Loading...
HomeMy WebLinkAbout20180755 Ver 1_DA00425 - Preconstruction Meeting Permit Review_20200909 Carpenter,Kristi From: Williams, Paul C Sent: Wednesday, September 09, 2020 7:16 AM To: Barnes, Kyle W SAW; Daisey, Greg; Ward, Garcy Subject: FW: [External] RE: DA00425 - Preconstruction Meeting/Permit Review Please see the email string below in regards to dewatering the site at the B-5606 Bridge#11 Project in Perquimans County. Thanks, Paul C.Williams,Jr. Division Environmental Officer Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax cwilliams2 aMcdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Finadd corrood on do eo do and from this a d dr000 sublocd do tho North Carolina Public Rocor do Law and may duo diselosod do third d artioo. I mall Coors;,,Icoirdeirc.c to aid from tlri,,',coder I:,aulcjec.t to the IV C I'Wol:Record',I ow aid may be di,,c.1oacd to Mind Icartie„,, From: Fred Morin <Fred.Morin@stwcorp.com> Sent:Tuesday, September 8, 2020 11:36 PM To:Williams, Paul C<pcwilliams2@ncdot.gov>;Tatum, Brandon J <bjtatum@ncdot.gov>; Otts, David B <dbotts@ncdot.gov>; Midgett, Randy<rmidgett@ncdot.gov>; Stallings, Robert T<rtstallings@ncdot.gov>;John Whitley Jr. <John.WhitleyJr@stwcorp.com> Cc: Spear, Caitlin A<caspear@ncdot.gov>;John Whitley Jr. <John.WhitleyJr@stwcorp.com> Subject: RE: [External] RE: DA00425- Preconstruction Meeting/Permit Review ...................................................................................................................................................................................................................................�...............................................�.............................................................................................................................................��................�................................................................................................................................. a qu 111@'aisOiNiiu o \\ � � ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1 Paul: We will attempt to extract the piles, per the permit, using a vibratory extractor. This is the only method to perform this task. In order to do so we need to lower the water level to expose enough of the pile to fasten the extractor to the pile. The equipment cannot be submerged and it would not be safe to perform this procedure without lowering the water level. Please feel free to contact me with any questions. Fred Morin Project Manager Structures S. T. Wooten Corporation P.O. Box 2408, Wilson, NC 27894 3801 Black Creek Road Wilson, NC 27893 mobile 919.437.0225 office 252.291.5165 fax www.stwcorp.com us, In 111111111111 ma� The information in this email and in any attachments is confidential and may be privileged. If you are not the intended recipient, please destroy this message, delete any copies on your systems and notify the sender immediately. You should not retain, copy or use this email for any purpose, nor disclose all or any part of its content to any other person. From: Williams, Paul C [mailto:pcwilliams2@ncdot.gov] Sent: Friday, September 04, 2020 2:43 PM To: Fred Morin; Tatum, Brandon J; Otts, David B; Midgett, Randy; Stallings, Robert T; John Whitley Jr. Cc: Spear, Caitlin A; John Whitley Jr. Subject: RE: [External] RE: DA00425 - Preconstruction Meeting/Permit Review Fred, Thanks for the response. Just want to remind you the CAMA permit has a Special Condition that"All pilings (including relic pilings) shall be removed entirely"for the demolition of the existing bridge. If a pile breaks during the removal process, we'll have to notify DCM of the location of the pile for their records. Since the existing piles have to be removed, will you still need to dewater the site for demolition? Thanks, and give me a call if you would like to discuss. Paul C.Williams,Jr. Division Environmental Officer 2 Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax cwilliams2 aMcdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 . A Finadd oorrood on do aoo do and from this a d dr000 sublood do dd?o d ortd? Carolina Public R000r do Law and may duo diselosod do third d artioo. I mall c;orra;,,Icoirdcirc.c to aid from tlri,,',coder I:,aulcjec.t to CI"1c IV C I'Wol:Record',I ow aid may be di,,c.1oacid to Mind Iportio„,, From: Fred Morin <Fred.Morin@stwcorp.com> Sent: Friday, September 4, 2020 12:05 PM To:Williams, Paul C<pcwilliams2@ncdot.gov>;Tatum, Brandon J <bitatum@ncdot.gov>; Otts, David B <dbotts@ncdot.gov>; Midgett, Randy<rmidgett@ncdot.gov>; Stallings, Robert T<rtstallings@ncdot.gov>;John Whitley Jr. <John.WhitleyJr@stwcorp.com> Cc: Spear, Caitlin A<caspear@ncdot.gov>;John Whitley Jr. <John.WhitleyJr@stwcorp.com> Subject: RE: [External] RE: DA00425- Preconstruction Meeting/Permit Review ...................................................................................................................................................................................................................................................................................................................................................................................................................�,.�............................�.................................................................................................................................. \\ ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Paul: The substructure on this bridge is below the water level. In order to remove the caps from the piles the water will have to be lowered so we can expose a portion of the pile to cut it and to rig it for removal. Right now we are unsure of what kinds of piles were used since you can't see them. Once we know we can determine the best method of removal. These could be breaking at the mudline, extracting with a vibratory hammer or cutting at the mudline. All of these require at least a portion of the pile to be exposed. Fred Morin Project Manager Structures 3 TE S. T. Wooten Corporation P.O. Box 2408, Wilson, NC 27894 3801 Black Creek Road Wilson, NC 27893 mobile 919.437.0225 office 252.291.5165 fax www.stwcorp.com I IIIII 111111111111 0I1111111111111111�� The information in this email and in any attachments is confidential and may be privileged. If you are not the intended recipient, please destroy this message, delete any copies on your systems and notify the sender immediately. You should not retain, copy or use this email for any purpose, nor disclose all or any part of its content to any other person. From: Williams, Paul C [mailto:pcwilliams2@ncdot.gov] Sent: Friday, September 04, 2020 7:42 AM To: Fred Morin; Tatum, Brandon J; Otts, David B; Midgett, Randy; Stallings, Robert T Cc: Spear, Caitlin A; John Whitley Jr. Subject: Re: [External] RE: DA00425 - Preconstruction Meeting/Permit Review Fred, Still getting questions on the cofferdams. Can you provide more details on why demolition of the existing bents require dewatering? Thanks, Paul C. Williams,Jr. Division Environmental Officer Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax pcwilliams2@ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Fred Morin <Fred.Morin@stwcorp.com> Sent:Thursday, August 27, 2020 2:10:56 PM 4 To:Williams, Paul C<pcwilliams2@ncdot.gov>;Tatum, Brandon J <bitatum@ncdot.gov>; Otts, David B <dbotts@ncdot.gov>; Midgett, Randy<rmidgett@ncdot.gov>; Stallings, Robert T<rtstallings@ncdot.gov> Cc: Spear, Caitlin A<caspear@ncdot.gov>;John Whitley Jr. <John.WhitleyJr@stwcorp.com> Subject: [External] RE: DA00425- Preconstruction Meeting/Permit Review ...................................................................................................................................................................................................................................................................................................................................................................................................................�,.�............................�.................................................................................................................................. \\ ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Paul: It will need to be in place in order to remove the existing bridge then pour the Bent in the water. I would say 3-4 weeks each side. Thanks Fred Morin Project Manager Structures f S. T. Wooten Corporation P.O. Box 2408, Wilson, NC 27894 3801 Black Creek Road Wilson, NC 27893 mobile 919.437.0225 office 252.291.5165 fax www.stwcorp.com II us, I IIIII 111111111111 NMI�� The information in this email and in any attachments is confidential and may be privileged. If you are not the intended recipient, please destroy this message, delete any copies on your systems and notify the sender immediately. You should not retain, copy or use this email for any purpose, nor disclose all or any part of its content to any other person. From: Williams, Paul C [mailto:pcwilliams2@ncdot.gov] Sent: Thursday, August 27, 2020 7:10 AM To: Tatum, Brandon J; Fred Morin; Otts, David B; Midgett, Randy; Stallings, Robert T Cc: Spear, Caitlin A; John Whitley Jr. Subject: RE: DA00425 - Preconstruction Meeting/Permit Review 5 Fred, The agencies may ask about the timeframe for each phase of the cofferdams. Approximately how long do you anticipate each will be in place? Thanks, Paul C.Williams,Jr. Division Environmental Officer Division One NC Department of Transportation (252)482-1861 office (252) 333-9812 mobile (252)482-8722 fax pcwilliams2@ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 � f 3 Ermail correspondence to nad from this address is ub/ t to the 6 dV rth Carolina PublicRecords Law and may be disclosed to tIlird parties, all correspondence spoindenc e to and from this sender is:subject to the N.C. I""lulolic.I:ac;ords avv and'clay be disclosed to third parties. Original Appointment From:Tatum, Brandon J <bitatum@ncdot.gov> Sent:Thursday, August 6, 2020 8:57 AM To:Tatum, Brandon J; Fred Morin; Otts, David B; Midgett, Randy;Williams, Paul C; Blankenship,Andrew; Stallings, Robert T; Shook, Ryan L Cc: Spear, Caitlin A; Hoadley,James W;John Whitley Jr.; Davis,Justin K Subject: DA00425- Preconstruction Meeting/Permit Review When:Tuesday, August 25, 2020 9:00 AM-11:00 AM (UTC-05:00) Eastern Time (US&Canada). Where: Bridge#11 on SR 1338 (Wynne Fork Rd) all correspondence spoindenc e to and from this sender is:subject to the N.C. I""'ululic.I ec;ords avv and'clay be disclosed to third parties. all correspondence spoindenc e to and from this sender is:subject to the N.C. I""'ululic.I ec;ords avv and'clay be disclosed to third parties. all correspondence spoindenc e to and from this sender is:subject to the N.C. I""'ululic.I ec;ords avv and'clay be disclosed to third parties. all correspondence spoindenc e to and from this sender is:subject to the N.C. I""'ululic.I ec;ords avv and'clay be disclosed to third parties. 7