Loading...
HomeMy WebLinkAbout20180032 Ver 2_PreFiling Acknowledgement Email_20200925Strickland, Bev From: laserfiche@ncdenr.gov Sent: Wednesday, September 23, 2020 5:08 PM To: chris.tinklenberg@kimley-horn.com Subject: Acknowledgement for Pre -Filing Meeting Request - Lower Little Sugar Creek Greenway and Stream Rehabilitation (from S. Polk St. to Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Lower Little Sugar Creek Greenway and Stream Rehabilitation (from S. Polk St. to that you submitted on 9/21/2020. The ID number for that project is 20180032, Version 2. Reviewer Contact Information: Reviewer: Reviewer Email: Reviewing Office: Mooresville Regional Office - (704) 663-1699 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 ID#* 20180032 Version* 2 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/21/2020 Contact Name * Chris Tinklenberg Contact Email Address* chris.tinklenberg@kimley-horn.com Project Name* Lower Little Sugar Creek Greenway and Stream Rehabilitation (from S. Polk St. to Project Owner* Charlotte -Mecklenburg Storm Water Services and Right of Entry Agreements Project County* Mecklenburg Owner Address: Street Address Address Line 2 city State / Frovince / Region Fbstal / Zip Code Country Is this a transportation project?* r Yes (-- No Type(s) of approval sought from the DWR: W 401 Water Quality r- 401 Water Quality Certification - Regular Certification - Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* SAW-2020-01148, NCDWR #18- 0032 Do you know the name of the staff member you would like to request a meeting with? Bryan Roden -Reynolds (USACE) and Alan Johnson (DWR) Please give a brief project description below.* Mecklenburg County proposes the construction of an approximately 2.47 miles of 12'-uvide multi -use path and an additional 0.57 miles of 10' and 12'-vade connections to adjacent points of interest along the corridor. A PCN for this project was submitted in January 2018. Afield review meeting was conducted with Kimley-Horn staff, Chris Tinklenberg and Jason Diaz, and Mr. David Shaeffer with the USACE on February 2, 2018, resulting in a request for additional information (RFAI). Shortly after the RFAI was requested, the project was put on hold by Mecklenburg County due to funding. No modifications to the originally submitted PCN are proposed. The multi -use path will provide connectivity from to the proposed Little Sugar Creek Greenway (currently under construction) just west of South Polk Street all the way to the North Carolina/South Carolina state line. This multi -use path will also provide access to the President James K. Polk State Historic Site, the Belle Johnson Park, Pineville Community Park and multiple residential developments along the corridor. The project will support pedestrian and bicycle travel between residential, commercial, and recreational facilities by providing an alternative transportation option. In addition to the multi -use path, the County also proposes to stabilize segments of Little Sugar Creek along the project corridor. The bank stabilization and stream enhancements seek to reduce bank erosion, improve channel dimension, create localized bedform diversity and in -stream habitat, and stabilize bank areas in close proximity to the proposed multi -use path. Stabilization includes bank grading to a stable slope, rock toe protection, and native buffer enhancement/revegetation. Retaining walls are necessary in areas of extreme bank erosion where existing infrastructure, parking lots, buildings need protection as well as areas where the greenway is close to the top of bank. These areas required an engineered solution, necessary in order to ensure safety of those using the greenway. A Verti-block retaining wall system is proposed which is a very natural looking rock face and allows for groundwater exchange by way of gravel infill cavities with lateral perforated drains which also relieves hydrostatic pressure (sustainability). Walls are limited to those areas mentioned above only and are avoided where bank grading with rock toe protection (including native riparian vegetation planting) can be implemented. Generally, the walls will be 4'-5' tall, graded 3:1 above the wall and planted with native riparian vegetation. The sizes of the retaining walls will be the minimum necessary to maintain stability and provide protection to infrastructure. Installation of rock -toe protection will consist of 6"-18" rip rap flush with the bank. The rock -toe foundation is necessary to provide stability for the proposed bank grading proposed behind the rock -toe structure. A brush mattress will be implemented along a section previously recommended by the USACE, which replaces a section originally proposed as rock -toe protection. Please give a couple of dates you are available for a meeting. 9/25/2020 9/28/2020 9/29/2020 9/30/2020 Please attach the documentation you would like to have the meeting about. 02-Lower LSC-Polk to 212.74KB Statel ine_Corps_Su bmitta I_Cover_Lette.. . pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre - filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Re-W,6 ireA "t!", Submittal Date 9/21/2020