Loading...
HomeMy WebLinkAbout20201284 Ver 1_PreFiling Acknowledgement Email_20200925Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, September 25, 2020 2:51 PM To: unipresser@hotmail.com Subject: Pre -Filing Meeting Request Acknowledgement - rip rap on MIL point - 20201284 Ver Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for rip rap on MIL point that you submitted on 9/24/2020. The ID number for that project is 20201284, Version 1. Reviewer Contact Information: Reviewer: Alan Johnson Email: alanjohnson@ncdenr.gov Reviewing Office: Mooresville Regional Office - (704) 663-1699 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201284 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/24/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jeff Van Dyke unipresser@hotmail.com rip rap on MIL point Jeff Van Dyke Mecklenburg Street Address 12757 Overlook Mountain Drive Address Line 2 aty Charlotte Rbstal / Zip Code 28216 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below. This project affects 120 feet of shoreline on a point of Mountain Island Lake that is being eroded and undermined by waves. The contractor, Lyfe Marine, will will remove debris, several stumps and two damaged pine trees; shape the bank, install Geo-technical fabric and install Class "B" rip rap. Please give a couple of dates you are available for a meeting. 10/15/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/24/2020