Loading...
HomeMy WebLinkAbout20140090 Ver 7_ U-2579B_BA permit rev_20200924 Wanucha, Dave From:Euliss, Amy Sent:Tuesday, September 22, 2020 1:58 PM To:Wanucha, Dave Cc:Dagnino, Carla S Subject:FW: \[External\] RE: U-2579B/BA permit mod Attachments:U-2579B Additional 2 - STR - YD 101.pdf Dave, In the permitting of the stream relocation on U-2579BA (U-2579B permit), we have permitted the project to get onsite credit. We had the USACE alter the mitigation requirements from the previous planned culvert, resulting in a decrease in mitigation of 598’ of stream impacts. The project has a 5 year monitoring period. If the USACE and DWR are not satisfied with the relocated stream, mitigation will be acquired at closeout. Are you ok following suit with the USACE, and changing required DMS mitigation to be 598’ less than what was previously required in the most recent DMS letter (attached, dated September 13, 2019). Feel free to give me or Carla a call if you would like to discuss. From: Harmon, Beth <beth.harmon@ncdenr.gov> Sent: Tuesday, September 22, 2020 11:51 AM To: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Cc: Euliss, Amy <aeuliss@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>; Paugh, Leilani Y <lypaugh@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov> Subject: RE: \[External\] RE: U-2579B/BA permit mod Hi Monte – yes this helps. Usually the USACE signs the form prior to me signing. Can you or the USACE project manager sign the form and then sign back to me? Do you know if the DWR is going to change their 401 permitted stream impacts? Thanks. Beth. Beth Harmon NCDOT Coordinator Division of Mitigation Services Department of Environmental Quality 919-707-8420 office beth.harmon@ncdenr.gov 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Matthews, Monte K CIV USARMY CESAW (USA) \[mailto:Monte.K.Matthews@usace.army.mil\] Sent: Tuesday, September 22, 2020 9:35 AM To: Harmon, Beth <beth.harmon@ncdenr.gov> Cc: Euliss, Amy <aeuliss@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov>; Paugh, Leilani Y <lypaugh@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov> Subject: \[External\] RE: U-2579B/BA permit mod CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Beth, As requested, attached is a revised Mitigation Transfer Form for the U-2579B project in Winston-Salem. This form now reflects a slight reduction to account for a change from a culvert to a stream relocation. Additional comments are included on the form to (hopefully) answer any questions and to provide some consistency between various permit modifications. Please let me know if you need additional information. Monte From: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov> Sent: Monday, August 3, 2020 12:26 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Harmon, Beth <beth.harmon@ncdenr.gov> Subject: Fw: U-2579B/BA permit mod Hi Amy, I hope you are well. We need your help with the U-2579B/BA mod. Because the culvert was not installed we no longer need the mitigation from DMS but DMS does need the appropriate paperwork to make that change. See Beth's email below. Can you please provide us with a new MRT form for DMS? Let me know if you have any questions. Thanks so much for your help. Linda From: Harmon, Beth <beth.harmon@ncdenr.gov> Sent: Friday, July 31, 2020 4:49 PM To: Paugh, Leilani Y <lypaugh@ncdot.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov> 2 Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov> Subject: RE: U-2579B/BA Yes I reviewed that link – there was no revised MRT form from the USACE and there was nothing included in the modified 401 that changed the mitigation requirements for DMS. We need that form and a concurring 401 to make any adjustments to the mitigation requirements. And based on my reading of both permits, the mitigation requirements were not going to be modified until after the monitoring period that was included in the submitted plan. I cannot make any adjustments to mitigation requirements or our ledger until I have proper documentation from the permitting agencies. Beth. Beth Harmon NCDOT Coordinator Division of Mitigation Services Department of Environmental Quality 919-707-8420 office beth.harmon@ncdenr.gov 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Paugh, Leilani Y Sent: Friday, July 31, 2020 3:13 PM To: Harmon, Beth <beth.harmon@ncdenr.gov>; Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov> Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov> Subject: Re: U-2579B/BA HI Beth The mod has been issued. Here is the link from Carla's email below. Blockedhttps://xfer.services.ncdot.gov/pdea/PermIssued/U- 2579BA%20Forsyth%20Modification%20Smith%20Cr%20Reloc%20February%2012%202020%20.pdf Thanks for your assistance. LeiLani LeiLani Paugh Mitigation and Modeling Group Supervisor Environmental Analysis Unit North Carolina Department of Transportation 3 919 707 6146 office lypaugh@ncdot.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Harmon, Beth <beth.harmon@ncdenr.gov> Sent: Friday, July 31, 2020 2:54 PM To: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov> Cc: Paugh, Leilani Y <lypaugh@ncdot.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov> Subject: RE: U-2579B/BA Linda – thank you for the heads up on this project and the anticipated changes on mitigation requirements. As you know, we will adjust the mitigation requirements and associated debits once the permit modifications have been issued along with a revised mitigation responsibility transfer form. I’ll be on the look out for it. Beth. Beth Harmon NCDOT Coordinator Division of Mitigation Services Department of Environmental Quality 919-707-8420 office beth.harmon@ncdenr.gov 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 From: Fitzpatrick, Linda F Sent: Friday, July 31, 2020 12:15 PM To: Harmon, Beth <beth.harmon@ncdenr.gov> Cc: Paugh, Leilani Y <lypaugh@ncdot.gov> Subject: Fw: U-2579B/BA Good afternoon Beth, I hope you day is going well. I have another change for you. U-2579B/BA will not have the culvert installed therefore we will not need the DMS debit. See the emails and links below. Please let me know if you need anything else from me. Linda From: Paugh, Leilani Y <lypaugh@ncdot.gov> Sent: Friday, July 31, 2020 10:51 AM To: Fitzpatrick, Linda F <lffitzpatrick@ncdot.gov> Subject: FW: U-2579B/BA Linda Here is another one to coordinate with DMS. The original permit used credit from DMS to cover the impacts from the culvert installation. Now the culvert will not be installed and the entire stream channel will be relocated using NSD. So the DMS debit will not be needed. Thanks LeiLani From: Dagnino, Carla S <cdagnino@ncdot.gov> Sent: Thursday, July 9, 2020 11:17 AM To: Paugh, Leilani Y <lypaugh@ncdot.gov> Subject: RE: U-2579B/BA Yes – in my email sent yesterday below – I indicated what was in the app and what was in the mod. Everything is on line. Here are the links: Permit app: Blockedhttps://xfer.services.ncdot.gov/pdea/PermApps/U- 2579B%20Smith%20Cr%20Modification%20January%2029%202020.pdf Permit Mod: Blockedhttps://xfer.services.ncdot.gov/pdea/PermIssued/U- 2579BA%20Forsyth%20Modification%20Smith%20Cr%20Reloc%20February%2012%202020%20.pdf Please let me know if you need anything else. Thanks. 5 From: Paugh, Leilani Y <lypaugh@ncdot.gov> Sent: Thursday, July 9, 2020 10:09 AM To: Dagnino, Carla S <cdagnino@ncdot.gov> Subject: Re: U-2579B/BA Have you submitted the permit mod application or received the mod yet? LeiLani Paugh Mitigation and Modeling Group Supervisor Environmental Analysis Unit North Carolina Department of Transportation 919 707 6146 office lypaugh@ncdot.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. . From: Dagnino, Carla S <cdagnino@ncdot.gov> Sent: Wednesday, July 8, 2020 3:14 PM To: Paugh, Leilani Y <lypaugh@ncdot.gov> Subject: RE: U-2579B/BA Hi Leilani, See below, the excerpt from the application for the changes on this project: Since the relocation has not been verified by the USACE as 1:1 credit for the impact, it was determined that we needed to state this for the permit application sent out last year : The mitigation for new impacts will be determined when the final plans for the relocated stream are complete. This plan will be submitted to the USACE and NCDWR for determination of credits applicable for the Natural Stream Design (NSD) plans for this stream. Currently the proposed NSD is 2,127 linear 6 feet for Smith Creek (Site 28) and 344 linear feet for UT Smith Creek (Site 28A). Once the credit for NSD has been determined, NCDOT will contact DMS for the balance. The Issued 404 Permit issued from that application has the following requirements: Monitoring protocols shall follow the Monitoring Level I outlined in the Stream Mitigation Guidelines, April 2003. NCDOT will evaluate the success of the stream relocation project based on guidance provided by the Stream Mitigation Guidelines disseminated by the United States Army Corps of Engineers-Wilmington District. The survey of channel dimension will consist of permanent cross sections placed at six (6) cross sections (three riffles and three pools). Annual photographs showing both banks and upstream and downstream views will be taken from permanent, mapped photo points. The survey of the longitudinal profile will cover a cumulative total of approximately 2,471 linear feet of channel (2,127’ for Smith Creek and 344’ for the unnamed tributary. The entire restored length of stream will be investigated for channel stability and in-stream structure functionality. Any evidence of channel instability will be identified, mapped and photographed. Pebble counts shall not be conducted. In the event that success criteria are not being met, remedial measures will be coordinated with resource agencies. The monitoring shall be conducted annually for a minimum of five (5) years after final planting. The monitoring results shall be submitted to resource agencies in a final report within sixty (60) days after completing monitoring. After 5 years, the NCDOT shall contact resource agencies to schedule a site visit to “close out” the mitigation site if the site has met success criteria. If success is not met, NCDOT will make necessary adjustments to the site or pay mitigation fees to cover the impacts. The construction is set for next year (right now) it will take a while before it is complete. If the USACE says all is good, then wouldn’t that be the time that we check with DMS to get the credit back? – if it is determined that the relocation of the channel does not deserve full credit, wouldn’t we want to consider using what we reserved? The 649 at 2:1 or at least wait and revise the debit at that time? Since this could take a while, how do we make sure this is captured in 5 years? Thanks. Carla From: Paugh, Leilani Y <lypaugh@ncdot.gov> Sent: Monday, July 6, 2020 6:22 PM To: Dagnino, Carla S <cdagnino@ncdot.gov> Subject: Re: U-2579B/BA Hi Carla DMS will adjust the debits based on the permit mod. So we should state in the application or it should be stated in the permit that the area no longer requires mitigation from DMS. If it doesn't I can follow up with DMS to explain it and revise the debit. LeiLani LeiLani Paugh Mitigation and Modeling Group Supervisor Environmental Analysis Unit 7 North Carolina Department of Transportation 919 707 6146 office lypaugh@ncdot.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dagnino, Carla S <cdagnino@ncdot.gov> Sent: Monday, July 6, 2020 4:19 PM To: Paugh, Leilani Y <lypaugh@ncdot.gov> Subject: U-2579B/BA Hi Leilani, This section of the W-S Beltway had a slope failure and the entire Smith Creek needed to be relocated. Prior to the decision to relocate the creek, the permitted request for mitigation at the 2 sites on smith creek was 649 linear feet. See attached transfer form rom DMS. This mitigation will likely not be needed if the USACE approves the relocation. Therefore, we want to make sure that we don’t get charged for this. You explained to me in the past that the charge for mitigation does not happen until the project gets closed out. So, in this case, will we not get charged for what we asked for in the past, that we will not need in the future? Thanks. Carla Carla Dagnino Environmental Coordination and Permitting Group Leader Environmental Analysis Unit NC Department of Transportation 919 707 6110 Office 919 602 9452 Cell cdagnino@ncdot.gov 1598 Mail Service Center Raleigh, NC 27699 -1598 1000 Birch Ridge Drive 8 Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 9 t rl . _,I ns •- ��g'aHxvr�'« ROY COOPER NORTH -4ROLINA Governor Environmental Quality MICHAEL S.REGAN Secretory TIM BAUMGARTNER Director September 13,2019 Mr.Philip S.Harris,III,P.E., CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr.Hams: Subject: DMS Mitigation Acceptance Letter: U-2579B,Winston-Salem Northern Beltway(Eastern Section)from US 311 to east of US 52,Forsyth County References: USACE 404 Individual Permit issued June 17,2014(USACE Action ID 2008-03183)and Individual Modification issued February 21,2019 NCDWR 401 Water Quality Certification issued July 28, 2014(NCDWR ID 2014-0090) and 401 Water Quality Certification Modification issued December 17,2018 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the additional compensatory stream mitigation for the subject project. Based on the information supplied by you on September 13,2019,the impacts are located in CU 03040101 of the Yadkin River basin in the Central Piedmont (CP)Eco-Region, and are as follows: Table 1—Additional Impacts (feet/acres) Yadkin Stream Wetlands Buffer(Sq.Ft.) 03040101 Non- Coastal CP Cold Cool Warm Riparian Zone 1 Zone 2 Riparian Marsh Impacts(feet/acres) 0 0 144.0 0 0 0 0 0 *NOTE: Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This additional impact and associated mitigation needs were not projected by the NCDOT in the 2018 impact data. DMS is currently providing stream and riparian wetland mitigation for the impacts associated with this project located in cataloging unit 03040101 of the Yadkin River basin as required by the 404 and 401 permits issued in June and July 2014, as shown in the below table(in mitigation credits) DE Q rrso.nwe�r�r rr�� North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 Ms.Euliss TIP I-3802B November 20,2018 Page Two Table 2—Current Permitted Impacts and Associated Mitigation Requirements provided by DMS (based on 2014 issued permits) and Revised Anticipated Impacts(based on mitigation request) I Total Permitted Mitigation Provided by Additional Impact Type Impacts DMS per Issued Impact(for Revised Total (feet/acre/sq ft) Permits(Credits) approval) Impacts* Stream(warm) 9,693.0 18,161.0 144.0 9,837.0 Riparian Wetland 1.96 3.92 0 1.96 *Some of the additional stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio.See permit application for details.DMS will provide the amount of mitigation as determined by the regulatory agencies. This mitigation acceptance letter replaces the mitigation acceptance letter issued on January 17,2014 and November 20,2018. DMS commits to implementing additional sufficient compensatory stream mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Ms. Beth Harmon at 919-707- 8420. Sincerely, 0 iiiii arLIAL4 Jam Stanfill DM a :set Management Supervisor cc: Mr.Monte Matthews,USACE—Raleigh Regulatory Field Office Ms.Amy Chapman,Division of Water Resources,Wetlands/401 Unit File: U-2579B Additional 2 1:1EQ,e) North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976