Loading...
HomeMy WebLinkAbout20201228 Ver 1_Pre-Filing Meeting Documents_20200921ID#* 20201228 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/21/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Janice Estep info@cbcstoneandrecycling.com Ajjan Buffer Madhi Ajjan Iredell Street Address Address Line 2 aty Fbstal / Zip Code Is this a transportation project? * r Yes r No State / Frovince / Region Country Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - r- 401 Water Quality Certification - Regular Express r- Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. Install dirt in buffer to bring up 760 line. Install river rock from pipe to shoreline and install mulch and plantings. Please give a couple of dates you are available for a meeting. 9/22/2020 9/23/2020 9/24/2020 9/25/2020 Please attach the documentation you would like to have the meeting about. Alan Buffer.pdf 2.62MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature &I lP6ffCE r k-_,P57 Submittal Date 9/21/2020 Reviewer Meeting Request Decision Is a meeting Required?* r Yes r No Lake (At Full Pond/Normal Water Level) i n-5kjj R;.re?- ROCK Full Pond �.h5�0.1i Plcni q� ia' wrd-e Prorn ��P2. ir1 ��FFeY +0 Shore[ rrt.e. Normal Water Level 7 Shoreline ' TT ��© 5b £'tea' 5b 1 .E..n 54'x1 t d t +r+ I h�0 ujFFev- +o b6no VIP IUO tine. Id' ACC£S 5 Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as loft x loo ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 � f :C', S -. � b. bF�s��'K8'�e1bc Y�\ 4- "J• _. i? ;'" �. low]