October 30, 2002
Mr. John Thomas
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
6508 Falls of Neuse Road, Suite 120
Raleigh, NC 27615
r? - ---
401
Subject: Nationwide Permit #14
SR 1715 (Arlie Myers Road)
Wilkes County, North Carolina
Project Number: 6.762541 (DWQ Permit Fee: $200)
Dear Mr. Thomas:
The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1715 in
Wilkes County. The roadway width will be increased from 18' to 20'. Total project length is
approximately 0.5 miles. Impervious surface area will increase by 0.13 acres or 4%. Please note
that due to right-of-way limitations, the road will remain unchanged from stations 0+00 - 11+00.
This project will require the replacement of one (1) wet cross line as shown below:
1) Replace existing 40'x 36" CMP at station 11+34 with a 65'x 36" CMP.
Miscellaneous rip-rap impacts will total 20 linear ft. or less. New stream impacts = 45 linear feet.
In order to address the potential head cutting issue, we are proposing to bury the outlet of the
wet pipe at station]] +34 twenty percent. The inlet will be placed at grade.
Construction of this project will require impacts to waters of the United States in the Yadkin
River Basin. The above noted wet cross line carries an unnamed tributary to Bee Tree Branch
(Class: Q. The Division 11 Environmental Officer reviewed this project for the presence of
threatened and endangered species on October 25, 2002. This project will have no effect on any
federally listed endangered plant or animal species. Historic compliance work will be scheduled
and concurrence with the State Historic Preservation Office will be obtained if required.
The project impacts are minor in nature and should not remove or degrade existing water quality
uses. The replacement pipe size is the minimum necessary to create a safe roadway. By utilizing
P. O. Box 250, N. WILKESBORO, NC 28659
PHONE (336) 667-9111 FAx (336) 667-4549
i? ly-
Mr. John Thomas
SR 1715, Arlie Myers Road, Wilkes
Page 2
October 30, 2002
the erosion control measures outlined in the attachments to this application, downstream water
quality standards will be protected. All appropriate BMPs will be used during construction.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, a marked topography map and photographs.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia
Van Der Wiele, NCDENR, Division of Water Quality, 401/Wetlands Unit, for her review. It is
requested that any comments related to the 401 certification be forwarded directly to me with a
copy sent to the US Army Corps of Engineers.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincerely,
7
Heath Slaughter
Division Environmental Officer
Enclosures
cc: John Thomas, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
Cynthia Van Der Wiele, Division of Water Quality (7 copies)
R. C. McCann, PE, Division Engineer
Doug Tetzlaff, District Engineer
Brian Hamby, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No. 021778
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW #14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslau hg ter@dot.state.nc.us
2. Agent Information. (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Heath Slaughter. Division Environmental Officer
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
ter@dot.state.nc.us
E-mail Address: hslaughter@dot.state.ne.us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the fiill-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1715, Arlie Myers Road
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Wilkes Nearest Town: Mulberry
Subdivision name (include. phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From Hwy. 18 in Mulberry, take
SR 1717 to the northeast Turn left onto SR 1703. Turn Right onto SR 1715 @ station 0+00.
5. Site coordinates, if available (UTM or Lat/Long):
Station 11+34 DD: 36.2716 N 81.1540 W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Residential/Farm
7. Property size (acres): Approximately 3 i acres.
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Bee Tree Branch (Class: C).
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: Grade drain base and pave SR 1715.
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
grader and dump trucks
12. Describe the land use in the vicinity of this project: Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 5 of 12
1. Wetland Impacts
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no) Distance to
Nearest Stream
feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://N,,1N1v.fema.gov.
** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average
Width of
Stream Before
Impact Perennial or
Intermittent?
(please specify)
Station No. 11+34 Pipe replacement 25 feet UT to Bee Tree Branch 3 feet Perennial
Station No. 11+34 Miscellaneous
rip-rap
placement for
stabilization
20 feet or
less
UT to Bee Tree Branch
3 feet
Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
NXAvXv.usRs.sov. Several Internet sites also allow direct download and printing of USGS maps (e.g., «ANNv.topozone.com,
Nww.makquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 45 In. ft. of new permanent impacts.
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
acres
Name Wat)
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not lim itea to: nti, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., darn/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to
streams in the area will be minimized Since this is an existing roadway, the stream impacts
cannot be avoided However, the replacement pipe length will be the minimum needed to safely
construct the paved roadway. All appropriate BMPs will be used during construction.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetiands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http:/Ai2o.enr.state.nc.us/ivrp/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Page 9 of 12
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Lone z extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss Stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will increase by Uproximately 0.13 acres or 4%. All appropriate best
management practices for sediment and erosion control will be implemented during construction.
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature0 Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers )Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Aiieghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onsiow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Fax: (910) 251-4025 Cumberland New Hanover Scotland
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
1 - \I
3 ,>ta t+w
• 4 1
r \ ?_\
1 '•i.
'•\ '.\ \ to
8 \
_ t,as
\ d
w
rP a ?" ? \ \ / _ t
ero o ,
i J u
/'t1r?J?rrr
i 1ot
_ t»
1.
? b,a IWO
•
I, 1
I ?
wry \ `? ` i J ??
Tma .cam
Map center is 36.27160N, 81.1540°W - }MC GRADY quad (Quad Infol
• -- ti c. <? 4'r-. •11 1 ? i l? •-\ti?
L„'' 33II ?? A A
B?!``??"? -„•? ?'? ? ti???*. G ?'? - ? D? irk ? 1?? ?i _?t? ???' is-`.!
?:'-'?n r) . t :R i r ` '7 ;? ? ... "` l? '/f 1.? f?? f '"_? I v ! ?l G^•. f'```? ?'""""'? ?rr--Y ?.L'?\l ?"r -\
"tt •ti i``f `f!' i it - -: ? t ? .. r r t.??f'+ ?'__.
T
•-' f? f%f.i . `'")l ?' + j 1? J-.,_ ?. ' '?1 ? '??? j?ri t? -•ty?. ? *-? ?F S
lI p 1 1 r 1 s C `} ?r J _ti tt C_ ??
r! ri / J
-VN
F
u
v.
rr ;
't l t11r 4 7 ?\.
n .? r
•2 1!i i 4
i
!`.6
?CC f:
JA ''
7 t;°-', ', ?f - r ? 27 •? ; t ? +?jl? ¢ ?' J' I ?' r 1 ! ? l . ?`,t ?.,
ti I ` 4 t
?.J 13 / `? _ ? t •.,,? ?t'•+' 1
1 `!
J ? + • f
'.??,dr•l`rrii4y. }?• - - t' 1{ ?',•?{f -'? ?yta 4
-? O } t2tW
F 17 J.
- - ? if
?? ?"'? l r? jir, L_. • j ,? ' ?, l t. ?\ ?;? `?. • '`? ._ - > > ^, w= .'1 ? ?.I'? .?.?/ `?" -S4 ~:
J- _.j .400 X
C TA
.01
f ??'., ` s j _ j ?4 ? ? t !4 r a.? Q II ?- ? { ! e j.?' f/ fJ?A .`A1a9t?(S?ii•?w'1!
101?{= ? ?!?? ,.,,`?'.`..-,r,-«.-.-/Z ? x :fir<?,? .r f : °r: y? ? .T r.• t ? 1? 332? { ? ? ? ' j?, ? s , i `L/' •:
N`6 1104
' /'t 't ? ?`?•':,t • `•? 1 (? , 4441 r . ,-,•'?1 t` • 1 ., 1 .i Ji'`_ _ _ .
%
4 i ? ? ! 31 f t r''
0 500 1000 1500 2000
meters I I t 1
miles 0 0.5 110 !
1pozone.com?? r
http://www.topozone.comlprint.asp?z=17&n=4013881 &e=486171 &s=25&symshow=n&u=1 10/25/02
J -;,; r .
EROSION CONTROL SCHEDULE
(1) All adequate temporary erosion control measures will be installed before
clearing and grubbing operations begin.
(2) As construction progresses, temporary and permanent erosion control
devices shall be installed in a timely matter, according to any special permit
requirements and or requirements set out in G. S. 113A-57.
MANDATORY STANDARDS FOR LARD-DISTURBING ACTIVITY
Pursuant to G.S.113A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be accomplished within 15
working days -or 30 calendar days following completion of
construction or development, whichever period is shorter, except
as provided in 15A NCAC 413.0024 (e).
DESIGN STANDARDS IN SENSITIVE WATERSHEDS
Pursuantto G. S. 113A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be provided for any portion of -a
land-disturbing activity in a HQW zone within 15 working days or 30
calendar days following completion of construction or
development, whichever period is shorter.
(3) All siltation and erosion control devices shall be properly maintained until no
longer needed.
(4) On projects performed by D.O.T. Maintenance Forces; request will promptly
be made to the Division Roadside Environmental Unit for stage and
permanent seeding.
(5) Any removal of siltation devices will be based on the condition of established
ground cover of that area the device is serving.
CONSTRUCTION SEQUENCE FOR INSTALLING ROADWAY CULVERTS
I - Clear only enough area and install the downstream measures such as silt check dams,
sift screens, and basins as noted on plans.
2 - Excavate the 2' base tail ditch.
3 - Excavate and install the roadway culvert.
4 - Install sediment control measures at inlet as noted on plans.
5 -install additional pipe outlet protection and inlet protection as noted.
D ETI-TSN
SP.-ECTFIC-AZ? TONS
CL - D esc-ir) rion S-v?o1
Temporary Slit r=ence
i emporary Silo Ditch' TSD
1 GS
?.?j j emporary Diversion •7 D
A/
..
-
J emporary Slope D min
?
Silt B2sIn iype-A
Slli Basin Type-B
- 'B33:Q 1- 'i eMj DOTZ y Rock Silt- Che&,, :i yY A
I B3v.1D _ Temporary Rock Slit Check •i ype-13 _
-emDOrary Rock Sediment Dam t ype--A - ?- = _
= ???3? D2' Temporary Rock `S?dirriani Dares type-- _.
n
? Inle Se iI ent TT3D- lyp
ROCS fI
}
_
Mock Pipe Inle--SeQinent_.i.r m 3-'1 -
50-
Roc?• S11L.Screen -
?. . p
-
.
- _ -? 0 04- --
_
:..-S-tiq nci Basin _ _ .
_
_ Rock Inlet Sediment i rap: - -
3323I
I vow-',
J NIA
n ?1 1a'' O - r?-?.
332 2 --
Yp= iFIS-- OR --
:,3233 i ype-C C 3i r-- OR -- C
OL.
? c sz s ! t O % 1 rLrL lTL f LrLrL
1 1 3 D ! t c D - i l 1 c _ rJ D a _ _ C j C :7 - . . - - - - - - - _ _ -
r F, nisi lc_i - _e?7 Lips=?. icy •?
: e t ?
SECTIO 1042
RIP RAP AI TATERIALS
1042-1 PLAINT I'II' HAP.
SLOne for t)lain rid) I L1OShal] consist Df field stone or 1'oul-1 unhet.;=n quarry
SLcme. T11t stone shall be souncl, tough, dense, resistani to the action of air
and water, and suitable in all other respects for the Du.I-DOSe iniended_
??'llel-e broken concrete From demolished siruci.ures or I)avemnt is.av2_11-
ahle iimay be used ill OlLIce Df sione provided -']'!It such use meets -v,-All i:he
;TI)roval of Ibe Englnecr.. BONVever, ille use of brokeIl concrete Which
cmiains reinforcing sieel will not he -oermiAtecl_
TI)e stone or broken CDncreip shall toe graded Lo meet- ille fD7lowi?,[.r
requirements:
eigll i fl-Dm.? to 200 pounds.
3: For-Class 3 Rip Raj)_.Siflnesllall va:'v in-iv
- i least 30. )e?;ceni .of the: e1gr11f of i13-e rip raD :silzIl. Vie. in ,
-:. inda>?idtiyl nieces gllinga: inimmum of .1i0 pounds 6acll_ Not more
- i1a11 20 ?)erceli of ille iDil ??1?11i of ille rip rah) ma?bein 1nc3ividual
Metes weighing less than 15 pounds each_
2Dr Class 29 T t-1) RaiStDIIe shall Vary in weIillL Tom 25 t-0 -950
Dounds_ Ail leasi.00 percent Df the i.o_al wnl?nt of iher5D rap shall be 111
1ndivlc311 1)ieceS AVeI 111In? a Smii23 nun.i of 200 -Dounas each- NIOtIDDre
than 5 percent of il)c ioial z' eight of the rip ran maybe ill 1T1d1vldual
S £aci?_
Dieces wei ETlll n? less Than 50 ?)Du n C2
.tj?l
LUGH QUALITY WATERS
1. Uncovered areas are limited-at any given time to a maximum total area of
20 acres. '
2. Erosion and sedimentation control measures shall be designed to provide
protection from the 25-year storm.
3. Large Type-A basins shall be designed and constructed with a settling
efficiency of at least 70% for the 40 micron soil particle size transported
by runoff from the 2-year storm.
4. Newly constructed channels shall be constructed with side slopes no
steeper than 2:1, unless slopes are to be stabilized by methods other than
vegetation
5. A ground cover sufficient to restrain erosion must be provided for any
disturbed area.
EROSION COMROZ PLANT
;y3y
SR s
CDUNTY
FZ' R =?- ND ?'?x3Y
cis,-4 v
30'x 18`CJF ?r
L ffJJ?fJ
9 x3x
%O ?-LA
sal` r LD=
>.3 xz-
I
)Rx3x z -?
, x3xt
S7A•, I ??- AaCA
T
SCALE T= lOD'
O
T
`z I -4 - -ate p l c ?
.- `I x3xz - - - .
13s
3 S, x 10" . C50- P1a:,,
?x3xz C I5?' Ex+?
Ax3xZ
Cl x3 x7-
-? ?-? 5? . 1 \ k 3 4
EROSION COOL PI-4XT
SR r-7 [ S
DDJNTY W_ALc_)
-DE NAM= ?ej
W D? K DRD=R VD- CP
kid -
es(?-P+ a ;.?
- -- 9x3
- Q k3
S=? Z1•i-?S-.Add ? L
?gx3a
35' x t5'' CSP- P ?a'?
gx3.
4o' x is- cs,°
0,; K3
w
t'
?)x3 a 2
- ? 5 x?xz
v
? 9K3xz
SCALIE: T= !DD'
? J [ STFt, Zct-rl0-ter lc.c?
- ??pQ x3u` 3v' X 15'' Gsn-t?ia.
J
q X3 r.z
".? Cix3xZ. - .
L.z 01 X3 x2
' Cl k3 xi
_ 9 y xz
c1x3xZ
?r
Zo+a s-Add ^y
Z 04- A6, d
0 ?-
- ®q ?c3xZ 30' 7. 1 ?" CJP- ?t.h...
7
, .EROSIO.XT CO?DL PL43V
5? 1115
MUNTY
WD?K D?DER 'ND-
4
A
. ?I9x?z
? x3?cZ
ti
s?= d -3D--,L_4
0 plpp- I STAi10N I S CLASS I REMARKS
-3f -,fig
c I , I -,- z-
?
? I i ??-? ? I ?s ? X ? ? ?! I pig;,, I ?
?2,: ?.?
o I (?-?- q s I 7o, X! s,, pi, C-
0 ?' I co v i e 0, X I .. I r-4" d- ::?
""7 l0, - p
v I io l o' rS'f plo.'? I ?' ,-4 - rQ
0 { - g, 1 ?4 v' x f Imo,., . P J
0 1 2 Pla.
0 A& I C) -3 o x /fin'
0 { Zs-t-Sv v x I S", la", I Adw - eS
0 I -}- i s' x 1:5 If I L. I ?- CY17
0 f ?? -?-oS l ? v ' x 5,' ln, -, 1 -4-6,1-
o cy 13 ? x /S
`? I, la'.l C la l- GJp
0 STLJC7 Q
O' X8,1 P-
0
0 I 1
0 I I
o I 1
i I I I I
0 i 1 {
v I 1
0
10 I I i
to
0 1 I I i
0 I I I i
0 1
0
10
10
0
10 I I I i
0
0
0
0
4
Ditchliner Requirements
SR 1795 Wilkes County
1+10 +10
5+00 7+90
12+50 30-..00
27+40 30+00
31+00 32100
30+95 38+00
37+20 38+00
8/13/02
LT. - ROVING
LT. - RIP RAP
R RIP RAP
LT. ROVING
?T. ROVING
c ..
LT. -.. ..-: ^a
ROVING
RT. ROVING
fS.R. I County-\d- r L1?, ?? Sheet Of
1
Nam 4? P-1 L = u S rz aA Date
Existing Road
New Road
Proposed RIPS' _ \ :- _ - - - _
,
- i I 11k34
Existing Pipe
L------j
New Pipe
Center Line xzsT ?j p = 4 0 ` x 3c? "
I ?-
rALr--
i! I 1!, I I I I l i I 1 I'' I' I I I I! -_-_
i T.L.-_' I I ' t 1 i? I_-.I•-i-! ' a - 1 _ i I I I I ..
" I l i l i i l l! i ' t 1 °; ' V'i I l i l t j ? 1 1 ? ?-
' I j ! I I - I I I ' I 1! I I 1 1 1:
l ' ' ?
' I
I I I l i
? I 1 I 1 1 1 I
1 I
? I
I i t 1 1 I
! -
--
i I 1' I ?7
-
I t i I 1 1
_
'
i 1 I I
i 11 I I I -
-
- __ 11 I
I i
I
_
--: - -
T- = - - -- - - -----=-r- - ---- ; - - -? --
I
,
?vote:
Temporary erosion control
devices not shown, but will
include temporary silt screen,
rock check dams and silt
basins, as needed.
Su--,cy Date o°- 2- Loa2
Conducted By F-W ; DB, $.O, OP
Drawn By La
i
T
l •.
l 1
I
1
I
i i
IJ
G,
{ `
II ? I G?_
1I? ' 4? r
1 i { r
`rte ?
rl
I
/27
IN
1•
t r I'
I?
Cb
Ov
C?
O
o'
_ C
I`
c ?c
(•io
i-
1- 4-
Q
bF
1•-
i
17
I
J ^i
i
?Dw . I QG vvmiam u. Koss jr., secretary
North Carolina Department of Environment and Natural Resources
co r Alan W. Klimek, P.E. Director
> Division of Water Quality
o ?
DWQ Project No.: C> Z 1,7 88 County: - INr t. 1485
Applicant: CDoY
Project Name: ` '6P- 1`715 ' - ArE Y W- 0;
Date of Issuance of 401 Water Quality Certification: It f 7 f o I
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, DAy)A WAyive' , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Agent's Certification
I, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature Registration No. Date
NMEFtft
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetiands/
XNaT ??QG
t7 `C
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
November 7, 2002
Wilkes County
DWQ Project No. 021788
SR 1715 (Arlie Myers Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. Heath Slaughter, Division Environmental Officer
NCDOT Division 11
P.O. Box 250
North Wilkesboro, NC 28659
Dear Mr. Slaughter:
You have our approval, in accordance with the attached conditions and those listed below, to impact 45
linear feet of an unnamed tributary to Bee Tree Branch in order to improve SR 1715 (Arlie Myers Road)
in Wilkes County. The project must be constructed in accordance with your application dated October
30, 2002 (received November 6, 2002). After reviewing this application, we have decided that these
impacts will be covered by General Water Quality Certification No. 3375, corresponding to the U.S.
Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any other
federal, state or local permits before you proceed with your project including (but not limited to)
Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval
will expire with the accompanying 404 permit unless otherwise specified in the Water Quality
Certification.
This approval is valid solely for the purpose and design described in your application (unless modified
below). Should your project change, you must notify the DWQ in writing and submit a new application.
If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is
thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this
approval to be valid, you must follow the conditions listed in the attached certification and any additional
conditions listed below.
1. Storm water shall be directed to buffer areas or retention basins and must not be routed directly into
streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized
for storm water sheet flow.
2. The pipe required for this project shall be installed in such a manner that the original stream profile is
not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed).
Existing stream dimensions (including the pattern and profile) are to be maintained above and below
locations of the culvert. The culvert shall be designed and installed to allow for fish and other
wildlife movement as well as prevent headcutting of the streams. Riparian vegetation must be
reestablished within the construction limits of the project by the end of the growing season following
completion of construction.
3. NCDOT is encouraged to use existing on-site vegetation and materials for stream bank stabilization
and to minimize the use of rip rap.
4. Heavy equipment must be operated from the banks rather than in the stream channel in order to
minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
NOFN-R
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetlands/
5. All mechanized equipment operated near surface waters must be regularly inspected and maintained
to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic
materials.
6. Upon completion of the project, the NCDOT or its authorized agent shall complete and return the
enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401
Certification has been completed. Please include photographs of the completed construction
upstream and downstream of the culvert site to document correct installation.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Ms.
Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600.
Attachment
cc: Wilmington District Corps of Engineers
Jean Manuele, USACE Raleigh Field Office
NCDWQ Winston-Salem Regional Office
Central Files
File. Copy
FILE COPY
TO: John Thomas, USACOE
Raleigh Regulatory Field Office
FROM: Ron Linville, Regional Coordinator
Habitat Conservation Program
DATE: November 4, 2002
SUBJECT: North Carolina Department of Transportation (NCDOT), SR1715, Arlie
Myers Road, Unnamed Tributary Bee Tree Branch, Wilkes County
NCDOT proposes to replace an existing pipe during grading, and paving the referenced
road. Biologists with the North Carolina Wildlife Resources Commission are familiar
with habitat values in the area. These comments are provided in accordance with the
provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16
U.S.C. 661-667d) and the North Carolina Environmental Policy Act (G.S. 113A-1
through 113A-10; NCAC 25).
The project NCDOT proposes to replace an existing 40' x 36" CMP at station 11+34 with
a 65' x 36" CUT. Miscellaneous riprap impacts will be 20 linear feet. Total new
impacts will be 45 linear feet.
We will not object to the project provided the following conditions are implemented:
1. Culverts 48" or larger should be buried approximately l' into the streambed.
Culverts less than 48 inches in diameter should be buried to a depth equal to
or greater than 20% their size to allow for aquatic life passage. These
measurements must be based on natural thalweg depths. All waters must
flow through without freefalling or damming on either end during low flow
conditions to maintain aquatic life and/or fish passage. Any riprap used must
not interfere with aquatic life movement during low flows. Due to site
restrictions NCDOT will place the inlet end of the pipe on grade to reduce
head cutting.
2. The dimension, pattern, and profile of the stream above and below the base
flow barrel should not be modified by widening the stream channel or
SR 1715, Arlie Myers Road 2 November 4, 2002
reducing the depth of the stream. Previously disturbed floodplains and
streams should be restored to natural geomorphic conditions whenever
practicable.
3. If concrete will be used, work must be accomplished so that wet concrete does
not contact stream water. This will lessen the chance of altering the stream's
water chemistry and causing„a fish kill.
4. Heavy equipment should be operated from the bank rather than in the stream
channel in order to minimize sedimentation and reduce the likelihood of
introducing other pollutants into the stream.
5:w ?Strin%em erosion control measures should be installed where soil is disturbed
and maintained until project completion.
6. Temporary or permanent herbaceous vegetation should be planted on all bare
soil within 15 days of ground disturbing activities to provide long-term
erosion control. We encourage NCDOT to utilize onsite vegetation and
materials for streambank stabilization when practicable.
Thank you for the opportunity to review and comment on this project during the early
planning stages. If you have any questions regarding these comments, please contact me
at 336/769-9453.
Cc: Cynthia Van Der Wiele, DDWQ
Heath Slaughter, DOT
Marella Buncick, USFWS
Becky Fox, EPA
Subject:
Date: Mon, 4 Nov 2002 17:35:14 -0500
From: "Ron Linville" <linvillejr@earthlink.net>
Organization: NCWRC
To: "401 Cynthia Van Der Wiele" <cynthia.vanderwiele@ncmail.net>,
"DOT Heath Slaughter" <hlaaughter@dot.state.nc.us>,
"USFWS Marella Buncick" <marella_buncick@fws.gov>,
"Becky Fox @ AOL" <foxbecky @ aol.com>
FYI, inlet end will be placed on grade instead of 20% per DOT request. Pipe on upper end should be placed close to
existing pipe elevation if possible.
IM
Name: SR1715, Arlie Myers Rd, ut
Bee Tree Branch.doc
Type: Microsoft Word Document
(application/msword)
Encoding: base64
Download Status: Not downloaded with message
1 of 1 11/7/02 11:59 AN
Y
N d fa?a
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT
GOVERNOR PHONE: 919-733-2520 SECRETARY
October 30, 2002
Mr. John Thomas Y
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office FILE COPY
6508 Falls of Neuse Road, Suite 120
Raleigh, NC 27615
Subject: Nationwide Permit #14
NOV 2002
SR 1715 (Arlie Myers Road)
Wilkes County, North Carolina
Project Number: 6.762541 (DWQ Permit Fee: $200)
Dear Mr. Thomas:
The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1715 in
Wilkes County. The roadway width will be increased from •18' to 20'. Total project length is
approximately 0.5 miles. Impervious surface area will increase by 0.13 acres or 4%. Please note
that due to right-of-way limitations, the road will remain unchanged from stations 0+00 - 11+00.
This project will require the replacement of one (1) wet cross line as shown below:
1) Replace existing 40'x 36" CMP at station 11+34 with a 65'x 36" CMP.
Miscellaneous rip-rap impacts will total 20 linear ft. or less. New stream impacts = 45 linear feet.
In order to address the potential head cutting issue, we are proposing to bury the outlet of the
wet pipe at station 11 +34 twenty percent. The inlet will be placed at grade.
Construction of this project will require impacts to waters of the United States in the Yadkin
River Basin. The above noted wet cross line carries an unnamed tributary to Bee Tree Branch
(Class: Q. The Division 11 Environmental Officer reviewed this project for the presence of
threatened and endangered species on October 25, 2002. This project will have no effect on any
federally listed endangered plant or animal species. Historic compliance work will be scheduled
and concurrence with the State Historic Preservation Office will be obtained if required.
The project impacts are minor in nature and should not remove or degrade existing water quality
uses. The replacement pipe size is the minimum necessary to create a safe roadway. By utilizing
P. O. Box 250, N. WILKESBORO, NC 28659
PHONE (336) 667-9111 FAx (336) 667-4549
rt
' t` )LLJ
Mr. John Thomas
SR 1715, Arlie Myers Road, Wilkes
Page 2
October 30, 2002
the erosion control measures outlined in the attachments to this application, downstream water
quality standards will be protected. All appropriate BMPs will be used during construction.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, a marked topography map and photographs.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia
Van Der Wiele, NCDENR, Division of Water Quality, 401/Wetlands Unit, for her review. It is
requested that any comments related to the 401 certification be forwarded directly to me with a
copy sent to the US Army Corps of Engineers.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincerely,
7G?
Heath Slaughter
Division Environmental Officer
Enclosures
cc: John Thomas, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
Cynthia Van Der Wiele, Division of Water Quality (7 copies)
R. C. McCann, PE, Division Engineer
Doug Tetzlaff, District Engineer
Brian Hamby, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW #14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslaughter@.dot.state.ne.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Heath Slaughter. Division Environmental Officer
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslaughter@dot.state.nc.us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1715, Arlie Myers Road
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Wilkes Nearest Town: Mulberry
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From HwX. 18 in Mulberry, take
SR 1717 to the northeast. Turn left onto SR 1703. Turn Right onto SR 1715 @ station 0+00.
5. Site coordinates, if available (UTM or Lat/Long):
Station 11+34 DD: 36.2716 N 81.1540 W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Residential/Farm
7. Property size (acres): Approximately 3.1 acres.
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Bee Tree Branch (Class: C).
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/naps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: Grade drain base and pave SR 17154
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
grader and dump trucks
12. Describe the land use in the vicinity of this project: Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 5 of 12
1. Wetland Impacts
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://w-\Ntiv.fenia.2ov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average
Width of
Stream Before Impact Perennial or
Intermittent?
(please specify)
Station No. 11+34 Pipe replacement 25 feet UT to Bee Free Branch 3 feet Perennial
Station No. 11+34 Miscellaneous
rip-rap
placement for
stabilization
20 feet or
less
UT to Bee Tree Branch
3 feet
Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
w\?Av.usgs.Qov. Several Internet sites also allow direct download and printing of USGS maps (e.g., xNiv%v.topozonc.com,
,,-iivw.mapguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 45 In. ft. of new permanent impacts.
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
acres
le)
Name Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to
streams in the area will be minimized. Since this is an existing roadway, the stream impacts
cannot be avoided However, the replacement pipe length will be the minimum needed to safely
construct the paved roadway. All appropriate BMPs will be used during construction.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o enr.state.nc us/ncwetlands/strm-gide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http:/Ai2o.cm-.state.ne.us/NN-rp/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure, whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Page 9 of 12
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
s ware feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Gone Z extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will increase by approximately 0.13 acres or 4%. All appropriate best
management practices for sediment and erosion control will be implemented during, construction.
XII. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Agent's gignatureC/ Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Fax: (910) 251-4025 Cumberland New Hanover Scotland
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
I \ y
I V 1 > . . ieo
3 /
• J ?1
\ rl I ' !
y /J
\ i 1
1 w a7 1
Ill{ \ p Ilyl
\ ?^ .y 'me
I
R ? IM ? •? - 111]
16a I 1716 ?'•?.
t
'y\ •? 1701 `b ?\ d
0
lr*
Q to
'.? •.\ \ 1712
•,\ •,\ -tO •l0 g
1191 1711 ?Q
? ; ' 11v7
- ! q >c
\ b
? 1?
6>
1 1 ; r 1717 \ ••\ /:
J r o
116 ? I `
113J ?
1.' ?• elm '4j \??- 1'•\
lypl _
/? • ? ].mom '.\ /' \
(\` 161, 16co 1]? •\ / \
Map center is 36.27160N, 81.15401W - MCGRADY quad [Quad Infol
topozone.com
Copy ht@2000k1 salacarte.inc.J'
i/ .? . 4 l ? „t rf / ?,,.!?f( ti-1 +??? r ?? - ?_ .. ?•t.? \slt ? 1!+ i 1,-j''_'
ix ? ? ? 1-."a ,•, ?+ ?`_ -.? i .1 I• ! r? ?tf?,?- ?ti t?.•?-....? ? 1' ~/ _. f _.. t? f 'r . ? ?/f J f ` ? i'+? ?)°J !?-r ? :,°
(i] t 1r1j 1/I? ? r4 ?_14r?_!??? rr^, nil ?V L.? .? ? I (f(? i ( 1 /' 4 / it^^v??/???Y+)//j. Gr r
# ( ?\.1 .1 t r } I !` d t w? ?.,.__i•' l?Y r' ?..rl I ) ? _.K?}J •l. ? r?/•/ ? 1 .?//?) ?#Jf?j l? ??r/?f.-r yr • \Y?Y ?r ??
LL-t;`F `L^rJ? Sr V, :yf??vf_1
l.?-??f'/J??S,j \?'??.`+J'/f-`-~``fE•1 Y
? J ! ?;?' ; ? (j r ? ? ? ? .M? ?.`?',?J??({'•f('C4Y?. 3 `.fI ? ---? ??
'? r??r /Js ti _ {. \ ??? ?? ??? ? r '?t 'f i ??f-4$$?t1 r? ,tV f.-? s? ? r z+",'-,--' .-'r^?-^-.` ?.-.` f,?, ?-?Ci'?
i l fl Ti f Ir~ .J ?5. I
f' f t .J. -l 5;???,•,- '--_1 S+ `t ?•' ! }i?Jn '/'"'•i-\ ?^J . s l( r!f
lr i i•? _i 4 ?•` + ?J???[rr'r))r rt' f, S f JI 1T6?'f 1 '? f. I,,,
J f \ _. 1`v-. ?r 4 '•r J `? ?' `.'• t it f1 r li`f f'?? 1 *i \ r,•} ' r '?
?i ` ?.?!1??,?, rte/ `` , K-
/,.-_._. ?r; ,? - rr?, r ..-•_. i \,t? ?'.{. ? rr ..;. ? . .-` . ?. ?, r' ': (° r --- • Cy?+`r'-? - --' )?, ?? ?J jJ 1 ? ?, _
%
tr 'cif !,?'`.'` ?'1,14?1 i 1. •? -7 /`- t 115 1' S( 1 j 5I
'' '-. r, r G i ! } t N t ? { { r . '??! ? r f f• .f- /J ? j '`-.J?
? f
J. ?tiif.?J -?y?.11, ? -...•' ?- _.. ?-? ? ? 4 `-?? ? T ?? ?!; f ' `T.._? ? ?J n' Tjn? -
" . f . ?, \ y11 _ ?:"` ?? 1t ! .?' .758
t r ft ?I +~ - T ?` r f
t?? •,1 -.: i t { '• ' t.., `` l 1?' ? \' . )?
't% ! r.rt'. ?F '+r Cj...?_?... -f 5. ?1 '\ t 4-- , `" / I?? '?t1•?• t )? fit• F
i'
37
\\ r
f?! •..? P +? { 17 j l E.o i?ol?5 f3 I. ?` +r, > r t . .
l ? i .- r It ? ? ? ty°.t + S. r?? r y.- ? ?'? i. ?t ??' ??' ?•J 1 \_ ? J • y `' ? ?`
f' { ' ill . r ?? ,t~
f -*
P
?"-„ti ? 1' ?; ? `!' C ? / ';?; _? {/ ?( ?'4 r?••m-•_- '•\ _ ??? `- .!J ? _ ?, i `' TW''`O ? ..
.?•'_f? l r i r -.,t? it t+ ..!- t ! ?Ii• .' ,.`'"• ? J r'`? ?L} ?.
COM
- J . - r'Ir s { L.- - ?p ??? f?:•. ?"-? ?3} Iii ? ? •1 s?°j1 ? .i ? (, ? /' ? , •rf ?AY'i'?P¢l?vti-??1
i '` 'r'? 'T-??Q? ?:? 5 r 'S?c F i r? ? )rf' .:? S? t'•' / .) 3?yp--• ? ? E`} ?'' !f j . ;?,
VN?
11104 ?!`? '1` ?? ? f? ? ?_• ? ° f 1 ?`r ?;r' i ? k ? ,5..? -.:S ? ```, .'? I- f J + *M1_ J J
r ` iJ? * f //t It + / ',
(/?,t'
r ? i* • - t ?,/? 4 .'I \ ,r?? a?1?i?3f 2 % '? ? ?lr ` ? ?V4 i ti1 •-. ''?._s .-+!_F_' -?"?'/.
- -.':. =`-` j t .-.\\.v 1,. ? .f / d +?S? +'-? !lfyy ?t! . I.% ?' . ?: ? , ? _ ?J ? .i •4;'a . j `;'`•--_ ? * . r`/t • ! i:•' l -
0 500 1000 1500 2000
meters i. .i - {. .i
miles o 0?5 i 0
http://www.topozone.com/print.asp?z=17&n=4013881 &e=486171 &s=25&symshow=n&u=1 10/25/02
EROSION CONTROL SCHEDULE
(1) All adequate temporary erosion control measures will be installed before
clearing and grubbing operations begin.
(2) As construction progresses, temporary and permanent erosion control
devices shall be installed in a timely matter, according to any special permit
requirements and or requirements set out in G. S. 113A-57.
MANDATORY STANDARDS FOR LAND-DISTURBING ACTIVITY
Pursuant to G.S.1 13A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be accomplished within 15
working days -or 30 calendar days following completion of
construction or development, whichever period is shorter, except
as provided in 15A NCAC 413.0024 (e).
DESIGN STANDARDS IN SENSITIVE WATERSHEDS
Pursuant to G. S.113A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be provided for any portion of -a
land-disturbing activity in a HQW zone within 15 working days or 30
calendar days following completion of construction or
development, whichever period is shorter.
(3) All siltation and erosion control devices shall be properly maintained until no
longer needed.
(4) On projects performed by D.O.T. Maintenance Forces; request will promptly
be made to the Division Roadside Environmental Unit for stage and
permanent seeding.
(5) Any removal of siltation devices will be based on the condition of established
ground cover of that area the device is serving.
CONSTRUCTION SEQUENCE FOR INSTALLING ROADWAY CULVERTS
1 - Clear only enough area and install the downstream measures such as sift check dams,
silt screens, and basins as noted on plans.
2 - Excavate the 2' base tail ditch.
3 - Excavate and install the roadway culvert
4 - install sediment control measures at inlet as noted on plans.
5-Install additional pipe outlet protection and iiilet protection as noted.
i IN
D ET jLS AND
SPECTFICAZt 1-0-1-
S _ DescD1ion Snbol
lbOj_G
I
ence
"'IL
-1 zmporary ?ii L r
i emporary Silt Di%c!i'
J &3.v-'73 j emDorary DIV=_rsion
1,6^2 01 Temporary Slope Drain
Silo Basin Iype-A _
3D_0 Silo Basin Type-B
- L33-01 1 2InDDTar Rock Ell Ch-&k7iy,,,e-.A
1 ?633_02 - . Tenpcrary Rock Slit Cneck ype-B
X34.01. : .temporary Bock Seai; nen darn 71 ype-A =
J -B
?"?mporary Rock sell meni Darn ype -
RDC? 'iDa-InletSedimeni lraD 1 'p_.'jk _
Rock P!r) ' -Inlet :Sediment l. -D j ype-B ...: -
-.? X30 dock Sum Screen
- _ -? ?0_04 S'?illingasir? - .
Bock Inlet Sedimen i rap:
I I32_J1 i yne-A
163202 j yp ? 3
I :23203 1 ype-C
A?, 3a-
v
1=-- OR -
C it F-- OR -- Cj
s2?.=D.--`-_ 1 ?`'_ _ c?rJ li0t%i^v iC .UZJLr111r1T1
0 7-3
SID-
Or
L?1+?lip fi. ?
J 4 +
T 7 Z t
-sue
SECTION 10 42
RIP PLAN MATERIALS
10-'?-I PLAN RIP RAP. -
Slone for plain riil raUshall Cons Isi oI fleld stone or rDug,'l unhe-t,=,Tn quarr v'
SLDne. rile stone shall be souncl, toutzh, dense, I'eslsLani to the action of air
and -water, and suitable in all oi.l]er respects for the ?,)UrpoCe intended_
Where broken concrete from demolished siI'uciures or i.)avement is avail-
-ible, itlnZay be used in pl.!ce Df stone provided il]at such use meets th the
approval of the Encr-Ineer.-However, the -US--- 01' broken
coni.alns r-e]nforcing steel 'will not lie permitted-
The stone or broken concrete shall be R-raded to meei ilie fo7Iowi-ng
rcgllIrements:
For-Class I Rip Rap_ Sloneslzall vary in weigh t from.-io 200 pounds:
i least :30. pe i,ceni of the iota-1 weight of he rid rap. shall be in
-: indii?i.dual nieces ? 1eigl]ing a 3nininium of -60 Pounds -6ach_ No-More
ha71 30 percen oY i11 e ioial V"le3ghi-oI ih-e r 1D rain niny bnsn individual
pie, tes -weighing less than 15 pounds ;each_
2. ' ter l SS l? 13 iL-p. Si one sJ1a11 vary in wei 11 L Iz'Din 25 i0 -950
Dounds. At' eusi 60 vei-ceni of the i.o.al Weigni of the riD rap s_ hall be in
individual 1)ieces Aveing a nimuln of 200 pounds each_ _N -moi-e
ihLn ptrcenf of the total w I I of the rip ran i]Zay be in In{31vIClllal
pleces weirrllinc-, le Ss than 50 pounds each-
HIGH QGALTTY NN7ATERS
1. Uncovered areas are limited-at any given time to a maximum total area of
20 acres.
2. Erosion and sedimentation control measures shall be designed to provide
protection from the 25-year storm.
3. Large Type-A basins shall be designed and constructed with a settling
efficiency of at least 70% for the 40 micron soil particle size transported
by runoff from the 2-year storm.
4. Newly constructed channels shall be constructed with side slopes no
steeper than 2:1, unless slopes are to be stabilized by methods other than
vegetation
5. A ground cover sufficient to restrain erosion must be provided for any
disturbed area.
.ROSIO-NT CO1 r I ^ OL Pf&v
SR )? ?S
CDUN i Y
L
? ?D-?, ? a Nn- ix3Y
W D? ,?, . D„ -
30'x i8'GSF
Plc...
9
SDAL-+--: -Y= IDD'
i
jofivc
(191,
O
T?
-r
?,,J xZ
Rx3x •Z
9 Y3xl-
S-•CA? ? ?- ??- AcFd
.. 15+ 8 S - -:?e ? 1? c
-3 C,
s ?.. 13 C s .. ecp ca«
35`xt8'?
esP- p1cz:
I - •
?x3xz ? {5?' •EY:?-?
ax3xZ
Cl X3x2
4
is C319 -T? 6
Ct x3xt
4- C3 to
• ROSION COAMROL Pl_4 xT
SR ) t ?x3x
LD: AL NlaM? ?cr 1',c t???', ?z 6'J J
WD?K DRDER ??D- P
?q x3 x
' Q X3
?r
25' X. Is" CJ?
f2
?
9K
9 k:
U,
a),3.2
Xg 3 xz
- •. - SZ c<; Zia- 55-A C?c? J
C5P- P to
cIA3zL
S ?a . Z3 Boa-.redd ??[
4o` x ,5•• cir-
?iw;n ?gX3xZ
DO L
5x2)
L
- v
SCA! E T= IDD'
07
., 3
\ ] t S ??• Zci X10-2cp lace
-
- ?/ ? x3xZ 3 v ' x 15'' Csn-r?i4?-,
J J
`zx.irL
Z
/
q Y,
- Yld Ct x3,cZ
' 3x2
?
x
C
) k3 xZ
ci x3K-L
-
C x3 x7-
s ? . Zo-?-?S-AdA
Li!
g7C3lL `?
?S, X1??'CS?' t`lG:•.?
_
EROSION CO_MOZ PL4_-
.
Sr°', 1 l t 5
MUNTY
WDFZK D?DER ?D-
?0x
S??_TA .L D;
? t'1J ? K 3?cZ..
SCALE -1, IDD,
SP- KK 1 t1' 4: y /-- t' 1Y
p plpE I STATION I SIB I CLASS I REMARKS
ZS I S Y,7 rr ?r- j ice.
c' = I ia+ I , -_ X11 I tI ;„ I - s
-
40' 18'' l
U 1 I a /i
? __:. ` ? 1 r /• I
III (
,? /?
^ G r , p
o I , PIQ.
ZS--t- So V x # S t' 1c, n - C'S Adw
I ?
I S x 15 I l f i rn ?} !
I ! r-fl-i r Cf
?
0 77 X SII /r? n d
i - ./- F
o C) I 3c), x ?s
`? Rio
Q
S I ?t n e '3 , J(? ?? /'?G?.^ I C1 /7
i
0
o
9
o
to
0
o I I I
I I I I
o I I
to I I
0
? I I I
o I I
? I I I I
o I
I I I
Ditehliner Requirements
SR 1715 Wilkes County
5+00 7+90
's2+50 30+00
27+40 30+vvv
3,+00 32+00
36+95 38+00
3(+20 38+00
8/13/0/2
LT. ROVING
LT. - RIP RAP
RT. - RIP RAP
LT. ROVING
L I .
7_ ROVING
LT. ROVING
RT. ROVING
" S.R. 17 15 County \ ? k =g
w `
Existing Road
New Road
Proposed R/W
Existing Pipe
L------} --
r -- - ---?
New Pipe ?
1 ?
Center Line
Sheet I Of 7
Date 8 12
... Sr o ?-? 1 =3J
_I
xasT: (3xpC_4°`x34u
La -Ll?
i+? ._ i I I I i l l! , l i I , j T i l l I
1
6 J'r
i l l l 1 j l
I
1
! I 1
i _ ? '
tli i i
t I
f ?
i rl t flit -;-
I
?
• i l i ,Ti ,., , I I I i i i! I I : I i i I I ' I
l I I I I I I I? I, I I - -
I ?? I I 1 I I I I .
1 i I I I -
I--- --- ?- I '
L-L -I- - I
'.
.
-- I
-
'
_
I _ IT
-
1 I I
' I i I I I
. --- i - -- ---- -_ _-_-i--_ -.. -? - 1 'J
I
R Y .-.-_.I i - - - ---- -- --?- .. -- T -- I i . -
r -
- - - 7 - - - - - --- - - -- I .-- - -
- -
- - '- -
- - =-T - - -- , - -=-?
- -
-
-- -
7
777 - - - ------ - - - -' --
--- - - - -- -C-
_- - - -. - - - I - -- -
-
- - -- _ _
Note:
Temporary erosion control
devices not shown, but will
ipc)ude temporary silt screen,
rock check dams and silt
basins, as needed.
Sunley Date 8- 2- 2Doo
Conducted By r-p ,17B.. 60. n P
Drawn B v- L
1
1
1
J
%
t I
i
f.
?Zt
o?
Fi 1
l
t
i I
l ?
i?
i
f ?
f f?
I
i I
?
I r
y
f I
a. i
?
fri I y
m ?
(
??
?? 4{
e ?9 - 6?
r.
1 C
i ?.
L?
fl
P
f O?
G cN '
Q
b?
i _
1
TopoZone - The Web's Topographic Map
Page 1 of 2
021778
ann7nn&
com
Map center is 36.27160N, 81.1540°W - MC GRADY quad [Quad Info]
` ' ,'LU{JULU116.GU111 ?. ' I ! _ ?'!!',.?/,
Copyright@2000 Maps a la carte, Inc.`
'All
G ,s r;
f t 7!
I
- L " e -
?,z 1 - l '>
/
Cem 11'tt f i'-'?
rij
1194
;
o
cc
•? - ? V
l
^, leer ,-?
-
?:s?:? ?
JJr •32u
3 j
?? rt
0 500 1000 1500 2000
meters I t I I I
miles OI 110 ,
http://www.topozone.comlprint.asp?z=17&n=4013881 &e=486171 &s=25&symshow--n&u=1 10/25/02
co
N
O
01
AA,
Pik
Top: Inlet view of wet pipe at station 11+34 on SR 1715, Arlie Myers Road, Wilkes County.
Bottom: Outlet view of wet pipe at station 11+34 on SR 1715, Arlie Myers Road, Wilkes