HomeMy WebLinkAboutSW7080717_Final Permit_20170511Energy, Mineral &
Land Resources
ENVIRONMENTAL OUALITY
Harvey Point Defense Testing Activity
Attn: Mr. Russell L. Waters, Director
2835 Harvey Point Road
Hertford, NC 27944
Dear Mr. Waters:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TRACY DAVIS
Director
May 11, 2017
MODIFICATION For
Subject: Stormwater Permit No. SW7080717
Harvey Point— PBI Site Expansion
Overall Low Density Commercial Development
with an Area of High Density
Perquimans County
The Washington Regional Office received a request to modify the subject permit for the
Harvey Point PBI Site Expansion on April 4, 2017. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC
2H.1000. We are forwarding Permit No. SW7080717, dated May 11, 2017, for the
construction of the subject project.
This permit replaces the previous stormwater permit for this project, and shall be
effective from the date of issuance until December 31, 2021, and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the
Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written
petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-
7447. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact this office at (252) 946-6481.
Sincerely,
Samir Dump or, PE
Regional Engineer
cc: Bamforth Engineers & Surveyors
Washington Regional Office
Nothing Compares_
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, NC 27889
252 946 6481
ti
hoolvqNsV504;
rqv1% 4 a rf li*z,
0*"1y1lifjpl#VI91
swem;of)fj lrw1A Vzw1,nr j
V, QN2.
andST Al 11,19%G
gy.,
:aell 1pw o5nill))-cieb a.-H
1#i-";T bfv-, Wg.j asse r wfau wW,;3WqcA
sc Me by- iol finqwl AKIT
I lopq a to A t IOV t & Ind"116sel'i iimu -s-1 1 .1 �j
f1spaji, To mffi* anj mcni, Ovi qy"Ifts
;3w- t11Pi;iC -:TOT r1i it 11!611'0:P 'N
13'w A-mb.d). N! •.PZII'iO 31 phim-i .4
1 (:3"� ,�M 31 v'103 Aq yphOW It, ni-+c �!l �;hv
pr v " o 4 In a * T ad IS to n ww-:� �,! i j - r: r!:J ut, eo'!An . Ic '--
State Stormwater Management Systems
Permit No. SW7080717
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
OVERALL LOW DENSITY COMMERCIAL DEVELOPMENT
WITH AN AREA OF HIGH DENSITY
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Harvey Point Defense Testing Activity
PB1 Site Expansion
Perquimans County
FOR THE
construction, operation and maintenance of an overall low density commercial
development with (2) constructed wetlands in compliance with the provisions of Session
Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater
rules') and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Energy,
Mineral and Land Resources and considered a part of this permit.
This permit replaces the previous stormwater permit for this project, and shall be
effective from the date of issuance until December 31, 2021, and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data. The total project site is
85.5 acres; with a proposed impervious area of 11.56 acres; and a future
allowable impervious area of 8.96 acres.
The built -upon area percentage for the low density portion of this project must be
maintained at 24% per the requirements of Session Law 2008-211 and 15A
NCAC 2H .1000.
The stormwater systems proposed to treat the runoff generated by the
designated high density area has been approved for the management of
stormwater runoff as described in Section 1.6 on page 3 of this permit.
This project will maintain a minimum 50 foot wide vegetated buffer between all
impervious areas and surface waters on new development and a minimum 30
foot wide vegetated buffer on all existing and previously permitted impervious
areas.
5. Within the low density portions of the permitted project, the only runoff
conveyance systems allowed will be vegetated conveyances such as swales with
minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and as
shown on the approved plan.
Page 2 of 8
State Stormwater Management Systems
Permit No. SW7080717
6. The following design elements have been permitted for the (2) wetland systems
and must be maintained at design condition:
DA #1
DA #2
a.
Drainage Area, sf:
94,960
256,132
b.
Total Impervious Surfaces, ft2:
18,295
55,321
C.
Design Storm, inches:
1.50
1.50
d.
TSS removal efficiency:
85%
85%
e.
Permanent Pool Elevation, FMSL:
5.50
3.50
f.
Temporary Storage Elevation, FMSL:
6.50
4.50
g.
Permanent Pool Surface Area, ft2:
6,750
7,500
h.
Permitted Storage Volume, ft3:
11,174
12,488
i.
Controlling Orifice:
1.0-inch
1.0-inch
j.
Receiving Stream/River Basin:
Perquimans
River / Pasquotank
k.
Stream Index Number:
30 — 6 — (7)
I.
Classification of Water Body:
"SB"
II. SCHEDULE OF COMPLIANCE
1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division.
2. The permittee is responsible for verifying that the proposed built -upon area for
the entire lot does not exceed the maximum allowed by this permit.
3. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
4. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
5. The runoff from all built -upon area within the drainage area of the high density
portion of the project must be directed into the permitted stormwater control
system(s).
6. Within the low density portions of the permitted project, all roof drains shall
terminate at least 50 feet from the mean high water mark of surface waters.
7. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
Page 3 of 8
State Stormwater Management Systems
Permit No. SW7080717
e. Further subdivision, acquisition, or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
8. The Director may determine that other revisions to the project should require a
modification to the permit.
9. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
must be recorded showing all such required easements, in accordance with the
approved plans.
10. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
11. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
12. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
13. Permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control
Planning and Design Manual.
14. This permit shall become void unless the facilities are constructed in accordance
with the conditions of this permit, the approved plans and specifications, and
other supporting data.
15. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semi-annual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
16. Records of maintenance activities must be kept by the permittee. The records will
indicate the date, activity, name of person performing the work and what actions
were taken.
Page 4 of 8
State Stormwater Management Systems
Permit No. SW7080717
17. The permittee shall submit to the Division an annual summary report of the
maintenance and inspection records for each BMP. The report shall summarize
the inspection dates, results of the inspections, and the maintenance work
performed at each inspection.
18. Prior to transfer of the permit, the stormwater facilities will be inspected by
Division personnel. The facility must be in compliance with all permit conditions.
Any items not in compliance must be repaired or replaced to design condition
prior to the transfer. Records of maintenance activities performed to date will be
required.
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. In the event, there is either a desire for the facilities to
change ownership, or there is a name change of the Permittee, a completed
"Name/Ownership Change Form" must be submitted to the Division, signed by
the parties involved, along with the applicable documents as listed on page 2 of
the form. The project must be in good standing with DEMLR. The approval of this
request will be considered on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all of the terms and conditions
of this permit until such time as the Director approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal), which have jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
7. Permittee grants permission to Division staff to access the property for the
purposes of inspecting the stormwater facilities during normal business hours.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes within 30 days.
10. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
Page 5 of 8
State Stormwater Management Systems
Permit No. SW7080717
11. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2008-
211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
12. This permit shall be effective from the date of issuance until December 31, 2021.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Permit issued this the 11th day of May, 2017.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Stormwater Permit No. SW7080717 Modification
Page 6 of 8
State Stormwater Management Systems
Permit No. SW7080717
Harvey Point — PBI Site Expansion Page 1 of 2
Stormwater Permit No. SW7080717 Modification
Perquimans County
Designer's Certification
I, , as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 7 of 8
State Stormwater Management Systems
Permit No. SW7080717
Certification Requirements: Page 2 of 2
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDEQ — DEMLR — Washington Regional Office
Page 8 of 8