
Co M
` a C
U N v O
L O a pp M
ca
O O
O
C
O
a p
W
0 U ^
M
cu
' Co <
V)
..
c
o L a Q
O O
O
a) to
O- r
co
N ? Cfl
C ?
C7 co
O N
C C
u O C O
O C
C` =
O
cII >
cu L O
.r L
.-•
Q) d C N
O
co LQ - N
- (D C) ?
3 ^ U
p'a -CU a U-)
N O
.a L c
0 L co
C` D
cv
?
3 `
N 0
3 co O O
Q
?
,
O cu (1)
0
V)
O LQ
N C
W N N
-a cB ? O - ? O N
L a' L L O L cu c)
e-
N
cu C
CU cC E
0 cm r-
J 0 a)
C
c0 .__I
Q
cm 3: O)
C O II C CM C II
N
?`V
h
3 ^
EN
L_
a'°Ov
a) v
w
c c
a) •-
a) a) a? u J
w U)
7 Q
„?
v
p
r Q
70
(3)
? ? Cn (n
CU >- >-
O
70
z
C
N
Q
M _
L
O O W
O
W
J
7 `
N _jj
O LL L
w
.a c(D
3:
J
M cu Lo
co
O
L •- O
O `r
.+ + 00 r+.,
co 'O Fu (n ?- N
a o o 0
cu C:)
ai
cu
a
2
C) C)
O cu a) c9
1
cnU0 n. 0
?: 04
? C
U U
E
a, I-
E E
E F-
U C
a)?U
t
U ?
O
U .? ch
CB
? d
C a)
U cu c)
(D
CL
L
O)
a)
J
O
co
cO +
cl) N
O O
cu O
65 O
+
O
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
EROSION SYMBOLS
STD # DESCRIPTION
245.03 TEMPORARY SILT DITCH --------------------------------------- ------- TSD
245.05 TEMPORARY DIVERSION --------------------------------------- _
------
-
-TD ---.?
893.01 TEMPORARY SILT FENCE -------------------------------------- ------- w Hi
890.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM -------------------
245.01 SILT BASIN TYPE A ---------------------------------------------- ---------------- -0
245.02 SILT BASIN TYPE B ---------------------------------------------- ----------------
TEMPORARY ROCK SILT CHECK TYPE A ------------- ---------------- m
895.10 TEMPORARY ROCK SILT CHECK TYPE B -------------- ------------------ 1'>
892.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ------ ----------------- Em
892.02 TEMPORARY ROCK SEDIMENT DAM TYPE B ------- -----------------
897.01 ROCK PIPE INLET PROTECTION --------------------------- --------
894.01
ROCK SILT SCREEN ---------------------------------------------- --------- ,
------------------
245.04 STILLING BASIN ---------------------------------------------------- ------------------
868.01 RIP RAP ----------------------------------------------------------------- - RR
DITCH LINER ----------------------------------------------------------
ENVIRONMENTALLY SENSITIVE AREA------------------------------
PIPE OUTLET ENERGY DISSAPATOR ---------------------------------------r:
EROSION CONTROL MATTING ---------------------------------- ECM
FIBER GLASS ROVING ------------------------------------------------- FGR
SILT CHECK DAM TYPE-A ----------------------------------------------------- O
SILT CHECK DAM TYPE--B-------------------------------------------------------
EROSION CONTROL PLAN SHEET
Silt fences and temporary silt ditches shall be installed after clearing and
before grading.
Temporary stone ditch checks shall be installed as soon as ditch-line is
established.
Pipe outlet and inlet protection will be done as soon as the pipe is installed.
Silt basins (Type B) will be constructed to the dimension of nine feet by
three feet by two feet unless otherwise noted on plans. (See SB-9 on
dimension sheet)
Seeding and other permanent erosion control measures are to be
implemented as soon as practical.
Temporary rock silt checks (Type B) will be spaced as required by percent
of grade.
DESIGN
r
z
( S.B. 7 )
91
T-
( S.B. 9 )
LENGTH OF DISTURBED AREA 100'
Y
=I
r
°I
LENGTH OF DISTURBED AREA 200'
LENGTH OF DISTURBED AREA 300'
LENGTH OF DISTURBED AREA 400'
FOR SILT- BASIN NOT TO SCALE
CHECK EVERY STORM EVENT AND
CLEAN OUT WHEN HALF FULL.
600 CUBIC FEET PER ACRE.
PIPE INSTALLATION NOTES
1) Install erosion control devices. In streams, where necessary, rock silt
screens will be used.
2) Remove material and existing pipe while limiting, as much as possible,
material and sediment from entering the stream and/or escaping from the
project.
3) Prepare pipe foundation while again taking care to limit, as much as
possible, material and sediment from entering the stream and/or escaping
from the project. Where possible, new grade will be below the existing
streambed. If needed, bedding material will be clean stone.
4) Place the new pipe and compact backfill.
5) Install slope protection on outlet and inlet ends of pipe. Also complete
installation of erosion control measures and perform maintenance as
needed on existing measures.
6) Establish permanent vegetation as soon as possible.
' ROADWAY DITCH
AND MEDIAN LINING GUIDELINES
Percent of Grade
Type of Lining Recommended
0 ------
Scraw and Tack
2 :.brasIOn'Concrol y
Matting
3 ------
4 Synchecic Roving
5
grearcr Stone ••
VTTT_ 7
f
b
b
C
O C
L
?U
3
m
a
E
V
0 4n
v u
-iLI
I >
?L = Tn'
Jl k. V
? C
Q r ? c
?U
?U
CU
0
n)
sl
a z° f=1
VI-35
C
4u
cu
Cl)
0 V
•y
u' u
a`i >
w C?7
0
Ct$
CL
U)
2-
w
W
0
i..i.
? v G
c a o
`
o 0
w w ?
0 0 U w
. .? q o
D U
`%
!
a? 3 s
_
II II II
a?Av?
_ 0
3 00a N
0
March , 1993
C661 `uDsEW £-IA
.j
TEMPORARY SILT FENCE:
A temporary silt fence is commonly used at the toe of a fill section to prevent off-
site sedimentation. It is made of permeable filter fabric buried at the bottom;
stretched and supported by steel posts. The silt fence reduces the water flow while
retaining the sediment. They may also be used to divert water flow to protected
outlets. Silt fences need to be checked after each significant rainfall to ensure there
effectiveness. They must be maintained on a regular basis. Silt fences shall not be
installed across streams, ditches, or waterways.
AREAS OF USE:
• At toe of fill sections where sediment runoff can be stored and contained
inside the project limits.
DESIGN CRITERIA:
- Mat= With Wire Without Wire
Fabric Type 3 Class A Type 3 Class B
Steel posts length 5 ft 5 ft.
Post spacing 10 ft. 6 ft. maximum
VI-6
1 d_ __L 1 f?nn
.15
191-160
9 !•li?l,3E.?? sy??ra?l
Pa 430 J33
/yIA,F-SN91? NC CULT.
?.g ry53
A
.. i6 11
0?
16
l/ I
4' PVC SEWER LINE I I I r
-ss
-I - >-ss -
1 3 40'-15' CMP 8
REP W/ 50'-18' CMP 9 9
3 I I 3
v I i P
W
H
12 CULT. A 9 /0 v y
W
O
Q F-
J ?
O J
F- Q
J ?
= O
V) _
15' CMP _
PE:
- I
------------ --
10' GR. DR.
I1 0 ------ ---- 9 l0
JACQUELINE S-
278-120
EP. WITH 30' -60' CMP
15' C
-MP10 NC 212
SHEET l
D
O
O ::>:
z ?
a
LLj W
n- m
Q O
W
? z
LL O
co a
f-- w
O LLj
Cr >
O
W
/W
PIPE
OUTLETS COVERED
NOTE:
1. USE TEMP ROCK SEDIMENT DAMS
TYPE B ON ALL TURNOUTS & DRY
CROSS PIPES
2. USE SILT FEN. OR TSD ON ALL 2'
FILL SLOPES.
3. USE ( S.B. 9 ) WHERE NEEDED ON
PROJECT
• 2 0 LANDSCAPE AREA 3
---10;- -G R.
LAWN {
ZULA G. JOHNSON I
78-575
GR.
1 ? ? PRKG. -
6
LAWN
Q
PROP. 40'-18' CMP I
18
O CULT.
GARY R. JOHNSON
287-436
17 I l
- ? I
I
I
I
16 0 ?6
CULT.
/0
SHEET 2
SF o
W
0
W
? z w
Qm
1110
a ~
? z
Li
LL_ I--
LL- Q
m W
C?
W
_a
Y Q
M
° f --
w
o W
Cr
iA
Q
11` I
ITT-I
// I
// I
15 m 116111 1
SF
SHEET 3
STA.21+80
END PROD. _
21
20
F
SF
ZULA G. JOHNSON
/11//
3I
z A
I M 3lo
0
z
LLl
20'-30' CMP r?r
EXT. 20' Q
LL
LL.
m
SF ~
0
3