Loading...
HomeMy WebLinkAboutNCS000572_Email Site Inspection Request_20200908Gwinn, Matt From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Tuesday, September 8, 2020 12:22 PM To: Gwinn, Matt Cc: Lentz, Zachary; Pearson, Tyler B Subject: RE: [External] RE: Dan River Minor Mod External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello Matt, The site can accommodate a stormwater audit. Thanks, Joyce From: Gwinn, Matt <matt.gwinn@ncdenr.gov> Sent: Tuesday, September 8, 2020 11:36 AM To: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Cc: Lentz, Zachary <zac.lentz@ncdenr.gov>; Pearson, Tyler B <tyler.pearson@ncdenr.gov> Subject: [EXTERNAL] RE: [External] RE: Dan River Minor Mod Hi Joyce, I just spoke with Tyler Pearson, and Zach Lentz at our Winston-Salem Regional Office. While they're at the site it would be beneficial for them to go ahead and do a full inspection which would serve as the inspection for the permit minor modification, and upcoming permit renewal. Since a full inspection would take more time, I wanted to check with you to see if you or the representative that will be accompanying them around the site tomorrow would have time to let them conduct the full inspection? Thank you, Matt From: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent: Wednesday, September 2, 2020 4:40 PM To: Gwinn, Matt <matt.gwinn@ncdenr.gov> Subject: [External] RE: Dan River Minor Mod External email. Do not click links or open atta less you verify. Sew spicious email as an attachment to ort.s am nc. ov Matt, I have attached an electronic copy of the renewal update submitted in August. The hardcopy was received 8/6/20 in the mail service center. Thank you for forwarding the draft minor modification. I will respond with any comments this week. Tyler Pearson is scheduled to visit the site on 9/9/20. Regards, Joyce Dishmon Permitting and Compliance, Carolinas Office: 336-623-0238 Cell: 336-394-5524 Email: joyce.dishmon@duke-enery.com From: Gwinn, Matt <matt.gwinn@ncdenr.gov> Sent: Wednesday, September 2, 2020 2:31 PM To: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: [EXTERNAL] Dan River Minor Mod Hi Joyce, I hope you're doing well. I apologize for the confusion, the inspection Tyler requested is mainly for the permit minor modification. I think the Regional Office would like to go ahead and conduct a full inspection as the permit renewal for Dan River will be coming up soon. Our goal is to issue the permit minor modification prior to the expiration of your existing permit at the end of September. There is not a draft of the renewed permit yet, but I can provide you with a draft of the permit minor modification. The draft permit modification is still awaiting comments from the Regional Office. If you have any comments on the minor modification please let me know in time to incorporate them into the minor modification before it will need to be issued. Here is part of the draft approval letter which notes the changes made in the minor modification: This modification includes the following changes from your current permit: • Modifications to the permit in Part II on page on 9 of 18, to designate the sampling location for SW002; • Modifications to the permit in Part II on page 10 of 18, to include Outfall SWO02 in the analytical monitoring requirements listed in Table 5; • Modifications to the permit in Part II on page 10 of 18 to designate the sampling location for SW010; • Modifications to the permit in Part II on pages 6-10 of 18 to update verbiage that referred to construction/demolition activities that have now been completed; and • Revisions to the permit cover page to reflect the latest amendment date. On the topic of the permit renewal. I had requested some information for the permit renewal including a summary of monitoring data, and I wanted to check on the status of that information. In our earlier emails on August 18t" you had said you would provide the information by Thursday of that week. I just wanted to make sure you hadn't already sent it and that it was lost somewhere along the way. Matt Gwinn Stormwater Program Environmental Technician II Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-3648 Email: matt,gwinna-ncdenr.gov Web site: deg.nc.gov/SW Physical Address: 512 North Salisbury Street, Office 640L, Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center, Raleigh, NC 27699-1612 D, E n'QN.in.o-M PI �,nwon nFpn jnl {k�, hey Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of staff and the public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. We appreciate your patience as we continue to serve the public during this challenging time.