Loading...
HomeMy WebLinkAbout20031016 Ver 1_Complete File_20030815-J& DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP GATE TO: REF. NO. OR ROOM, BLDG. Tuv, v c .n -e., FROM: REF. NO. OR ROOM, BLDG. C- Kv r1'u+?-I ACTION ? NOTE AND- FILE 13 PER OUR CONVERSATION ? NOTE AND RETURN TOME .? PER. YOUR REQUEST ? RETURN WITH MORE DETAILS ? FOR YOUR APPROVAL ? NOTE AND -SEE ME ABOUT THIS ? FOR YOUR INFORMATION`- . .? PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? TAKE APPROPRIATE ACTION ? INVESTIGATE' AND REPORT COMMENTS: - - ??1? CJ4.I COA+a„AS rjor f?'rosr`p 4?6 ?? 1?? STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GovEmoR SECRETARY August 14, 2003 U. S. Army Corps of Engineers WETLANDS /401 ROCK Raleigh Regulatory Field Office 6508 Falls of the Neuse Road, Suite 120 AUG 15 2003 Raleigh, NC 27609 Attention: Mr. Eric Alsmeyer ATER QUALITY SECTION NCDOT Coordinator Subject: Proposed pipe improvements to a structure conveying an unnamed tributary to Terrible Creek on SR 2886 in Wake County. The North Carolina Department of Transportation (NCDOT) proposes to replace a pipe conveying an unnamed tributary to the Terrible Creek on SR 2886 in Wake County (Figure 1 and Figure 2). Information concerning this activity is provided below: Impacts to Waters of the United States Site 1 The project crosses an unnamed intermittent tributary to Terrible Creek (NCDENR-DWQ Index No. 27-43-15-8-(2), Best Usage Classification C NSW) (Figure 3) in the Neuse River Basin. The existing structure that conveys the creek is a 48 inch metal pipe 50 feet long. Please note that the inlet of the structure has been crushed (the cause of this cannot be determined) and the existing roadside shoulder has washed out (see photograph 1). The NCDOT proposes to replace the existing structure with a new pipe with the same dimensions. Permanent impacts at the site associated with the replacement of the structure and minimal amounts of rip rap to protect the structure include 10 linear feet existing channel impacted. The NCDOT proposes to temporarily dewater the work zone during the construction of the project. This will involve the temporary placement of rip rap lined with fabric in the creek 5 feet upstream of the construction activity and 5 feet downstream of the outlet. The work zone will be dewatered less than three days. Temporary impacts to the stream from this activity will result in the dewatering of 10 linear feet of stream. The rip rap and fabric will be removed after construction. Division 5, 2612 N. Duke Street, Durham, NC 27704 Phone: (919) 560-6081 Fax: (919) 560-3371 a Fuquay-vaFina ??ti ? ? ?-?' ? + \?" `\_, r-r?- -??rfi' ?j 4f r? ?---' ,gam'`. '* ? ? /a -, / y ?? } +. Lam. • t ?? ?- -•_?. fk 41? ` -. ? , N ,, i . ? i ?< <?-._?' j - ? j I)1111'!Ilj(? / .-.? ? ?o? ? ?? ', i _ vv ? % ,e,r.'-j r^?A ? ?!,' - ;? ..? ? ? } ,? '?? ?\ ,--?. -/ j/"\-S N )/4...^ t i.k t \ \ \?5, i I f•,?; -, I -.1 'a3 9 ) ?• !1 `? `\ \... /k1 /r` 1,r t ??\?. •?? ? ? l f?l _ ?j?lt ? `?\?? i \ \ 4411 r J i>i ;. '-'} ?•,\, ;-.._l ? ? -t /? is i-?-??-??? \ '`? ?? va t ,- • 4 SITE 1, \ \ ` + ;?? ? ' ley \ \ t' ?v4,.J \` 1) ? ? r ?? T ?_ \ (? , `^?? i •, l???O?i f ?? ?; ? i! 1? ? -? Iyc ,\.+. ? • •a •.? `\ '? y a ,' ? \ ?s _ y \ r f t'i t ? r/ ?? 1 ' -?-..s l'. f ?-/ ?/? ' • ?? r` f ?•• - k + ,«??_i. ? r r tit„? ?. r v ` ? r y^ , r i r V •o :'iA , _ orf • Trbiler ( 4ut) Ali Y? •\ ?1 _ I? _ r •t. /? ! j?111Q ? ?? I _ ? - '^v ? } 336 ( = ?. ' .-_? :'-?r it i f l ??. .??y-;? "•- y r ? 1 't \ ? f `-`;;_? t \' ` / `?* rl i Ua,y=Vdl lIla Y laer, par a- 1 N ' _? r - • u 1 T1 t j? Sl l 1 ! S / / YYY ^? is /? r: _? 1 •?1 ,/j-'' - ?7 1 '\ V - ---- ? J ,r # ql', r `? s +.,, ,,. 1 , ?.? ? \ 4-.--•.,,,-'i ,t` -? _ L 360 ! ? i 1 `?`\ ___ • ,? _ - -?Z //_'?, ice- yJ 1 f. _- ( -• \ `??/ C,efTl r \ \ -?? _ ?t'{I? `I- \ e•'? , '\f? .ki •l f YF t r , T % ' ?VI 1?,1 - j -? \ l.-„?~'-'? ?\ ?? ''?? ??\?` ?\?• \`:?._JI? `"" '\ •i .?e; fie., 1 . ??!r:' 1? \t? N ;? ??- ;,? \i``_ •,??. J%"? ` Project Study ? l ???`; ` ?'; "'`: ? ? ? ?'\,; t\._ ??,r \ Area „?, SR 2886 Meadow Road. ?. Wake Co. Angier USGS Topo Map (1993) Figure 1 1:24,000 e1 Yp hy? - M r E Photograph 1. View of inlet depicting crushed structure and road shoulder wash out. ?. a A NOW NoB `r NoA B Me ' sue/ fr WgA NoB ?aG Wo H NoB Wo /Wo m y? NoB vae :x. ` waC 55 r 1 `I WaC Wo NoB N Wo', kWaB '/?Ly WAR Wa WO B k g4 'NSA ' ti( /? NoB ?9 W 2 ),821 K?A c - C) ry a ry ?g O z U L w ? O O p N \ \ U L O N J p I I Q U , U p ? L a\ L N c 0 N V O O O O U O O J > O ? V O_ O D o Q N - 1 L c 0 N G cd "t? Q-, 0 M U O? s:3. -0 O Y0000 ? .-? N , M 2 Riparian Buffer The construction of the project involves a road crossing of a stream that is subject to the Neuse River Riparian Buffer Rule. The unnamed intermittent tributary to Terrible Creek is depicted on the most recent version of the Angier (USGS, 1993) topographic quadrangle (Figure 1) and the Soil Survey of Wake County (USDA-SCS, 1970) (Figure 2). The construction of the project at Site 1 results in impacts to the riparian buffer (Figure 3).- Construction impacts at Site 1 total 117 square feet in Zone 1, 0 square feet in Zone 2 and 10 linear feet of riparian buffer. Based on the impacts to the riparian buffer at this site, this crossing is exempt. Waters of the U.S. Mitigation Avoidance: All wetlands and surface waters not affected by the project will be protected from unnecessary encroachment. No staging of construction equipment or storage of construction supplies will be allowed in wetlands or near surface waters. Minimization: The side slopes have been steepened to the extent possible at jurisdictional sites. Strict enforcement of sedimentation and erosion control Best Management Practices for the protection of wetlands and surface waters will be enforced during project construction. Continued coordination will occur with maintenance forces and the Environmental Officer during construction to minimize impacts to these sites. Compensatory Mitigation: Construction of the project will result in only minimal impacts to waters of the United States. Impacts have been avoided and minimized to the maximum extent possible during the design process. Due to minimal impacts, compensatory mitigation for stream and wetland impacts will not be provided for this project. Protected Species Plants and animals with federal classifications of Endangered, Threatened, Proposed Endangered and Proposed Threatened are protected under provisions of Section 7 and Section 9 of the ESA. As of January 29, 2003, there are four federally protected species listed for Wake County. They include bald eagle (Haliaeetus leucocephalus), Michaux's sumac (Rhus michauxii), dwarf wedgemussel (Alasmidonta heterodon) and red-cockaded woodpecker (Picoides boralis). Biological Conclusions of No Effect have been rendered for each species. Summary The NCDOT proposes to replace the existing structure with a new pipe with the same dimensions. Permanent impacts at the site associated with the replacement of the structure and minimal amounts of rip rap to protect the structure include 10 linear feet existing channel impacted. Temporary impacts will include the dewatering of 10 linear feet of stream. Application is hereby made for a Department of the Army Section 404 Nationwide Permit (NWP) 3 and NWP 33. Additionally, this application provides notification to the NCDWQ as Section 401 Water Quality Certification (WQC) No. 3376 and No. 3366 will be utilized for construction of this project. The NCDOT will comply with all applicable NWP, WQC and riparian buffer conditions. A pre-construction notification is attached with this request. If you have any questions or need additional information, please contact me at (919) 560-6081. Sincerely, CIL C_? Christopher A. Murray, P.W.S. Environmental Officer cc: Mr. John Dorney, NCDWQ Jerry Linder, NCDOT Brandon Jones, NCDOT Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules* ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification (WQC 3366 and WQC 3376 do not require written concurrence). *Project is classified as "exempt"-less than 40 linear feet of buffer impact. 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 and NWP 33 3. If this notification is solely a courtesy copy because written approval. for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for fizrther details), check here: ? H. Applicant Information Owner/Applicant Information Name: NCDOT Division 5, Christopher A. Murray Mailing Address: 2612 N. Duke St., Durham, NC 27704 Telephone Number: (919) 560-6081 Fax Number: (919) 560-3371 E-mail Address: cmurray@dot.state.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property Page 5 of 12 boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project-has been placed on hold until decipherable maps are provided. 1. Name of project: Proposed replacement of a structure conveying; an unnamed tributary to Terrible Creek on SR 2886 in Wake Count 2. T.I.P. Project Number or State Project Number (NCDOT Only): Non-TIP and Non-Work Order Number 3. Property Identification Number (Tax PIN): N/A 4. Location County: Wake Nearest Town: Fuquay-Varina Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Fuquay-Varina, travel northeast on US 401, turn right and travel east and then south on SR 2886 to project limits. 5. Site coordinates, if available (UTM or Lat/Long): Site 1: 35.60278°N. 78.74120)E (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 0.03 acre 7. Nearest body of water (stream/river/sound/ocean/lake): Site 1: Unnamed Tributary to Terrible Creek 8. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Site is surrounded by residential housing. 10. Describe the overall project in detail, including the type of equipment to be used: The NCDOT will replace the existing; damaged pipe. The NCDOT will also dewater the work zone during construction. Equipment may include excavator, backhoe, bulldozer. grader and crane. Page 6 of 12 11. Explain the purpose of the proposed work: The existing structure has been crushed and the existing roadside shoulder has washed out. The pipe will be replaced. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. None that are known for NCDOT activities. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The project proposes to replace the existing structure. The NCDOT will also dewater the work zone during construction. 2. Individually list wetland impacts below: Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100 year Floodplain** Nearest Stream Type of Wetland*** indicate on nap) acres) (es/no linear feet N/A N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditchhWdrainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://wticw.fema.gov. Page 7 of 12 *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0.0 Total area of wetland impact proposed: 0.0 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? indicate on ma) linear feet) Before Impact lease specify) Rip rap along 1 streambank for 10 ft. UT Terrible Creek 2 Intermittent stabilization only 1 DeW po g 10 ft. UT Terrible Creek 2 Intermittent List each impact separately and identify temporary impacts. impacts include, but are not ted to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usas.aov. Several internet sites also allow direct download and printing of USGS maps (e.g., w1vkv.topozone.com, wwtiv.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 10 feet existing channel impacted and 10 feet temporary impact from dewatering_ 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U. S.) below: Open Water Impact Site Number indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A List each unpact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NIA Size of watershed draining to pond: N/A Expected pond surface area: N/A Page 8 of 12 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. All wetlands and surface waters not affected by construction will be protected from unnecessary encroachment during construction. Strict enforcement of Best Management Practices for the protection of wetlands and surface waters will be enforced during construction. Only the smallest amount of fill necessary to complete the project will be placed in waters of the United States or protected riparian buffers. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated' buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 9 of 12 N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes El No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? If you answered "yes", provide the following information: Page 10 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Site 1 Zone* I t Impact - C-I Multiplier I Required 1 I 117 3 I N/A 2 0 1.5 N/A Total I 117 I 1 N/A Zone t extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Existing: <0.01 acre impervious surface of 0.03 acre total moiect size. Proposed: <0.01 acre impervious surface of 0.03 acre total project size. Erosion and sediment control devices along the project are comprised of temporary silt fence. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project will not generate wastewater. X111. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may Page 11 of 12 choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A l? C-.^ Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12