Loading...
HomeMy WebLinkAboutNCC191511_MODIFICATION Supporting Documents_20200930TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL Moffat Properties, LLC 701 Finger Lakes Drive Wake Forest, NC 27587 RE: Project Name: Puryear Storage Yard Project Previously Named: Unicon Drive Mass Grading Location: 6000 Unicon Drive Wake Forest, NC 27587 Submitted By: Red Line Engineering, PC Date Approved: June 28, 2019 Revisions Approved: August 3, 2020 Dear Moffat Properties, LLC: 301 S. Brooks Street Wake Forest, NC 27587 t 919.435.9400 www,.wakeforestnc.gov Date: September 29, 2020 Permit No: 2019-00001533 Acres Approved: 10.96 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as, a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Planning Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan. Sincerely, C a -- Carrie Mitchell, PE Environmental Engineer