Loading...
HomeMy WebLinkAbout20031249 Ver 1_Complete File_20031002pF %N A -r ,S Michael F. Easley, Governor r Q William G. Ross Jr., Secretary ?O G North Carolina Department of Environment and Natural Resources j r Alan W. Klimek, P.E. Director Q Division of Water Quality DWQ Project No.: o32 County Applicant: C T Project Name: -5p/3'/-Z.. Date of Issuance of 401 Water Quality Certification Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, 9 Al. boa ifs , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the appr ved plans pd specifications, and other suppoo in materials. Signature: Z lp Date: -- 0 f Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other - supporting materials. Signature Registration No. Date North Carolina Division of Water Quality,-401 Wetlands Certification Unit, 1650 Mall Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ F WAIF 0 R Michael F. Easley, Governor ta J S W Q G' G ecre r., ry illiam G. Ross North Carolina Department of Environment and Natural Resources ` r Alan W. Klimek, P.E. Director > Coleen H. Sullins, Deputy Director 0 Division of Water Quality October 29, 2003 Yancey County DWQ Project No. 031249 SR 1347 (Parson Branch Road) APPROVAL of 401 Water Quality Certification with Additional Conditions WErI,qNDS / 401 r Mr. J. J. Swain, Jr., P.E. R(?UTA Division Engineer NOV . 1 4 N C Department of Transportation . X003 Post Office Box 3279 h th C A ill N li 28802 WqT (?Uf?1 IT ev s e, or aro na Y.SECT101V Dear Mr. Swain: You have our approval, in accordance with the attached conditions and those listed below, to impact 100 linear feet of Parson Branch and one (1) unnamed tributary to Parson Branch (100 linear feet of new pipe) in order to make improvements to NCSR 1347 (Parson Branch Road) in Yancey County. The project must be constructed in accordance with the application dated September 30, 2003 (received October 2, 2003), including the environmental commitments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3404, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 211 .0506 (h) (6) and (7). For this approval to be valid, yon must follow the conditions listed in the attached certification and any additional conditions listed below. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 59 Woodfin Place Asheville, N.C. 28801 Telephone: 828/251-6208 Fax: 828/251-6452 Customer Service: 1-877/623-6748 Mr. J.J. Swain, Jr., P.E. October 29, 2003 Page Two 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Quality has released the project. 4. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 5. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 6. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. 7. Removal of vegetation at the stream crossing and adjacent to streams should be minimized. Native trees and shrubs (e.g. Rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) should be planted along the streambank to reestablish the riparian zone and to provide long-term erosion control in the vicinity of the road crossing and along the streams within dedicated rights of way. 8. Riprap placed for bank stabilization should be limited to the streambank below the high water mark, and vegetation should be used for stabilization above the high water elevation. 9. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 10. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 11. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags, cofferdams, flexible pipe or other diversion structures should be used to minimize excavation in flowing water. 12. If concrete is used during culvert installation (e.g., headwalls), a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH. 13. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is strictly prohibited. 14. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. Instream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel will likely cause downstream erosion problems, possible affecting other landowners. 15. Rock check dams at culvert outlets should be removed at project completion to avoid blocking movement of aquatic life. 16. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for permitted areas associated with culvert conditions. 17. All work shall be performed during low flow conditions. 18. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. NCDOT is strongly advised to send in photographs upstream and downstream of each structure to document correct installation. ti M," J.J. Swain, Jr., P.E. October 29, 2003 Page Two If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, ?214dAAk K. px.,-L- -- Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Steve Lund, USACE Asheville Field Office Wetlands/401 Unit Mike Parker, NCDWQ Asheville Regional Office MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: Michael R. Parker WO Supervisor: Forrest Westall Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NCDOT - SR 1347 Project Number 03 1249 Recvd From DOT Received Date 10/2/03 Project Type extend culverts Recvd By Region Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. ME 14 Stream PT O N F-7-2-63-13- r C r- 40,306. 100.00 1x00.00 F- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y pO N Recommendation: 0 Issue 0 Issue/Coed 0 Deny Provided by Region: Latitude (ddmmss) 355942 Longitude (ddmmss) 821816 Comments: DOT is proposing to grade, widen and pave SR 1347, Parson Branch Road in Yancey County. There are a total of five (5) stream crossings all on Parson Branch except one which is a tributary of Parson Branch. Total impact is 100 linear feet, of new culvert. It is recommended that WO Certification No. 3404 be issued. County YANCEY County2 Region Asheville cc: Regional Office Central Office Page Number 1 Facility Name NCDOT - SR 1347 County YANCEY Project Number 03 1249 Regional Contact: Michael R. Parker Date: Comments (continued from page 1): cc: Regional Office Page Number 2 Central Office .sun. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR PO BOX 3279, ASHEVILLE, NC 28802 ,September 30, 2003 SECRETARY NERANDS/a OR(tp Mr. Steve Lund US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Nationwide Permit #14 SR 1347, Parson Branch Road 031249 (If: T .? 2UU:i AATERQUALITYSECTION State Project No. 13C.100034(DWQ Minor Permit Fee $200) Yancey County, NC Dear Mr. Lund: I have enclosed a straight-line diagram with erosion control plan, a PCN application for NWP #14, and a vicinity map relative to the proposed project on SR 1347, Parson Branch Road, Yancey County, NC. Parson Branch Road is currently a 12-14 feet wide gravel road. Division of Highways plans to pave the road 18 feet wide and increase the typical section. Grading will be light to moderate. We propose to extend five existing culverts on Parson Branch and one UT. Total culvert extension will be 100 linear feet. No stream relocation will be performed for the project. Existing channel morphology will be maintained upstream and downstream of the culvert. The culverts will be placed below existing streambed elevation. Riparian vegetation will be reestablished along disturbed areas associated with the culvert extension. Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering streams. No effect on federally listed species (threatened or endangered) or their habitats is anticipated. Mr. Steve Lund Page -2 SR 1347, Yancey County September 30, 2003 As a part of the 401 Certification process, a copy of the application will be forwarded to the NC State Historic Preservation Office as required by Section 106 of the National Historic Preservation Act of 1966 and GS 121-12(a). By copy of this letter, we request Owen Anderson, North Carolina Wildlife Resources Commission Coordinator, to comment directly to the Corps concerning the permit request. By copy of this letter, we are asking Ed Ingle, Area Roadside Environmental Engineer, to comment on the above project. Temporary encroachment into the buffer zone of Parson Branch will be required. However, the streams are not classified as trout. A buffer variance will not be required. By copy of this letter, I am forwarding seven (7) copies of the application package to Cynthia Van der Wiele, NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike Parker, NC DWQ Asheville Regional Office for review and comment. Please charge the application processing fee of $200.00 to WBS element # 130.100034. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer. Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs, please contact me at (828) 251-6171. Sincerely, -'?r Roge .Bryan Division 13 Environmental Officer Enclosures cc: J.J. Swain, Jr., P.E. K. A. Wilson, P.E. Ed Ingle Owen Anderson Cynthia Van der Wiele Mike Parker Office Use Only: Form Version April 2001 X3,1249 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: X Section 404 Permit ? Section 10 Permit X 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: NC Department of Transportation Mailing Address: P.O. Box 3279 Asheville. NC 28802 Telephone Number: 828-251-6171 Fax Number: 828-251-6394 E-mail Address: rdbryan6?),dot. state. nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) N/A Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1347 Parson Branch Road 2. T.I.P. or State Project Number (NCDOT Only): 13C.100034 3. Property Identification Number (Tax PIN) 4. Location County: Yanc N/A Nearest Town: Day Book Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): SRI 347 is located off of Jacks Creek Road approximately 1 mile north of Clearmont School. 5. Site coordinates, if available (UTM or Lat/Long): 35 59'42"N 82 18'16"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Existing secondary road 7. Property size (acres): 6.3 8. Nearest body of water (stream/river/sound/ocean/lake): Parson Branch (Class C) 9. River Basin: French Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:/ih2o.enr.state.nc.us/admin/maps/.) Page 2 of 8 10. Describe the purpose of the proposed work: We propose to grade, drain, base, pave and install erosion control measures for SR 1347 (Parson Branch Road). We propose to extend five existing culverts on Parson Branch and one UT. Total stream impacts will be 100 linear feet. The culverts will be installed to insure aquatic life passage within the streams. 11. List the type of equipment to be used to construct the project: Excavator, backhoe, and trucks. 12. Describe the land use in the vicinity of this project: Rural, homes, wooded. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No no future plans. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wtlnd ct t Distance to Site Number Type of Impact* Impact F ood la n** 100-ear e5 Stream Type of Wetland*** Page 3 of 8 (indicate on N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0.0 Total area of wetland impact proposed: 0.0 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) 13+66 Culvert 20 Parson Branch 3 ft P 19+57 Culvert 20 Parson Branch 3 ft P 23+90 Culvert 20 UT to Parson Branch 1 ft P 39+04 Culvert 20 Parson Branch 2 ft P 48+00 Culvert 20 Parson Branch I ft P * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us!"s.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mamyucst.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 100 feet. Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name Waterbody ) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation - N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing secondary road must be immoved to meet current safety standards for paved roads. The culvert extensions requested are the minimum necessary to establish an appropriate typical section for the roadway. Riparian vegetation will be established on disturbed areas associated with the project construction. VIII. Mitigation - N/A DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 5 of 8 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://li2o.enr.state.nc.us/ncwetlands/strmgide.litni1. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:/.%h2o.etir.state.nc.us/wM/index.htni. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes X No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No X If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) - N/A It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (s uare feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; Zone L extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The existing compacted gravel roadway acts as an impervious surface. Paving of the roadway should eliminate sedimentation from fines associated with gravel surface treatment. The roadway surface will be 40% of right of way acreage. Stormwater will be diverted through settling basins or grass lined buffers prior to entering the streams. XII. Sewage Disposal (DWQ Only)- N/A XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). With regard to hazardous spill basins, the road is not classified as an arterial route, therefore hazardous spill basins are not required. Appli0fit/Agent's Sign#ure Date (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 8 of 8 c3 - ?` ? ? 3 k? / ? ? ? , ?? M?' ? -mot ` ? ??- r..f 44 go . r Ci t ,1 • 1 4 ??? ?•? 2P i Olt • ''?. i ??...-? ?/ 1111( ?,. 'll i•--? ?? Name: BURNSVILLE Location: 035° 59' 12.8" N 082° 18'15.8" W Date: 8/25/103 I Caption: SR 1347, Parson Branch Road, Yancey County, NC Scale: 1 inch equals 1000 feet ' / N Copyright (C) 1997, Maptech, Inc. b ? o Q ? o a w u 3 w 3 Q w - ---- ----- - --- --- ----- -- - LLJ ? U w ? x ? U a w u: Q x ? o H V) V Q Z 0 o > w 0.., O U Q b 0 a w O H a ? ? o U ? ?I x v1 a w Q z Z 3 ? D 1 r AW8 Td ?? ? . r d rw I! r _ r -. Rr.- .. Figure 1,0. SR 1347, Station 13+66, Yancey County, NC. d u f}. F ym mow 71 i r ? Y ?' T r n ,r r? H s INM?? I Y: + rg .1 17? 1. •a r r- e . , 1 40_ Figure 1.2. SR 1347, Station 23+90, Yancey County, NC. N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY SUBJECT: SR 1347 PARSON BRANCH LOCATION: FROM SR 1345 TO E.O.M. WORK TYPE: GRADE,DRAIN,BASE,PAVE&E.C. WORK ORDER: PRIORITY: COUNTY: YANCEY TOWNSHIP:G.M. DATE: 6/30/03 SCALE:1 "=50' NOTES: 45' R/W EROSION CONTROL PLAN SH. PREPARED BY: J.P.F. it STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS EROSION SYMBOLS TD # DESCRIPTION , 45.03 TEMPORARY SILT DITCH ---------------------------------------------- TSB 45.05 TEMPORARY DIVERSION ------------------------------------- --------- -- -TO 93.01 TEMPORARY SILT FENCE --------------------------------------------- w Hi 90.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM ----------------- -- 45.01 SILT BASIN TYPE A -------------------------------------------------------------- -? 45.02 SILT BASIN TYPE B -------------------------------------------------------------- 92.04 TEMPORARY ROCK SILT CHECK TYPE A ------------------------------ TEMPORARY ROCK SILT CHECK TYPE B ------------------------------- - )0.. ?2.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ----------------------- ?2.02 TEMPORARY ROCK SEDIMENT DAM TYPE B ------------------------ - ?7.01 ROCK PIPE INLET PROTECTION ----------------------------- --------------- M.01 ROCK SILT SCREEN ---------------------- ---------------------------------------- - 15.04 STILLING BASIN --------------------------------------------------------------------- -® 18.01 RIP RAP ------------------------------------------------------------------- RR J DITCH LINER -------------------------- ---- ENVIRONMENTALLY SENSITIVE AREA------------------------------ PIPE OUTLET ENERGY DISSAPATOR--------------------------------------- m. EROSION CONTROL MATTING ---------------------------------- ECM FIBER GLASS ROVING ------------------------------------_------------- FGR SILT CHECK DAM TYPE-A ---------------------------------------------------- O SILT CHECK DAM TY-PE--B------------------------------------------------------- 1r EROSION CONTROL PLAN SHEET Silt fences and temporary silt ditches shall be installed after clearing and before grading. Temporary stone ditch checks shall be installed as soon as ditch-line is established. Pipe outlet and inlet protection will be done as soon as the pipe is installed. Silt basins (Type B) will be constructed to the dimension of nine feet by three feet by two feet unless otherwise noted on plans. (See SB-9 on dimension sheet) Seeding and other permanent erosion control measures are to be implemented as soon as practical. Temporary rock silt checks (Type B) will be spaced as required by percent of grade. 0 DESIGN FOR SILT- BASIN NOT TO S GALE CHECK EVERY STORM EVENT AND CLEAN OUT WHEN HALF FULL. 600 CUBIC FEET PER ACRE. 7' 3' 9' c S.B. T ) ( S.B. 9 ) °IY?\ (S-8.14 ) =Ir? Ir? LENGTH OF DISTURBED AREA 100' LENGTH OF DISTURBED AREA 200' LENGTH OF DISTURBED AREA 300' LENGTH OF DISTURBED AREA 400' PIPE INSTALLATION NOTES 1) Install erosion control devices. In streams, where necessary, rock silt screens will be used. 2) Remove material and existing pipe while limiting, as much as possible, material and sediment from entering the stream and/or escaping from the project. , 3) Prepare pipe foundation while again taking care to limit, as much as possible, material and sediment from entering the stream and/or escaping from the project. Where possible, new grade will be below the existing streambed. If needed, bedding material will be clean stone. 4) Place the new pipe and compact backfill. 5) Install slope protection on outlet and inlet ends of pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measures. 6) Establish permanent vegetation as soon as possible. ROADWAY DITCH AND MEDIAN LINING G . UIDELINES • Percent of Grade Type of Lining Recommended _ Straw and Tack 2 : -Lrosiori• Control ` . Martin; 3 4 Synthetic Roving 5 grearer Stone f .. VIII- 2.....t, , oaz E661 `4 lun • • •• =r • • _ • • yty?r O' a l7': O O _ 0 O 0 0 0 .,b b y o o (n 0 .CD g CD O I'?}n CD f-to m CD cQ 0 A b m A n 0 Cl) m 0 - o S£-IA r Q. 0 I A z"o ' -c ' CO M ju ?0 t -n n ?A Z CD ?j 'o (D c 0m N CD a co Cl 'I 1 'IV VI-3 March, 1993 TEMPORARY SILT DITCH: TSD A temporary silt ditch shall be used in place of silt fence in many situations. Temporary silt ditches shall be used at the toe of fill slopes to divertxunoff into sediment basins, temporary rock sediment dams, temporary rock silt-?hecks arid/ - other sedimentation control measures. Tem or or ft: deep, 2:1- side'. slopes with an optional earth be ilt ditches are approximately 1 AREAS OF USE: • Toe of fill slopes where fill exceeds 3 ft in vertical height. • Along streams to intercept flow and/or divert to a controlled outlet. 1' VI-2 March, 1993 1 TEMPORARY SILT FENCE: A temporary silt fence is commonly used at the toe of a fill section to prevent off- site sedimentation. It is made of permeable filter fabric buried at the bottom; stretched and supported by steel posts. The silt fence reduces the water flow while retaining the sediment. They may also be used to divert water flow to protected outlets. Silt fences need to be checked after each significant rainfall to ensure there effectiveness. They must be maintained on a regular basis. Silt fences shall not be installed across streams, ditches, or waterways. AREAS OF USE: • At toe of fill sections where sediment runoff can be stored and contained inside the project limits. DESIGN CRITERIA: Material With Wire Without Wire Fabric Type 3 Class A Type 3 Class B Steel posts length 5 ft 5 ft. Post spacing 10 ft. 6 ft. maximum 111 VI-6 March, 1993 a? co L m c c OJ c E cu > E ?o n .n cu to _ o 3 c L C ca 3 a? O V) c V) O Lq O v 0) 7 ? QL cu d) O CJ C N J C? O II .? 0) v N O w. ? Q O C L O cv .r- cu 0) 0 c 0 •? 0 G c o E M OJ 0 a? CA 7 3 ? L .. O L 0) Cl) cu w 3 N »r o c c N N UJ D cu O ? L f L O L C fC O) CU O O 0) c O C t9 J c O? C II in cc N N C 0) ? ?- O O t tr- L_ U) J (L Z Q W W M w O M >- -i d TZ U m -? To 0) c?nc°?oN? O N M N M st co) m'^ V/ U tj CO < L N V- 40 L 0) O C N M W M o0 C ?- Q1 r r r 2 a) O ? C of U M Co ? w N " o occ:)) O O Q)o m 10 00 ao 0 0o co ? ? M ? M CM Cl) a o ai ? c t^j C E C C C c c C C O 1? O 1? N O 0) M U -J J J V .J V J V J _I t9 .- r . r N N O O ` O O O 0 E ? FN 0 Eu O F- f 0 c ` ., m C cu U Q ` ` 0 a0 0 L % 06 J E"- 2 2 CL 3 CL ) 4 V 3 ?pE2 EEEf2 a3 0 EEo a3 as EccEE CD co F- F- Fes- In F- (n U) F0 U) F- H N 0 0 0 0 to O .? to to to to N O O m N M N et r- ' It I'- 'Q' J'- CA 00 Q L U ? p? 0 0 0 0 0 0 0 0 0 0 0 to O M LO M tf) . .. L O) 0 0 0 Lr) c 0 0 to V 0 0 0 to O 0 0 0 0 LO O O tJ7 lD co 4) J •V M .- r - Cl) - M r U) 0) 0) C 0) L O 'D cu 0 ` ??-MNetON?-0N?-MN L OI O J L QJN 0) aJ 0_J9)Q)AM Cd N =w-J-JR(rww-RRJJ 0) - J 0 0 0 0 0 0 0 0 0 0 0 0 0) '41t o0+0Co (? r r N M M et O O b O O O O w 0 0 0 0 0 0 '- OOCD Oto a U) CD LO o ?- N N M st 0 0 0 0 0 0 0 0 0 0 0 0 0OOOOOOLO OOOI- (n r ??NV) LO NNMMtO) C)?OD O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 00000000 X000 N O N m m 0 LO T ? M?C, CD ?? .-?-r.-NNNMMMM'ct 0) 0) O) C O C CO N Y U 0) L U OJ N N 4) C W C O N N 3 N C U .O C • 15 I • I TI i I SHEET / 14 13 12 1710 S. F. S. F. 30'-24' CMP C ,-t ('y -') 4 . NOTE: 1. USE TEMP ROCK SEDIMENT DAMS TYPE B ON ALL TURNOUTS A DRY CROSS PIPES 2. USE SILT FEN. OR TSD ON ALL 2' FILL SLOPES. 3. USE ( S.B. 9 ) WHERE NEEDED ON PROJECT SR 1345 PETERSON RD. 20 d S F 30'-30' CMP 19 I If 18 I 17 SF 16 1 If 115 10 SHEET 2 25 I ?I I I .I I 24 rP 0 / I I 23 i zz 0 21 1 H I IV i X20 1 I " SHEET 3 BO SF -? III 29 28 III ? 27 1 ly 26 III rig Ul l If SHEET 4 35 III i? WOODS 34 III III 33 Sr .III ?? I ly III 32 ICI PROPOSED 75'-15' CM DRWY PI 31 30*CMP END OFF R/W i • 130 SHEET 5 40 1 SF 39 \ ?? I i 38 37 36 SF 30'-30' CMP 'ryfeotw--)0 , SHEET6 1-35 45 III 44 43 42 S ICI F III 4 SHEET 7 .140 11 SHEET8 48 47 gill 46 I o i111 145 STA. 48+70 END PROD. 25'-24' CMP [,'Y-ft-,,V.20 ' SF