Wanucha, Dave
From:Euliss, Amy
Sent:Wednesday, September 23, 2020 7:45 AM
To:Wanucha, Dave
Cc:Dagnino, Carla S
Subject:RE: \[External\] RE: U-2579B/BA permit_rev
Thanks Dave. I think it might be best to revise the 401 condition from the 2020 permit, so we have a clean paper trail if
case none of us are here when the monitoring period expires.
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Tuesday, September 22, 2020 4:11 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: RE: \[External\] RE: U-2579B/BA permit mod
Yes, DWR concurs with the mitigation requirement adjustments per the letter from the Corps signed by Monte
Matthews. Our permit modification dated February 3, 2020 pretty much covered it. But if you need the 401
permit revised to include specific compensatory mitigation language, like what is included in Montes letter, or
some other verbiage, let me know.
Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Tuesday, September 22, 2020 1:58 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
1
Cc: Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: RE: \[External\] RE: U-2579B/BA permit mod
My apologies! I hit send before attaching Monte’s form.
From: Euliss, Amy
Sent: Tuesday, September 22, 2020 1:58 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: FW: \[External\] RE: U-2579B/BA permit mod
Dave,
In the permitting of the stream relocation on U-2579BA (U-2579B permit), we have permitted the project to get onsite
credit. We had the USACE alter the mitigation requirements from the previous planned culvert, resulting in a decrease
in mitigation of 598’ of stream impacts. The project has a 5 year monitoring period. If the USACE and DWR are not
satisfied with the relocated stream, mitigation will be acquired at closeout. Are you ok following suit with the USACE,
and changing required DMS mitigation to be 598’ less than what was previously required in the most recent DMS letter
(attached, dated September 13, 2019). Feel free to give me or Carla a call if you would like to discuss.
From: Harmon, Beth <beth.harmon@ncdenr.gov>
Sent: Tuesday, September 22, 2020 11:51 AM
To: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>; Paugh, Leilani Y
<lypaugh@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: RE: \[External\] RE: U-2579B/BA permit mod
Hi Monte – yes this helps. Usually the USACE signs the form prior to me signing. Can you or the USACE project manager
sign the form and then sign back to me? Do you know if the DWR is going to change their 401 permitted stream
impacts?
Thanks.
Beth.
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
From: Matthews, Monte K CIV USARMY CESAW (USA) \[mailto:Monte.K.Matthews@usace.army.mil\]
Sent: Tuesday, September 22, 2020 9:35 AM
To: Harmon, Beth <beth.harmon@ncdenr.gov>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>; Paugh, Leilani Y
<lypaugh@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: \[External\] RE: U-2579B/BA permit mod
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Beth,
As requested, attached is a revised Mitigation Transfer Form for the U-2579B
project in Winston-Salem. This form now reflects a slight reduction to account for
a change from a culvert to a stream relocation. Additional comments are included
on the form to (hopefully) answer any questions and to provide some consistency
between various permit modifications.
Please let me know if you need additional information.
Monte
From: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>
Sent: Monday, August 3, 2020 12:26 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Harmon, Beth <beth.harmon@ncdenr.gov>
Subject: Fw: U-2579B/BA permit mod
Hi Amy,
I hope you are well. We need your help with the U-2579B/BA mod. Because the culvert was not installed we
no longer need the mitigation from DMS but DMS does need the appropriate paperwork to make that
change. See Beth's email below. Can you please provide us with a new MRT form for DMS?
Let me know if you have any questions.
Thanks so much for your help.
Linda
From: Harmon, Beth <beth.harmon@ncdenr.gov>
Sent: Friday, July 31, 2020 4:49 PM
To: Paugh, Leilani Y <lypaugh@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>
3
Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov>
Subject: RE: U-2579B/BA
Yes I reviewed that link – there was no revised MRT form from the USACE and there was nothing included in the
modified 401 that changed the mitigation requirements for DMS. We need that form and a concurring 401 to make any
adjustments to the mitigation requirements. And based on my reading of both permits, the mitigation requirements
were not going to be modified until after the monitoring period that was included in the submitted plan. I cannot make
any adjustments to mitigation requirements or our ledger until I have proper documentation from the permitting
agencies.
Beth.
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Paugh, Leilani Y
Sent: Friday, July 31, 2020 3:13 PM
To: Harmon, Beth <beth.harmon@ncdenr.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>
Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov>
Subject: Re: U-2579B/BA
HI Beth
The mod has been issued. Here is the link from Carla's email below.
Blockedhttps://xfer.services.ncdot.gov/pdea/PermIssued/U-
2579BA%20Forsyth%20Modification%20Smith%20Cr%20Reloc%20February%2012%202020%20.pdf
Thanks for your assistance.
LeiLani
LeiLani Paugh
Mitigation and Modeling Group Supervisor
Environmental Analysis Unit
North Carolina Department of Transportation
4
919 707 6146 office
lypaugh@ncdot.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Harmon, Beth <beth.harmon@ncdenr.gov>
Sent: Friday, July 31, 2020 2:54 PM
To: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>
Cc: Paugh, Leilani Y <lypaugh@ncdot.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>
Subject: RE: U-2579B/BA
Linda – thank you for the heads up on this project and the anticipated changes on mitigation requirements. As you
know, we will adjust the mitigation requirements and associated debits once the permit modifications have been issued
along with a revised mitigation responsibility transfer form. I’ll be on the look out for it.
Beth.
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
5
From: Fitzpatrick, Linda F
Sent: Friday, July 31, 2020 12:15 PM
To: Harmon, Beth <beth.harmon@ncdenr.gov>
Cc: Paugh, Leilani Y <lypaugh@ncdot.gov>
Subject: Fw: U-2579B/BA
Good afternoon Beth,
I hope you day is going well.
I have another change for you. U-2579B/BA will not have the culvert installed therefore we will not need the
DMS debit. See the emails and links below.
Please let me know if you need anything else from me.
Linda
From: Paugh, Leilani Y <lypaugh@ncdot.gov>
Sent: Friday, July 31, 2020 10:51 AM
To: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>
Subject: FW: U-2579B/BA
Linda
Here is another one to coordinate with DMS. The original permit used credit from DMS to cover the impacts from the
culvert installation. Now the culvert will not be installed and the entire stream channel will be relocated using NSD. So
the DMS debit will not be needed.
Thanks
LeiLani
From: Dagnino, Carla S <cdagnino@ncdot.gov>
Sent: Thursday, July 9, 2020 11:17 AM
To: Paugh, Leilani Y <lypaugh@ncdot.gov>
Subject: RE: U-2579B/BA
Yes – in my email sent yesterday below – I indicated what was in the app and what was in the mod. Everything is on
line. Here are the links:
Permit app:
Blockedhttps://xfer.services.ncdot.gov/pdea/PermApps/U-
2579B%20Smith%20Cr%20Modification%20January%2029%202020.pdf
Permit Mod:
Blockedhttps://xfer.services.ncdot.gov/pdea/PermIssued/U-
2579BA%20Forsyth%20Modification%20Smith%20Cr%20Reloc%20February%2012%202020%20.pdf
Please let me know if you need anything else.
Thanks.
6
From: Paugh, Leilani Y <lypaugh@ncdot.gov>
Sent: Thursday, July 9, 2020 10:09 AM
To: Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: Re: U-2579B/BA
Have you submitted the permit mod application or received the mod yet?
LeiLani Paugh
Mitigation and Modeling Group Supervisor
Environmental Analysis Unit
North Carolina Department of Transportation
919 707 6146 office
lypaugh@ncdot.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
.
From: Dagnino, Carla S <cdagnino@ncdot.gov>
Sent: Wednesday, July 8, 2020 3:14 PM
To: Paugh, Leilani Y <lypaugh@ncdot.gov>
Subject: RE: U-2579B/BA
Hi Leilani,
See below, the excerpt from the application for the changes on this project:
Since the relocation has not been verified by the USACE as 1:1 credit for the impact, it was determined that we needed
to state this for the permit application sent out last year :
The mitigation for new impacts will be determined when the final plans for the relocated stream are
complete. This plan will be submitted to the USACE and NCDWR for determination of credits applicable
for the Natural Stream Design (NSD) plans for this stream. Currently the proposed NSD is 2,127 linear
7
feet for Smith Creek (Site 28) and 344 linear feet for UT Smith Creek (Site 28A). Once the credit for
NSD has been determined, NCDOT will contact DMS for the balance.
The Issued 404 Permit issued from that application has the following requirements:
Monitoring protocols shall follow the Monitoring Level I outlined in the Stream
Mitigation Guidelines, April 2003. NCDOT will evaluate the success of the stream
relocation project based on guidance provided by the Stream Mitigation Guidelines
disseminated by the United States Army Corps of Engineers-Wilmington District. The
survey of channel dimension will consist of permanent cross sections placed at six (6)
cross sections (three riffles and three pools). Annual photographs showing both banks
and upstream and downstream views will be taken from permanent, mapped photo
points. The survey of the longitudinal profile will cover a cumulative total of
approximately 2,471 linear feet of channel (2,127’ for Smith Creek and 344’ for the
unnamed tributary. The entire restored length of stream will be investigated for channel
stability and in-stream structure functionality. Any evidence of channel instability will be
identified, mapped and photographed. Pebble counts shall not be conducted. In the
event that success criteria are not being met, remedial measures will be coordinated with
resource agencies. The monitoring shall be conducted annually for a minimum of five
(5) years after final planting. The monitoring results shall be submitted to resource
agencies in a final report within sixty (60) days after completing monitoring. After 5 years,
the NCDOT shall contact resource agencies to schedule a site visit to “close out” the
mitigation site if the site has met success criteria. If success is not met, NCDOT will
make necessary adjustments to the site or pay mitigation fees to cover the impacts.
The construction is set for next year (right now) it will take a while before it is complete. If the USACE says all is good,
then wouldn’t that be the time that we check with DMS to get the credit back? – if it is determined that the relocation
of the channel does not deserve full credit, wouldn’t we want to consider using what we reserved? The 649 at 2:1 or at
least wait and revise the debit at that time? Since this could take a while, how do we make sure this is captured in 5
years?
Thanks.
Carla
From: Paugh, Leilani Y <lypaugh@ncdot.gov>
Sent: Monday, July 6, 2020 6:22 PM
To: Dagnino, Carla S <cdagnino@ncdot.gov>
Subject: Re: U-2579B/BA
Hi Carla
DMS will adjust the debits based on the permit mod. So we should state in the application or it should be
stated in the permit that the area no longer requires mitigation from DMS.
If it doesn't I can follow up with DMS to explain it and revise the debit.
LeiLani
LeiLani Paugh
Mitigation and Modeling Group Supervisor
Environmental Analysis Unit
8
North Carolina Department of Transportation
919 707 6146 office
lypaugh@ncdot.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Dagnino, Carla S <cdagnino@ncdot.gov>
Sent: Monday, July 6, 2020 4:19 PM
To: Paugh, Leilani Y <lypaugh@ncdot.gov>
Subject: U-2579B/BA
Hi Leilani,
This section of the W-S Beltway had a slope failure and the entire Smith Creek needed to be relocated. Prior to the
decision to relocate the creek, the permitted request for mitigation at the 2 sites on smith creek was 649 linear feet. See
attached transfer form rom DMS. This mitigation will likely not be needed if the USACE approves the relocation.
Therefore, we want to make sure that we don’t get charged for this. You explained to me in the past that the charge for
mitigation does not happen until the project gets closed out. So, in this case, will we not get charged for what we asked
for in the past, that we will not need in the future?
Thanks.
Carla
Carla Dagnino
Environmental Coordination and Permitting Group Leader
Environmental Analysis Unit
NC Department of Transportation
919 707 6110 Office
919 602 9452 Cell
cdagnino@ncdot.gov
1598 Mail Service Center
Raleigh, NC 27699 -1598
1000 Birch Ridge Drive
9
Raleigh, NC 27610
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.