Loading...
HomeMy WebLinkAboutNC0088684_Correspondence_20200831Strickland, Bev From: Elena Potter <potter@dsbg.org> Sent: Monday, August 31, 2020 5:08 PM To: Tuvia, Ori A Cc: Jeff Wuilliez; Jim Hoffman Subject: [External] Notice of Violation & Intent dated 08/20/20 Attachments: 08 20 2020 Ltr re Permit Draft_Signed.pdf Ulmr."rExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ELort.spam@nc.gov Good afternoon Mr. Tuvia, We received your letter on August 27, 2020, regarding TDS daily max exceeded as reported on 06/16/20. We are responding to comply with the requirement of a written response within 10 days of receiving Notice. Per our Director of Horticulture, Jeff Wuilliez, efforts have been underway for some time now to correct TDS level issue and bring reporting back within compliance as follows: Hydro Services & Supplies, Inc. (Hydro) engineer services were retained in July to devise a scope of work and provide associated costs to get the RO system running properly, efficiently, and with an effluent that is in compliance with State guidelines. On August, 19, 2020, we received a report and quote for replacement of RO control board, feedwater solenoid valve, and low pressure switch (see attached invoice). The RO has been shut down since July and has remained shut down. We anticipate the RO system will not start processing water until all necessary repairs have been completed by Hydro, and the effluent TDS is within compliance. This information has also been provided to the Raleigh office as it relates to permit application and renewal. Please see attached. Please let us know if you have any questions. Thank you, Elena Potter Elena Potter Executive Assistant and HR Manager 6500 South New Hope Road I Belmont, NC 28012 Office: 704-829-1290 Mon 1 August 20, 2020 Brianna Young North Carolina Department of Environmental Quality Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 VIA: E-mail and USPS Mail Re: Draft NPDES Permit NCO088694 Dear Ms. Young: We are in receipt of your letter dated July 22, 2020 regarding the draft permit referenced above. After careful review, we would like the following taken into consideration prior to issuing a final permit. Efforts have been actively underway to correct reporting concerns as follows: Hydro Services & Supplies, Inc. (Hydro) engineer services were retained in July to devise a scope of work and provide associated costs to get the reverse osmosis (RO) system running properly, efficiently, and with an effluent that is in compliance with State guidelines. On August, 19, 2020, we received a report and quote for replacement of RO control board, feedwater solenoid valve, and low-pressure switch (see enclosed quote). The RO was shut down shortly after receiving the aforementioned notice from the State, and has remained shut down since. We anticipate the RO system will not start processing water until all necessary repairs have been completed by Hydra, and the effluent TDS is within compliance. With regard to Item No. 6 in your letter, we ask that in consideration of the steps taken that reporting will be allowed to continue as one per month instead of the proposed two per month. Picase let me know if you have further questions regarding this matter. Thank you. Sincerely, Jeff Wuilliez Director of Horucullure and Facililies Enclosure:ep: Quote No. 220S06-0 6500 South New Hope Road I Belmont, NC 128012 QUOTATION �Suppl�. To: - Attm Jeffrey Wuilliez Daniel Stowe Botanical Garden 6500 South New Hope Road Belmont, NC 28012 704-829-1282 Page: 1 1 1 Date: August 7, 2020 Quotation #220S06-0 Frorn: Hydro Service & Supplies. Inc. Tony Dimino 513 United Drive Durham, NC 27713 919-544-3744 REFERENCE TERMS FREIGHT DELIVERY Iw NET 30 Prepaid 2 Weeks EQUIPMENT PART # QTY PRICE PER EXTENSION Hydro shall provide one (1 ) replacement RO Controller and feed water solenoid valve for the existing Marlo MRO-3600- 4-L P. Replacement Parts Valve Solenoid NC 3/4" Mario 68176 1 ea Feedwater Low Pressure Switch, 10E-10 99971-1 1 ea Circuit Board for S100 Controller I I 99971-2 1 ea Labor Installation Labor 04991 1 Is Notes: - Sales Tax is not included with this quotation. - Freight is included. Installation and Start -Up labor is included. SIGNATURE FREIGHT SUBTOTAL $25.00 $ 2,061.00 $ 2,086.00