Loading...
HomeMy WebLinkAboutNCC204073_ESC Approval Submitted (5)_20200924ROY COOPER Governor MICHAEL S. RECAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environm ental Qivality September 14, 2020 LETTER OF APPROVAL LGI Homes — NC, LLC Keith Sears, Regional Construction Manager 1450 Lake Robbins Drive, Suite 430 Spring, TX 77380-3258 RE: Project Name: Lot Clearing Plan for Lot 160 at Avery Pond SD, Ph III D Acres Approved: 0.33 Project ID: HARNE-2021-041 County: Harnett City: Hectors Creek Address: Doonbeg Drive River Basin: Cape Fear Stream Classification: Other Submitted by: Lee Hines Date Received by LQS: August 17, 2020 Plan Type: Residential Dear Mr. Sears: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. the NOI form to Annette Lucas at Annette.lucasa ncdenr. gov or Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. uepveenM al4rsHmnmm7eEQna�.\ /'"" North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Reglonal Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 - 910.433,3300 Title 15A NCAC 413 .0118(a) and the NCGO I permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears otherwise from you, this correspondence serves as your authorization for DEMLR to utilize equipment and/or technology on your property for inspection purposes. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A;51 through 66), this office may require revisions. to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a.preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Lee Hines, P. E. — electronic copy Landon Chandler, Harnett County Planning & Inspections Office — electronic copy Fayetteville Regional Office