HomeMy WebLinkAbout20180755 Ver 2_USACE Permit_20200917
Carpenter,Kristi
From:Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil>
Sent:Thursday, September 17, 2020 1:55 PM
To:Williams, Paul C
Cc:Ward, Garcy; Daisey, Greg; Brittingham, Cathy
Subject:\[External\] SAW-2018-01476 Perquimans Bridge 11
Attachments:SAW-2018-01476 Perquimans Bridge 11 Racoon Creek vs 2.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Paul,
Attached is the reverification for Perquimans Bridge #11 over Raccoon Creek to include the
new footprint of the phased coffer dam areas. I have included links to Nationwide Permits 3
and 12 for you to review and supply to you contractor for this project. Please review the
conditions associated with these permits and contact me if you have any questions.
Kyle Barnes
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District
Washington Field Office
910-251-4584
We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service
to our customers. We would appreciate your feedback on how we are performing our
duties. Our automated Customer Service Survey is located at:
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
<Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0>
Thank you for taking the time to visit this site and complete the survey.
1
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2018-01476 County: Perquimans County U.S.G.S. Quad:Hertford
GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION
Permittee: Paul Williams
NCDOT Division 1
Address: 113 Airport Drive
Edenton NC,27932
Telephone Number: (252)482-1861
Size(acres) 2 Nearest Town Hertford
Nearest Waterway Perquimans River River Basin Albemarle-Chowan
USGS HUC 03010205 Coordinates Latitude: 36.1731
Longitude:-76.4724
Location description: The project area is located on Wynne Fork Road(SR 1338)approximately 0.32 miles west of the
intersection with US 17 approximately 1.25 miles south of the town of Hertford in Perquimans County,North Carolina.
Description of projects area and activity: The project involves the replacement of an existing 4 span 150'long X 26.5'wide
bridge with a 3 span 160'long X 30'wide bridge.The bridge approach will be widened requiring 0.03ac of permanent wetland
fill,0.03 ac of wetland excavation and 0.16 ac of temporary impacts to Racoon Creek associated with two phases of sheet piling
and dewatering during the installation.Utilities existing within the ROW will be relocated to approved bore areas.
Applicable Law: ® Section 404(Clean Water Act,33 USC 1344)
® Section 10(Rivers and Harbors Act,33 USC 403)
Authorization: Regional General Permit Number and/or Nationwide Permit Number: 3& 12
SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated August 27,2020.Any violation of the attached
conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class
I administrative penalty,and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional
general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,
provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and
conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to
commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA),
prior to beginning work you must contact the N.C.Division of Coastal Management in Elizabeth City,NC,at(252)264-3901.
This Depailinent of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program,please contact Kyle Barnes t 910)251-4584 or Kyle.W.Barnes(&,usace.armv.mil.
Corps Regulatory Official: . Ck.NNI)L-- Date: September 17,2020
Expiration Date of Verification: M ch 18,2022
A.Determination of Jurisdiction:
1. ® There are waters,including wetlands, on the above described project area that may be subject to Section 404 of the Clean
Water Act(CWA)(33 USC § 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part
331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further
instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an
approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any
work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10
of the Rivers and Harbors Act(RHA)(33 USC§403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a
change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this
notification.
3. ❑ There are waters,including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of
the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be
relied upon for a period not to exceed five years from the date of this notification.
4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request
an approved JD,which is an appealable action,by contacting the Corps for further instruction.
5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved
jurisdictional determination issued . Action ID:SAW-
B.Basis For Jurisdictional Determination: The waters within the project area are(a)(1)with(a)(4)adjacent wetlands
as identified within the 2020 NWPR.
C.Remarks:
D. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps'Clean Water Act jurisdiction for the particular site identified in
this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or
your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination
from the local office of the Natural Resources Conservation Service,prior to starting work.
E.Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above).
If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed
you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Philip Shannin,Appeal Review Officer
60 Forsyth Street SW,Room 10M15
Atlanta,Georgia 30303-8801
Phone: (404)562-5137
In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal
under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form,it must be received at the above address by N/A.
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.
Corps Regulatory Official: 31--
yle Barnes
Date of JD: September 17,2020 Expiration Date of JD:N/A
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please
complete our Customer Satisfaction Survey,located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
SAW-2018-01476
SPECIAL CONDITIONS
A. The regional condition for NWP 3 excludes the use of this permit for discharges into Waters of the
United States designated by either the North Carolina Division of Marine Fisheries (NCDMF) or the
North Carolina Wildlife Resources Commission(NCWRC) as anadromous fish spawning areas
during the prohibited period of February 15 and June 30. This project shall adhere to that
moratorium.
B. The applicant shall maintain adequate flow and circulation of waters of Racoon Creek within the
project area and not restrict flow during high rain events.
Action ID Number: SAW-2018-01476 County: Perquimans County
Permittee: Paul Williams
NCDOT Division 1
Project Name: NCDOT Perquimans Bridle 11 Wynne Fork Road
Date Verification Issued: September 17, 2020
Project Manager: Kyle Barnes
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Kyle Barnes
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Paul Williams NCDOT Division 1 File Number: SAW-2018-01476 Date: September 17,
2020
Attached is: See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
[ PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I-The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the
permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the
permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the
permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer
will send you a proffered permit for your reconsideration,as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the
permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the M.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may
appeal process you may contact: also contact:
District Engineer,Wilmington Regulatory Division, Mr. Philip Shannin,Administrative Appeal Review Officer
Attn: Kyle Barnes CESAD-PDO
2407 West 5th Street U.S.Army Corps of Engineers, South Atlantic Division
Washington,North Carolina 27889 60 Forsyth Street,Room 10M15
Atlanta,Georgia 30303-8801
Phone: (404)562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government
consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation and will have the opportunity to participate in all site investigations.
Date: Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer,Wilmington Regulatory Division,Attn: Kyle Barnes,2407 West 5' Street,Washington,North Carolina
27889
For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin,Administrative
Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 10M15,Atlanta,Georgia 30303-8801
Phone: (404)562-5137