Wanucha, Dave
From:Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent:Thursday, September 10, 2020 8:02 AM
To:Patterson, Robert D; Wanucha, Dave; Parker, Jerry A
Cc:'dmoore@rkk.com'; Howell, John; Harper, Aaron A; Hayes, John R; Eason, Patty P
Subject:\[External\] RE: U-3109 Site 2
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Thanks for the heads up, everyone. No disagreements or additional comments from the Corps.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: Patterson, Robert D <robert.patterson@ncdenr.gov>
Sent: Friday, September 4, 2020 11:51 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Parker, Jerry A <jparker@ncdot.gov>
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; 'dmoore@rkk.com'
<dmoore@rkk.com>; Howell, John <jhowell@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Hayes, John R
<jrhayes3@ncdot.gov>; Eason, Patty P <peason@ncdot.gov>
Subject: \[Non-DoD Source\] RE: U-3109 Site 2
I’m fine with the proposed change also. Thanks.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with
1
the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your
patience as we continue to serve the public during this challenging time.
From: Wanucha, Dave
Sent: Friday, September 4, 2020 11:43 AM
To: Parker, Jerry A <jparker@ncdot.gov>; Patterson, Robert D <robert.patterson@ncdenr.gov>
Cc: David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell, John <jhowell@ncdot.gov>;
Harper, Aaron A <aaharper@ncdot.gov>; Hayes, John R <jrhayes3@ncdot.gov>; Eason, Patty P <peason@ncdot.gov>
Subject: RE: U-3109 Site 2
Hi Jerry,
Thanks for the follow-up. I’m forwarding this information to our unit’s Stormwater Engineer for his review
and input. Robert may see something that I am not. I do not foresee any hiccups, but stay tuned. Thanks.
Robert,
Please review the info when you get a chance and let me know of any concerns. Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Parker, Jerry A <jparker@ncdot.gov>
Sent: Friday, September 4, 2020 11:24 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: David.E.Bailey2@usace.army.mil; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell, John <jhowell@ncdot.gov>;
Harper, Aaron A <aaharper@ncdot.gov>; Hayes, John R <jrhayes3@ncdot.gov>; Eason, Patty P <peason@ncdot.gov>
Subject: U-3109 Site 2
Dave,
This email is being sent to document the conclusions of the onsite meeting at
Permit Site 2 on project U-3109 on September 3, 2020. The meeting was
2
scheduled due to NCDOT’s concern about removing vegetation along the fairly
vertical banks of Mill Creek (see pictures) in order to install riprap on both sides of
the banks at the outlet end of pipes per the permit drawing (see attached). Due to
the apparent stability of the banks which was aided immensely by the existing
dense vegetation, NCDOT was reluctant to remove the vegetation in order to
replace with riprap. At the meeting, it was decided that instead of replacing the
vegetation with riprap, that NCDOT would retain the existing dissipator pad on the
north side of the creek and install a pre-formed scour hole at the outlet end of the
pipe on the southern side of the creek. A sample drawing of a pre-formed scour
hole has been attached. The southside pre-formed scour hole would be installed
more than 50 feet from the top of bank which would allow for sheet flow through
a vegetated buffer down to the creek. Impacts to the adjacent jurisdictional
stream would actually be lessened due to this proposed change. Please let me
know if you have any questions or if there is anything you would like to add prior
to NCDOT commencing the work. Thanks.
Jerry
Jerry Parker
Environmental Supervisor
Division 7
North Carolina Department of Transportation
336 256 2063 office
jparker@ncdot.gov
1584 Yanceyville St.
P.O. Box 14996
Greensboro, NC. 27415-4996
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.