HomeMy WebLinkAboutSW7150704_Final Permit_20161114�i
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
November 14, 2016
Craven County
Mr. Jack B. Veit, III, County Manager
406 Craven Street
New Bern, NC 28560
Subject: Permit No. SW7160704 MOD
Executive Parkway Extension
Linear Roadway Project
Craven County
Dear Mr. Veit:
PAT MCCRORY
Governor
�Zi2► I:\ � �7 :# V:\ ► / J � l :ail rl .� IJ
Secretary
TRACY DAVIS
Director
The Washington Regional Office received a complete Stormwater Management Permit
Application for modification to stormwater permit SW7150704 issued for the Executive
Parkway Extension project on August 6, 2015. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding
Permit No. SW7150704 dated November 14, 2016, for the construction of the subject
project.
This permit replaces all previous permits issued for this site. It shall be effective from the
date of issuance until rescinded and shall be subject to the conditions and limitations as
specified therein, and does not supercede any other agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150E of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
cc: Joseph C. Avolis, PE, Avolis Engineering, PA
Craven County Inspections
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall. I Washington, NC 27889
252-946-6481 T
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AMD LAND RESOURCES
STORMWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143 General Statutes of North
Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Craven County
Executive Parkway Extension
FOR THE
construction, operation and maintenance of a linear roadway project in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications, and other
supporting data as attached and on file with and approved by the Division of Energy,
Mineral, and Land Resources (Division) and considered a part of this permit.
The Permit shall be effective from the date of issuance until rescinded and shall be subject
to the following specific conditions and limitations:
I. DESIGN STANDARDS
1. This permit covers the construction of 73,974 square feet of new build -upon area
on this 9.68 acres project site.
2. The amount of built -upon area has been minimized as much as possible.
3. Approved plans and specifications for projects covered by this permit are
incorporated by reference and are enforceable parts of the permit and shall be kept
on file by the permittee at all times.
4. The only runoff conveyance systems allowed will be vegetated conveyances such
as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules
and approved by the Division.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall. I Washington, NC 27889
252-946-6481 T
5. No piping is allowed except that minimum amount necessary to direct runoff
beneath an impervious surface such as a road or to provide access.
The built -upon areas associated with this project shall be located at least 50 feet
landward of all perennial and intermittent streams or other surface waters.
II. SCHEDULE OF COMPLIANCE
The permittee is responsible for verifying that the proposed built -upon area does
not exceed the allowable built -upon area.
2. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame specified
in the notice, the permittee shall submit a written time schedule to the Director for
modifying the site to meet minimum requirements. The permittee shall provide
copies of revised plans and certification in writing to the Director that the changes
have been made.
3. This project may not be sold or subdivided in whole or in part without first receiving
a permit modification from the Division.
4. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated
with the permitted development, except for average driveway crossings; is strictly
prohibited by any persons.
5. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area in whole or in
part. The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering or piping any vegetative conveyance shown on the
approved plan.
Swales and other vegetated conveyances shall be constructed in their entirety,
vegetated, and be operational for their intended use prior to the construction of any
built -upon surface.
During construction, erosion shall be kept to a minimum and any eroded areas of
the swales or other vegetated conveyances will be repaired immediately.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall. I Washington, NC 27889
252-946-6481 T
N
10
The permittee shall at all times provide the operation and maintenance necessary
to operate the permitted stormwater management systems at optimum efficiency
to include:
a. Inspections
b Sediment removal.
C. Mowing, and re -vegetating of the
d. Immediate repair of eroded areas
e. Maintenance of side slopes in
specifications.
side slopes.
accordance with approved plans and
Within 30 days of completion of the project, the permittee shall certify in writing
that the project has been constructed in accordance with the approved plans.
The permittee shall submit all information requested by the Director or his
representative within the time frame specified in the written information request.
GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. The Director may require modification or revocation and
re -issuance of the permit to change the name and incorporate such other
requirements as may be necessary. In the event of a name or ownership change,
a completed Name/Ownership Change form, signed by both parties, must be
submitted to the Division accompanied by the supporting documentation as listed
on page 2 of the form. The approval of this request will be considered on its merits,
and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until the
Director approves a transfer of ownership. Neither the sale of the project nor the
transfer of common areas to a third party, such as a homeowner's association,
constitutes an approved transfer of the stormwater permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to an enforcement action by the Division, in accordance with
North Carolina General Statutes 143-215.6A to 143-215.6C.
4. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules, and regulations contained in Title 15A NCAC
21-1.1000 of the North Carolina Administrative Code, Subchapter 21-1.1000; and
North Carolina General Statute 143-215.1 et. al.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by the Division, such as the construction of
additional or replacement stormwater management systems.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall. I Washington, NC 27889
252-946-6481 T
6. The permittee grants permission to DEQ Staff to enter the property during normal
business hours, for the purpose of inspecting all components of the stormwater
management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance, or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the swales must
follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state and federal), which have jurisdiction.
11. The permittee shall notify the Division in writing of any name, ownership or mailing
address changes at least 30 days prior to making such changes.
Permit issued this the 14th day of November, 2016.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
-------------------------------------------------------------------- for
Tracy E. Davis, PE, CPM
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit No. SW7150704
State of Noah Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall. I Washington, NC 27889
252-946-6481 T