Loading...
HomeMy WebLinkAbout20031175 Ver 1_Complete File_20030904yydo?STA7Ea ®31j75 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY August 21, 2003 Division of Coastal Management 151-B Hwy. 24 v ' t? Hestron Plaza II ?'Ce The purpose of this letter is to request a CAMA major permit for the construction of a new pedestrian bridge over Jean Guite Creek in Dare County. The North Carolina Department of Transportation is proposing to build a 114 feet long and 10 feet wide bridge that will serve as a walkway for pedestrians. This bridge will be place on existing bents on the US 158 bridge and 4 new H piles that will have to be placed in Jean Guite Creek. The bridge will have a wooden deck with steel H pile supports. Jean Guite Creek is a public trust water and carries the DWQ classification of SC. The proper forms and work plats are included with this letter along with notifications from the adjacent property owners. If any additional information is needed, please call Clay Willis at 252-482-5889. Morehead City, NC 28557 . 4 2003 Attention: Bill Arrington ERQU r C Sincerely, Don Conner Division One Engineer Clay illis Division One Environmental Officer Cc: Gretchen Byrum, NCDOT Ben Williams, NCDOT Bill Biddlecome, USACOE John Hennessy, DWQ Mike Thomas, DWQ Travis Wilson, WRC 113 Airport Dr., Suite 100, Edenton, NC 27932 - Phone: (252) 482-7977 Fax: (252) 482-8722 Pedestrian Bridge in Dare County l I 1 -1 ?7 ? r 'st j 7U ? 5j wj N N Form DCM-MP-1 0311' APPLICATION (To be completed by all applicants) b. City, town, community or landmark Martins Point, Southern Shores 1. APPLICANT a. Landowner: Name N. C. Department of Transportation Address 113 Airport Road City Edenton State N.C. Zip 27932 Day Phone (252) 482-7977 Fax (252) 482-8722 b. Authorized Agent: c. Street address or secondary road number US 158 (N. Croatan Highway) d. Is proposed work within city limits or planning jurisdiction? X Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) JEAN GUITE CREEK 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Name Clay Willis, Environmental Officer Address 113 Airport Road a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Construct a 113'11" x 10' pedestrian walkway bridge across Jean Guite Creek City Edenton State N.C. Zip 27932 Day Phone (252) 482-7977 Fax (252) 482-8722 c. Project name (if any) Pedestrian Bridge adjacent to bridge # 4, Dare County NOTE. Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Dare b. Is the proposed activity maintenance of an existing project, new work, or both? new work c. Will the project be for public, private or commercial use? public d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. The purpose of this project is to construct a pedestrian walkway bridge alongside NC 158 existing bridge to provide a walkway for pedestrians. The Proposed width of 10' is such, so emereency vehicles could use this route if deemed necessary durine periods of heavy traffic. The new wooden, steel reinforced bridge will be placed on existing piles and newly driven piles as depicted in the included drawines. These piles will be driven with a vibratory hammer. Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract The area is approximately 114' x 13' including the existing pilings. b. Size of individual lot(s) N/A c. Approximate elevation of tract above MHW or NWL 10' d. Soil type(s) and texture(s) of tract FrD (Fripp Fine Sand) e. Vegetation on tract various roadside grasses such as panic crass. fescue. beggar tick, and red clover . f. Man-made features now on tract NC 158 bridge and existing bulkhead along Jean Guite Creek. g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed X Community Rural Other h. How is the tract zoned by local government? Developed i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes 'X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? _ Yes X No 1. Are there wetlands on the site? _ Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, if available) in. Describe existing wastewater treatment facilities. none n. Describe. location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface runoff from US 158 o. Describe existing drinking water supply source. N/A 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) numbers, landmarks, and the like. •A Stormwater Certification, if one is necessary. •A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners Form DCM-MP-1 have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Boddie - Noell Enterprises, Inc. Address P. O. Box 229 Kitty Hawk, NC 27909 Phone Name Hill Creek, LLC Address P. O. Box 386 Elizabeth City. NC 27909 Phone Name R.O Givens Sr. Estate Address P.O. Box 9 Phone Elizabeth City, NC 27907 Name KHG INC. Address P.O. Box 1374 Phone Kitty Hawk, NC 27949 • A list. of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of AcJ,2003. Print Name tnI&M Jf/ 'S Signature a///A Landow orAuthmized Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information X DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other j. Will the proposed bridge affect existing water flow? sections of the Joint Application that relate to this Yes X No proposed project. If yes, explain 1. BRIDGES a. Public X Private b. Type of bridge (construction material) steel, wood c. Water body to be crossed by bridge Jean Guite Creek d. Water depth at the proposed crossing at MLW or NWL 5'- S' e. Will proposed bridge replace an existing bridge? Yes X No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) k. Navigation clearance underneath proposed bridge 6' 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No If yes, explain in. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. 2. CULVERTS N/A a. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No g. Length of proposed bridge 113'-11" h. Width of proposed bridge 10' i. Height of proposed bridge above wetlands N/A If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance bridge underneath existing Revised 03/95 Form DCM-MP-5 (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If Yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: NO _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? Yes X No If yes, (1) Length of area to be excavated _ (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: N/A (1) Location of the spoil disposal area (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes _ No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No If yes, (1) Length of area to be filled 4.6 feet (2) Width of area to be filled 3.0 feet (3) Purpose of fill 4 H Piles to be driven for support of the bents in the middle of the bridge f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed withinmone _ Coastal Wetlands - SAVs Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Revised 03/95 Form DCM-MP-5 g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 100 feet (2) Width of area to be filled 50 feet (3) Purpose of fill bridge walkway tie end to wdlg6 av path 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Using NCDOT Best Management Practices guidelines. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? excavator, vile hammer, boom truck g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No Clay Willis, Environmental Officer Applicant or Project Name Signature j ?/a/ 03 Date Revised 03/95 U S n 4^ 5 ? r i P ? 5 ti N r<^ P O `Q ilf \ ? Q l0 I vo (A ci D b t ? crf J F.i . r ?V C (? 3 s? f F cJ\ U Gp C-0 ib ?j. m x. 5 r .le s 5 ? ^ c l z f? c C LA LP s i r ? c? r {,! I a , r u U ' / \ r ?f P i lTU 4 e _ ? 1 i ? ? G "p /Greek a,55 S,n:\ 7 04 r O 14 z o R \ Z ! n- cZ ? ? --{ b o s d i ? Cf O Q r m o z fa o fi ?-r 4 !?f? o iy, P I c? s I4 ?CP C t^ S X- jS ?F li 2 nJ li n n N N m n O Z v v 6 rn n O z ?rn t. L. v is l:.> b b ? u 1 1 t. • _ b h / v y C _ h ? i ` I_? m U ,lJ LII V ---------- - l a1 rh ? k to \ an ~ I? f? 2 a N r ? b ` s t C/ } I 1 t lire V ? I b l.Y T co I: a 6_:'-__ f" _Jh 0 ? I • = ? U_ a / /? t l l [ O O 22 bull O C: a ;? ? W rn ? ? ?5 Gel r L D N n L _.. ? ? ? T>- ?n? ? O m V ~ n a c \? & bi ® ON P /? Q _ fv 4ii ? S? 4? O r'a rU J i m r; ? gj G Q rr ? a, ' a 1v _- IDD * Q i.l y i