Loading...
HomeMy WebLinkAbout20030204 Ver 1_Complete File_20030221}?JATLc O R Michael F. Easley, Governor QG O? William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ? 7 t Alan W. Klimek, P.E. Director Division of Water Quality fl ? March 6, 2003 Madison County DWQ Project No. 030204 SR 1315 (Tater Gap Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. F.D. Martin, P.E., Division Engineer NCDOT Division 13 P.O. Box 3279 Asheville, NC 28802 Dear Mr. Martin: You have our approval, in accordance with the attached conditions and those listed below, to impact 80 linear feet of three unnamed tributaries to Shelton Laurel Creek in order to upgrade SR 1315 (Tater Gap Road) in Madison County. The project should be constructed in accordance with your application dated February 17, 2003 (received February 21, 2003), including the environmental commitments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us, in writing, and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in.the.future) exceed one acre or stream impacts exceed 150 linear feet; compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. NCDOT shall use Best Management Practices for the Protection of Surface Waters (NCDOT March 1997). 2. Sedimentation and Erosion Control Guidelines for Sensitive Watersheds [15A NCAC 4B .01241 shall be implemented prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. 3. Stormwater should be directed to buffer areas or retention basins and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for storm water sheet flow. 4. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 15, or other conditions as determined by the North Carolina Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during construction. 5. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC,27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/newetlands/ Am? KDENIZ 6. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and to reduce the likelihood of introducing other pollutants into the stream. 7. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of streams waters from fuels, lubricants, hydraulic fluids, or toxic materials. 8. The pipes required for this project shall be installed in such a manner that the original stream profile is not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions (including the pattern and profile) are to be maintained above and below locations of each culvert. The culvert shall be designed and installed to allow for fish and other wildlife movement as well as prevent headcutting of the streams. If any of the existing pipes are perched, they shall be removed and replaced, and installed correctly. 9. NCDOT must submit a plan for written DWQ approval to address any headcutting that will occur as a result of this project. 10. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. Rip rap shall not be placed in the stream bottom. 11. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate. of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Beth Barnes at 919.715.8394 or Mr. Mike Parker of the Asheville Regional Office at-828:251,620& , - .. - .. - -- „ --- . . Sincerely, Attachment Pc: i ` k, P.E. wilmington District Corps of Engineers Steve Lund, USACE Asheville Field Office Mike Parker, NCDWQ Asheville Regional Office Central Files File Copy 1 j 401 ISSUED FILE COPY ?' STATL a y? ••*=tea STATE OF NORTH CAROLINA 030204 DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR Mr. Steve Lund PO BOX 3279, ASHEVILLE, NC 28802 February 17, 2003 US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Nationwide Permit #14 SR 1315 Tater Gap Road State Project No. 6.862288 (DWQ Minor Permit Fee $200) Madison County, NC Dear Mr. Lund: I have enclosed a straight-line diagram with erosion control plan, a PCN application for NWP #14, and a vicinity map relative to the proposed project on SR 1315, Tater Gap Road, Madison County, NC. Tater Gap Road is currently a 12-14 feet wide gravel road. Division of Highways plans to pave the road 18 feet wide and increase the typical section. Grading will be moderate. We propose to extend three existing culverts on three UT's to Shelton Laurel Creek. Total culvert extensions will be 80 feet. Existing channel morphology will be maintained upstream and downstream of the culvert. The culverts will be placed below existing streambed elevation. Riparian vegetation will be reestablished along disturbed areas associated with the culvert extension. Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering streams. No stream relocation will be performed for the project. In situations where a stream parallels the existing roadway, best management practices adopted by DOT require that the proposed widening occur on the side opposite the stream. To the extent practical, the shoulder adjacent to the stream will also be widened to increase the vegetated buffer area between the roadway and streams. In addition, erosion control measures for sensitive areas will be installed, including silt fence and a diversion berm. SECRETARY FEB 2 ! 20m L_ WETLANDS G}t0 ?yAiEi, J,a! tTY ?' ac ...... . ..:: ... f l Mr. Steve Lund Page -2 SR 1315, Madison County February 17, 2003 No significant effect on federally listed species (threatened or endangered) or their habitats is anticipated. By copy of this letter, we request Owen Anderson, North Carolina Wildlife Resources Commission Mountain Region Coordinator, to comment directly to the Corps concerning the permit request. By copy of this letter, we are asking Ed Ingle, Area Roadside Field Operations Engineer, to comment on the above project. Temporary encroachment into the buffer zone of the UT's to Shelton Laurel Creek will be required from Station 10+00 to 28+00. The streams are not classified as trout. A buffer variance will not be required. By copy of this letter, I am forwarding seven (7) copies of the application package to Cynthia Van der Wiele, NC DENR, Division of Water Quality, 401/Wetland Unit for review and comment. Please charge the application processing fee of $200.00 to work order # 6.862288. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer. Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs, please contact me at (828) 251-6287. Sincerely, Ro r D. Bryan Division 13 Environmental Officer Enclosures cc: J. J. Swain, Jr., P.E. K. A. Wilson, P.E. Ron Brazil Ed Ingle Owen Anderson Cynthia Van der Wiele Office Use Only: 0 30 204 Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing Check all of the approval(s) requested for this project: X Section 404 Permit ? Section 10 Permit X 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: NC Department of Transportation Mailing Address: P.O. Box 3279 Asheville, NC 28802 Telephone Number: 828-251-6287 Fax Number: 828-251-6394 E-mail Address: rdbryan(a,dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1315 Tater Gap Road 2. T.I.P. or State Project Number (NCDOT Only): 6.862288 3. Property Identification Number (Tax PIN): 4. Location County: Madison Nearest Town: Hot Springs Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): SR1315 is located off of NC 212 on the upper end of the Shelton Laurel Community. 5. Site coordinates, if available (UTM or Lat/Long): 35 59'11"N 82 39'58"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Existing secondary road 7. Property size (acres): 2.2 8. Nearest body of water (stream/river/sound/ocean/lake): UT's to Shelton Laurel Creek 9. River Basin: French Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 2 of 8 10. Describe the purpose of the proposed work: We propose to grade, drain, base, pave and install erosion control measures for SR 1315 (Tater Gap Road). We propose to extend three existing culverts on UT's to Shelton Laurel Creek. Total stream impacts will be 80 linear feet. The culverts will be installed to insure aquatic life passage within the stream. 11. List the type of equipment to be used to construct the project: Excavator, backhoe, an d trucks. 12. Describe the land use in the vicinity of this project: Rural and wooded. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No, no future plans. VI. Proposed Impacts to Waters of the United States/Waters of the State it is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Type of Impact* Area of Located within Distance to 1 71 Page 3 of 8 Site Number (indicate on ma) Impact (acres) 100-year Floodplain** (es/no) Nearest Stream linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.?7,ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0.0 Total area of wetland impact proposed: 0.0 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) 18+57 Culvert 30 UT 1 to Shelton Laurel 1 P 29+71 Culvert 20 UT 2 to Shelton Laurel 1 P 42+52 Culvert 30 UT 3 to Shelton Laurel 2 P * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, «-vw.mapauest. com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 80 feet. Page 4 of 8 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site-layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing secondary road must be improved to meet current safety standards for paved roads The culvert extensions requested are the minimum necessary to establish an appropriate typical section for the roadway. Riparian vegetation will be established on disturbed areas associated with the project construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 5 of 8 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.usl'ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp://112o.enr.state.nc.us/wm/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes X No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure ' whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No X If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify, )? Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The existing compacted gravel roadway acts as an impervious surface. Paving of the roadway should eliminate sedimentation from fines associated with gravel surface treatment. The roadway surface will be 40% of right of way acreage. Stormwater will be diverted through settling basins or grass lined buffers prior to entering the streams. XII. Sewage Disposal (DWQ Only) XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). With regard to hazardous spill basins, the road is not classified as an arterial route, therefore hazardous spill basins are not required. Z1/ ? Api6cant/Agent's S finature /Date (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 8 of 8 I \? Vicinity Map: SR 1315, Tater Gap Road, Madison County, NC (White Rock Quadrangle, Scale 1:24000). N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY SUBJECT: sq /3/5 -ATEe GAG ;eoA D LOCATION: F &m j /34 To ?.o. n?. WORK TYPE: 9RA.DE, ,DRA1N, 23A5E y PAYE WORK ORDER: PRIORITY: COUNTY: /?IAOisoti TOWNSHIP: LAU25 L DATE: 1-28 -o.3 SCALE: /'-* = so' NOTES: ExiSri,uG 6o' R/w PREPARED BY: elo. 6-. z . EROSION CONTROL DETAILS AND SPECIFICATIONS Std. # Description Symbol 245.03 Temporary Slit Ditch---------------- T SD 245.05 Temporary Diversion-------------- -? T D -.- 893.01 Temporary slit fence------------- -?- 890.05 Temporary Slope Drain with Earth Berm----- AL 245.01 Silt Basin Type A------------------------------ --0 245.02 Silt Basin Type B------------------------------ 892.04 Temporary Rock Silt Check Type A----------- 895.10 Temporary Rock Silt Check Type 8----------- 892.01 Temporary Rock Sediment Dam Type A------- 892.02 Temporary Rock Sediment Dam Type 8-------- 897.01 Rock Pipe Inlet Protection-------------------- Pipe Outlet Energy Dissopotor---------------- V.-. 894.01 ------------------ Rock Silt Screen------------- 245.04 Stilling Basin------------------------------------ vl? Rock Inlet Protection: 896.01 Type A --------------- A LU 896.02 Type B--------------------------------------- BU 896.03 Type C--------------------------------------- C Erosion Control Matting--------------- ECM Fiberglass Roving---------------------- FGR EROSION CONTROI PLAN SHEET Silt fences and temporary silt ditches shall be installed after clearing and before grading. Temporary stone ditch checks shall be installed as soon as ditch-line is established. Pipe outlet and inlet protection will be done as soon as the pipe is installed. Silt basins (Type B) will be constructed to the dimension of nine feet by three feet by two feet unless otherwise noted on plans. (See SB-9 on dimension sheet) Seeding and other permanent erosion control measures are to be implemented as soon as practical. Temporary rock silt checks (Type B) will be spaced as required by percent of grade. DESIGN FOR SILT= BASIN NOT TO SCALE CHECK EVERY STORM EVENT AND CLEAN OUT WHEN HALF FULL. 600 CUBIC FEET PER ACRE. r? z ( S.B. 7 ) 91 2' T- r(j:::: (S.B. 9 ) LENGTH OF DISTURBED AREA 21 :E ( ( S.B. 14 ) 100' LENGTH OF DISTURBED AREA 200' LENGTH OF DISTURBED AREA 300' r1 LENGTH OF DISTURBED AREA 400' PIPE INSTANTIATION NOTES 1) Install erosion control devices. In streams, where necessary, rock silt screens will be used. 2) Remove material and existing pipe while limiting, as much as possible, material and sediment from entering the stream and/or escaping from the project. 3) Prepare pipe foundation while again taking care to limit, as much as possible, material and sediment from entering the stream and/or escaping from the project. Where possible, new grade will be below the existing streambed. If needed, bedding material will be clean stone. 4) Place the new pipe and compact backfill. 5) Install slope protection on outlet and inlet ends of pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measures. 6) Establish permanent vegetation as soon as possible. ROADWAY DITCH AND MEDIAN LINING GUIDELINES Percent of Grade Type oFLinino- Recommended 0 S Craw and Tack 2 -4rosiori• Control Matting 3 4 Synthetic Roving 5 greater Stone VIII- 2 March, 1993 PIPE OUTLET ENERGY DISSIPATOR: • A pipe outlet energy dissipator shall be used at pipe outlets to slow the water velocities when it exits the pipe and flows out ditched or natural waterways. It is an apron of stone of a sufficient thickness to protect the outlet area from scouring out and causing off-site sedimentation damage. Pipe outlet energy dissipators should be built according to the guideline chart shown on page VII-3 of this manual. AREAS OF USE: f • Outlets of pipes' and culverts to prevent scouring... DESIGN CRITERIA: • In accordance with chart on page VIII-3. • Filter fabric, or six inch layer of gravel, shall be used under stone. MATERIALS: • Filter fabric shall meet requirements of section 1056 of Standard Specifications for Roads and Structures, January 1, 1990, for type II filter fabric. VI-34 March, 1993 1 ?- 3 -? iz me ¢t ?U oc c mD a 0 4) , s o i i LL Z ' .4 m c m b c C O c mU m a OL ?-a 1.4 cz Q CO 0 N y W y V d ? L w? W a Q C O v v ? a o w cs. i. o o O O ? V if If CL • VI-35 March, 1993 s.. 0 M ?p I?RI w? y llz 0 a c 0 d 1 TEMPORARY SmT DITCH: TSD -- A temporary silt ditch shall be used in place of silt fence in many situations. Temporary silt ditches shall be used at the toe of fill slopes to diveitrunoff into sediment basins, temporary rock sediment dams, temporary rock silt?hecks and/or other sedimentation control measures. Temporary silt ditches are approximately 1 ft: deep,-2:1- side slopes with an optional earth berm. AREAS of USE: Toe of fill slopes where fill exceeds 3 ft in vertical height. • Along streams to intercept flow and/or divert to a controlled outlet. VI-2 March, 1993 VI-3 March, 1993 TEMPORARY SILT FENCE: A temporary silt fence is commonly used at the toe of a fill section to prevent off- site sedimentation. It is made of permeable filter fabric buried at the bottom; stretched and supported by steel posts. The silt fence reduces the water flow while retaining the sediment. They may also be used to divert water flow to protected outlets. Silt fences need to be checked after each significant rainfall to ensure there effectiveness. They must be maintained on a regular basis. Silt fences shall not be installed across streams, ditches, or waterways. AREAS OF USE: • At toe of fill sections where sediment runoff can be stored and contained inside the project limits. DESIGN CRITERIA: Material With Wire Without Wire Fabric Type 3 Class A Type 3 Class B Steel posts length 5 ft 5 ft. Post spacing 10 ft. 6 ft. maximum VI-6 March, 1993 FA LLo LL) FA LLOW NOTE: LUSE TEMP ROCK SEDIMENT DAMS TYPE 8 ON ALL TURNOUTS & DRY CROSS PIPES 2. USE SILT FEN. OR TSD ON ALL 2' FILLSLOPES. 3. U_ SE (S.B. 9 ) WHERE NEEDED ON PROJECT SR?31A•_____ I I I I 1 I , . I I I I ? I I 1 I i I I I I I I - , t - I I - I I 1 GPI I ? 14{ td I I : ?, 7$ I ? I ? I I - I I I ?I I w 1 ?I I ?I I I i V164 I I II I . II I I I ? !t I I I Vr I I ? ? ?? I I v) V I ? "} W I.u I W k I W W 1 1 V O I I Il 1 I t 1 1 ®jl 21 ??1c4 1 i I i I I 1 I I I I I I 1 , t I I ? I I ? t I ? I I V)I I • 1 I I 1 I ? t ? I $ 1? I I - ?99 Woobs WOODS LAwnl ?7A t_LL W t t? I I i I I w I i w 11r) I t 1 t 1 I Z I I I I I I I I _ , 1 I y h I I t I t I I tl?1 i t 9 I l I ' i I_ I a t l = l t Y I i I 1 I 1 I Q 1? t I I i • ? X ?i= 19 ti I I I ? t: t 1 I t •? I j 4 ` ??9 I I S ? I I I J I I , ? -• ? A,ur< I ? t I 3o'-Z`F"CM P (EXT. 7,:> G69 WOODS Woo b 5 FAuow F4 LLDKJ , 1 . I I I . I I I I , ` I I I i I I I t? I I I I I I ' t t i I , I - I - , I ' I I t ' I 1 ?; t <\ I ' f I 3 • ? Pc WWDS r Y, h o Z ?I 4 w' ?I i 221® q?7?? I t I I I I I I I I I i I I 21j I _ I e TuKNOtTi I ' y ml ' I I I 1 I t,?7 ?• LJoo p S Vdc` D 5 Wc>ooS , 1 I I I I , , WOR_De_ (?C I P c Y , I I , 1 ? 1 I I ql \ ' I I 1 ? , I I , H ?q h I I I I I I , , ? O I I I I ? ' • ? 8 $ i ? ? I ' I I j I I I Tc: ? I I I I , I `, I i 8 I I ?uf.,out ' I I I I I ' z ? q i71 lg ? ? • I ' I 1 of i 21 h • • , ? ?y I l? I • I I I LEI ?L I I I , I I 'S I I ell i :? I I I I I I I I v I ?? i W 9 I I I c ?I I 3 I ?. I . • I ?7 I I 40'-24°cmP (E xT. To !oo) WOODS WarE,e [.we Cie-css=s UaJ D e e Bore D t??? 5 1 t I 5 I Q I0 I. I t I I I ? I ? \ I t ? (?C I 1 Pe I ' I ? t ? 1 ' i ? , I ? ?Igl? ? I ' FALLOW I i I ? 1 , I ' I ' I i I I I i ? I ' I 1 I i I I I ? 1 , I I I ? FALLOV/ ? ?, ' 30'-18"CMP t ??xi. Ta (o I ? I I ? I a7o I t -1- 20' I • I I EiP ; ? _ I I I I I I ? Wa?DS ? I? I I ,? I I I I I to 12 i ? i i I I I I , t4 I I • I t I I I 1I Wmvs FALLOa WvoL)S I •? R4 ; i I I I I I ?" I I I 1 I I , I 1 I I I I 1 1 I I ! TIM. I I I I I I I I 4 I I e I I V I I I t 41 I I ? 1 , I YI I I I I i I ?+ I I 21 , i o ! I I 1 I I I I ? I , ®i 37 I f I I , I ?I I I I I 1 3 1 ? I J! I I I I I I I I I I I I I; •I? 30,-(8"CM P t Exr, To lo,) v /W-/8"C/1 P (Err ?v 60') Wood 5 Woo> I ?I 1 • I /// 0 j ?NorE : l?ocx L/?D DITGN I i i - • Fror» ETA 44roo I q I To 5rA 53? ?I I I I I I I I - I I I I 4 I I 4 ;I WooDS 12 I 8 , g WOODS I I I I I I , , , T.-.St I I I I I 1 I 1 , I 1 e I I I I i ®I ? 1 I I I t I 1 I i 1 I I ? I I W I ? 3?'-3C?'GMP (Exr.To?O'? I i I I ?yF ? KGU, I I 3 I ; I I I ? h ? ??T Z4 X8 41 ? o ? I I I I I ?I I ?I ?I I ?I I I I ?? i ? I I 7ueaauT FAac)W I •11 I I I 9 I I I woo OS I I I I I I I ?1 I V? I ®I I X19 9 ? I wont)-5 WOOb S 1 1 •, r. I I ( I 1 1 1 vi - I ® l? I ® I I ?I W60D S i ?"oP 60'-i8`CMP I • I i I 8 i ? l . i ; rI I I AC 1 LL. \ I I ? I I I I O ®i I I • ? g I I I p I I I I I I I I I I ;? I i , I •j /a I I I I .' I . b?? I I 1 I I i o? I I I I I • ) / 1 /d I I I I ' I le I t I I Woobs 8-1 MTL (CEP ?v/ZS'-?S"C/?'!P) a? I I II I I ' I ?I I i I I ' I I I I I I ? i p• Sort DK. FALLOW • ?77i ---- ----- - I I e? I I I I I 3o'-f8""GMD I I ?Ex r. Ta (oD'? NO7c: Cub ocxb-3, D,-14 Ar 5rA. 53+o0 r l,v(xb5 ?i I 1 1 I q I I I I I i I I I s?f I I 1 3 1 ? q? I I I ! ? 81 1 I I I I I I I •I °I ? I I ?I ? I led I 1 I ^K I I 1 I ? I 9 'r3 I ? h I I ? ' W i i I I I 1 I ! i O I I ?I I I h I I rJi I I? I ?? I ®i I I I I ? j u ro ? I I i i I 8 I I I ? I I •I I I I I I I I I I ?; I 117 1 FALL W woob's FALLDN/ i S6+SS END ;lee FALLbW r ..a .? •.?dig BALD , i' .. J.n?/? JJ!(rtl? LITTLE BALD '••1 J 1,. Q?? \ •'• se Pave YT0. - 1 FiCK4AUREC J.? ,' ; 1 c _• \ CANE CREEK BALD \WWM 1 MEA \ V •' , ?yi • ?• pp?? b ,,jF{y?'f. 1 \ ••\••? ?" / • ••\ 1312 ` L1A? • '. `OY • / • (r' 1 ° 1313 • I 3Yar i•'/.,_• - .? 1.4 ?? LIMESTONE-` J --+=--- ate. 0 6 e t3ll 1310 \ ?• ? •?• / ? of \ y? 1 '•?. o .pro oanatut ?' ? / 3\'a ? ?"\ ? i ham.. \ ? 0' /• ALUM 130MG N KNOB e.' .i.; / '/• 1Z1 ?•. 1313 ROLICK CK ?i 1307 v .a t \ 31!L3 / 1314 ' lair r 5 t ?• o ''?.•/• 1306 .0 t (!.!• 14 .11 1341 `I ,. $ /" '.?? 1 fat.- •??° '3 / ..'•, / ??' ry 1.3 1333 2.9 /, .• RICH ;MITCHELL KNOB KNOB \• •'\ ®3. S << 1 n. 6 136 Co 1330 IaNA ?..,,KNOB 13 3 ' / • ? 'I'lp[ • / ••' LITTLE .mil • ••\ /' ? ??' l / • y ? o?.nwlen :t: / .?l': i • ? . % y? i •• , ?""4 11 9• 1 1341 134 .[ .6 .A . .M 131 1318 1337 . , 1 1342 \ 1 i 1 WILDLIFE \ /•7 ?' ?" 1319 '?`??1 ?''?.. a/gp\<, :?• o \• 1 • • \ \ r • ?\ ?.. f% .1 ?\ •?.. IAN 1413 1336 .?. .1 13' 3 F7 ?0'r clw r .L. . `• N l 1322 1336 /) }7 N 1 1 1 \•t d .?1 + 1316 /o •9 _ / ? 1320 p3 - tYl? 1 4 \ J ••1 O ?• Ia3 \ .a •\•1 , WALNUT 1 1 1a47 p I?t? O •Q 1 ?? • ; ' + \ 1 KNOB \ SODOM 1 ! t324 1323 ,2 1335 S L9 1432 let 3 MT. •.1 ? ° 1411' 1339 / / B: t • / 1 1326 1370 13-5 NOT SFKHOS \ h 1 ? •'?./ 1319 !4 POP. Q6r \\. /....? ^' l"u .2 ?C ^, r? •p1323 J Ilso > 1 •\ ?.e •YF /:??p? _ giF/ FRFJIOM / \ \ /? ' •x •? ?? :d f 172 \ .[b../• I ao ! ti.`. / are _ 119• 1152 Wd.A •. J ? 1131 ; " •? ' ?' • \ 11 A N l / IISI BARNARD \ • 71r • KNOB . 1371 ' S '' Itss ,?• "?/ Ir0 K• i F N'A rF Michael F. Easley, Governor C? 9Q William G. Ross Jr., Secretary 0 North Carolina Department of Environment and Natural Resources j _ Alan W. Klimek, P.E. Director Division of Water Quality Q ? DWQ Project No.: ?LOQ30;L-OY County: Applicant: ( )-- Project Name: / 1!9- - -, Date of Issuance of 401 Water Quality Certification: / 1Ga(I.Io?I Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC. 27699-1650. This form may be returned to DWQ by the applicant; the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, AM COq rr-f , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supportin materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetlands/ N MEM