HomeMy WebLinkAboutNCC191575_NOT Closeout Documents_20200929North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Perquimans Project: Suffolk-Swamp-Winfall 230 KV River basin: Pasquotank
Person financially responsible: VEPCO dba Dominion Energy NC - Mark Allen, Project #: PERQU-2020-001
Director ET Project Development & Erecti
Address: 10900 Nuckols Road, 4th Floor, Glen Allen, VA 23060
1. Project Location: Swamp Road, Winfall
Pictures: Yes - Digital
2. Weather and soil conditions: cloudy, cool, wet
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one.
Inspection report: Sent Report
Title:
Date given/sent: September 21, 2020
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No
additional self -monitoring or self -inspections are required. Project is released, remove
10. Comments: from active files. Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities should be requested by the permittee via a Notice of
Termination.
Reported by: James Edwards Others present: No one.
Date of inspection: September 18, 2020 Time arriving on site: 10:10 AM Time leaving site: 10:40 AM
cc: