Loading...
HomeMy WebLinkAboutSW6190901_Add Info_20191213ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Jeffery A. Nobles, PE 1333 Morgantown Road, Suite 201 Fayetteville, NC 28305 NORTH CAROLINA Environmental Quality December 13, 2019 Subject: Request for Additional Information Stormwater Permit No. SW6190901 Hoke Landing Phase II Hoke County Dear Mr. Nobles: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on November 11, 2019. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Original Comment 2 — "Sheet C-01 is missing a scale bar (Section VI, 8f)." This sheet is still missing a scale bar showing the scale of the main section of this sheet. It is noted that the project location insert is labeled as "NTS". Please provide a scale bar for the main section of this sheet. 2. Original Comment 6, b, vii — "Line 10, DA 1 — These values should match the corresponding values from the table in Section IV, 10." Please add the future BUA amount, as shown in Section IV, 10 of the application, to the Supplement-EZ Form. 3. Original Comment 6, c, i — "Line 2 — This value should be the WQv (1" storm)." The WQv, as shown in the provided calculations and on the Drainage Area sheet of the Supplement-EZ Form, is 18,926 cf. Please use this value. 4. Original Comment 6, c, viii — "Line 44 — The forebay exit must be shallower than the forebay entrance." Per Wet Pond MDC 5(b), the forebay entrance shall be deeper than the forebay exit. 5. Original Comment 7 — "Please show the stormwater maintenance access and easement on the plans (General MDC 8 & 9)." It is noted that the maintenance access is shown on the plans, however the easement is not included. The easement should include the D EQ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA _ o.PaWnamofEnvironmental Quality /� 919.707.9200 maintenance access, and the entire footprint of the SCM system (including the side slopes, forebay, riser structure, outlet, dam embankments, emergency spillway, etc...). 6. The project percent impervious area shown in Section IV, 8 of the application (74.53%) does not match the value shown on the Supplement-EZ Form (79%). Please revise for consistency. 7. Per our phone conversation on 12/12/2019, since the project area will not be sold off in the foreseeable future, deed restrictions limiting the BUA per lot are not required. Please let me know if you would like to keep the previously provided deed restriction included in this permit or if you would like it to be removed. 8. Sheet C-06 — The pond inset shows the bottom elevation of the forebay as 238. Please revise for consistency with the provided stage storage table and calculations. 9. Supplement-EZ: a. Cover Sheet: i. Please provide an original, signed and stamped Supplement-EZ Form. b. Drainage Area: i. Line 18, Entire Site — This item is not required. c. Wet Pond: i. Line 25 — The elevation of the temporary pool should reflect the elevation of the design volume, 18,926 cf, in the storage area above the permanent pool. The provided elevation is incorrect since, per the provided stage storage table, the volume of water that can be stored above the permanent pool at elevation 245.75 is 22,440 cf, which is larger than the design volume. The correct temporary pool elevation should be somewhere between elevations 245 and 245.75. ii. Line 26 — The surface area of the main pool at the permanent pool elevation should not include the forebay. Per the provided stage -storage table, the main pool surface area at the permanent pool elevation is 9,137 sf. Please use this value. iii. Line 27 — Similar to the previous comment, the volume of the main pool at the permanent pool elevation should not include the forebay. Per the provided stage -storage table, the main pool volume at the permanent pool elevation is 30,270 cf. Please use this value. iv. Line 28 & 29 - Equation 2 in the Manual calculates the average depth of the wet pond as the main pool volume (at the permanent pool elevation) divided by the main pool surface area (at the permanent pool elevation). For these calculations, the forebay portion of the wet pond should not be included. Per the provided stage -storage table, the main pool volume is 30,270 cf and the main pool surface area is 9,137 sf. Please use these values to calculate the average pool depth (Line 28) to be used with the SA/DA tables. v. Line 32 — Please use the value from the provided stage -storage table for the forebay volume at the permanent pool elevation, 5,326 cf. vi. Line 40 — Please use the corrected elevation from Line 25 to recalculate the drawdown time for the temporary pool. vii. Lines 43 & 44 — The depth of the forebay, as shown on the pond cross- section of sheet C-06 is less than the reported 72 inches. Please revise for consistency. 10. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW Project Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 12, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6190901 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or (919) 707-3646. Sincerely, Jim Farkas Environmental Engineer Stormwater Program cc: Fayetteville Regional Office