HomeMy WebLinkAbout20021233 Ver 1_Complete File_20020806O?O? \ NA
T ?RQG
DWQ Project No.: eZ 1 23.3 County: McKes
Applicant: Ncbor hg. n bar. -7
Project Name: BARKBe 1Pe. SR H 06
Date of Issuance of 401 Water Quality Certification: Au6o 7
zooz
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, DAyih WAyiye , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: _?e •? Date: 9/j2 f ok
Agent's Certification
I, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other, supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature Registration No. Date
NC:DENR
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/newetlands/
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
O?O? \ NA
r?94G
00
4 `C
August 7, 2002
Wilkes County
DWQ Project No. 021233
SR 1926 (Barker Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. Heath Slaughter, Division Environmental Officer
NCDOT Division 11
P.O. Box 250
North Wilkesboro, NC 28659
Dear Mr. Slaughter:
You have our approval, in accordance with the attached conditions and those listed below, to impact 29
linear feet of an unnamed tributary to Big Bugaboo Creek in order to improve SR 1926 (Barker Road) in
Wilkes County. The NC Division of Water Quality understands that there will be 90 linear feet of
impacts as a result of temporary de-watering. The project must be constructed in accordance with your
application dated August 2, 2002 (received August 7, 2002). After reviewing this application, we have
decided that these impacts will be covered by General Water Quality Certification Nos. 3366 and 3375,
corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 33 and 14. In addition,
you must acquire any other federal, state or local permits before you proceed with your project including
(but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed
regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in
the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified
below). Should your project change, you must notify the DWQ in writing and submit a new application.,
If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is
thereby responsible for complying with. all the conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this
approval to be valid, you must follow the conditions listed in the attached certification and any additional
conditions listed below.
1. NCDOT shall abide by any trout conditions and moratoriums as determined by the North Carolina
Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during
construction.
2. Riparian vegetation must be reestablished within the construction limits of the project by the end of
the growing season following completion of construction.
3. NCDOT is encouraged to use existing on-site.vegetation and materials for stream bank stabilization
and to minimize the use of rip rap.
4. Heavy equipment must be operated from the banks rather than in the stream channel in order to
minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
5. All mechanized equipment operated near surface waters must be regularly inspected and maintained
to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic
materials.
ARA
iOEN-ft
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetiands/
6. Upon completion of the project, the NCDOT or its authorized agent shall complete and return the
enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401
Certification has been completed. This will satisfy the requirements of Condition 16 of WQC 3375
and Condition 13 of WQC 3366.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Ms.
Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600.
Sincerely,
or-J-1- 1/
Alan W. Klimek, P.E.
Attachment
cc: Wilmington District Corps of Engineers
Jean.Manuele, USACE Raleigh Field Office
NCDWQ Winston-Salem Regional Office
Central Files
File Copy
}
•
021233
FILE COPY STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT
GOVERNOR PHONE: 919-733-2520 SECRETARY
August 2, 2002
Mrs. Jean Manuele
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
6508 Falls of Neuse Road, Suite 120
Raleigh, NC 27615
ISSUE[)
Subject: Nationwide Permit #14 & #33
SR 1926 (Barker Road)
Wilkes County, North Carolina
Project Number: 6.762170T (DWQ Permit Fee: $200)
Dear Mrs. Manuele:
UP
The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1926 in
Wilkes County. The roadway width will be increased from 16' to 18'. - Total project length is
approximately 0.7 miles. Impervious surface area will increase by 0.17 acres or 4%. This project
will require the replacement of one (1) wet cross line as shown below:
1) Replace existing 41'x 84" CMP at station 27+50 with a 50'x 84" CMP with baffles
and a concrete headwall.
Miscellaneous rip-rap impacts will total 20 linear ft, or less. New stream impacts = 29 linear feet.
The replacement of the deteriorating pipe with the proposed new pipe will require temporary
dewatering. An impervious sandbag dike will be constructed approximately 20 feet upstream of
the existing structure to create a small pool. Clean water will temporarily be pumped around the
construction area and will be discharged into a buffer area located approximately 90 feet
downstream of the sandbag dike. Any dirty water located inside the construction area will be
pumped into a silt bag. The dewatered area will total approximately 270 square feet or 0.006
acres. Once the new structure is in place, the impervious dike will be removed and
preconstruction streambed elevations will be restored-
Construction of this project will require impacts to waters of the United States in the Yadkin
River Basin. The above noted wet cross line carries an unnamed tributary to Big Bugaboo Creek
(Class: Q. The Division 11 Environmental Officer reviewed this project for the presence of
P. O. Box 250, N. WILKESBORO, NC 28659
PHONE (336) 667-9111 FAx (336) 667-4549
AM-M
RECEIVED
Mrs. Jean Manuele
SR 1926, Barker Road, Wilkes
Page 2
August 2, 2002
threatened and endangered species on July 11, 2002. This project will have no effect on any
federally listed endangered plant or animal species. According to the NCDOT web site, the
NCDOT Historical Architecture Section has reviewed this project and determined that there are
no NR/SL/DOE properties along this roadway that will be impacted by the proposed project (see
attachment).
The project impacts are minor in nature and should not remove or degrade existing water quality
uses. In fact, the installation of baffles in the new pipe should improve aquatic life passage. The
replacement pipe size is the minimum necessary to create a safe roadway. By utilizing the erosion
control measures outlined in the attachments to this application, downstream water quality
standards will be protected. All appropriate BMPs will be used during construction.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, and a marked topography map.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia
Van Der Wiele, NCDENR, Division of Water Quality, 401/Wetlands Unit, for her review. It is
requested that any comments related to the 401 certification be forwarded directly to me with a
copy sent to the US Army Corps of Engineers.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincerely,
Heath Slaughter
Division Environmental Officer
Enclosures
cc: Jean Manuele, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
Cynthia Van Der Wiele, Division of Water Quality (7 copies)
R. C. McCann, PE, Division Engineer
Doug Tetzlaff, District Engineer
Brian Hamby, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Dennis Bennett, Bridge Maintenance Engineer
Office Use Only: 021233 Form Version April 2001
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW #14 & #33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P. O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslaughter@.dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Heath Slaughter Division Environmental Officer
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P. O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslaughter@a dot state nc us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1926, Barker Road
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Wilkes Nearest Town: Ronda
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From Ronda, travel north on SR
2014 Turn Right onto SR 1924 and travel approximately 4.9 miles. Turn left onto SR 1926.
5. Site coordinates, if available (UTM or Lat/Long):
Station 27+50 UTM: 17502751E 4016792N
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Residential
7. Property size (acres): Approximately 4.1 acres
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Big Bugaboo Creek (Class: C).
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http//h2o.enr.state.nc.us/admin/maps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: Grade drain base and pave SR 1926.
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
grader and dump trucks
12. Describe the land use in the vicinity of this project: Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe. the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be sho«n on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 5 of 12
Wetland Impacts
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, nil,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http:/htiwvtiv.fema.aov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average
Width of Perennial or
Site Number Type of Impact* Impact Stream Name**
Stream Before Intermittent?
(indicate on map) (linear feet)
impact (please specify)
Station No. 27+50 Pipe replacement 9'feet UT to Big Bugaboo
Creek 3 feet Perennial
Miscellaneous
27+50
Station No rip-rap 20 feet or UT to Big Bugaboo 3 feet Perennial
. placement for less Creek
stabilization
27+50
Station No Temporary 90 linear
feet or 270 UT to Big Bugaboo
3 feet
Perennial
. Dewatering square feet Creek
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
vvvvlv.usas.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., wvvw.topozone.com,
wwwv.mMuest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 29 In. ft. of new permanent impacts.
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name Waterbody
)
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, cean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stofinwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken.to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to
streams in the area will be minimized. Since this is an existing, roadway, the stream impacts
cannot be avoided. However, the replacement pipe length will be the minimum needed to safely
construct the paved roadway. All appropriate BMPs will be used during construction.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.ne.us/ncwetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http•//h2o.enr.state.nc.us/wrp/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Page 9 of 12
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular trom near bane: of cnannel; Gone L extenas an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will increase by gpproximately 0.17 acres or 4%. All appropriate best
management practices for sediment and erosion control will be implemented during, construction.
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
?/z
Applicant/Agent's Signature
(Agent's signature is valid of
e, Date
if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Fax: (910) 251-4025 Cumberland New Hanover Scotland
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
v
N
Q O
O 0
CA
CD '0
0 O
N
N cr
3 N
7 ".
CD
'a
CD
v
0
n
Q
to
O
O
Cl)
v.
c ?
m
v y
c o
n
? cn
y n
G
PD
Cn `sl
N ® N
? ? O
CD
N
O O --+
c
c
v
a?
n ?
x
(PD `D <
o w m
? V y
A N
A v
j X m
(7 N
to 0
E ? H N Y
t
Ai.
R1CN A1TN.
I ._._._..-. ELEV.}5pp
wnwond
ha*KWn
CifMf» Lon
i ?•/ S 2 l g 2 C,-
7 STONE YTN.
., It
V ? '\ s
?. I
1 1736 •`'\ E , 3.1
;?; 1737 '\? •\'\ , t ?? `'?'
. 4 1730 ` 1737 / • r \' ?ti .. •`1 `r
.? J ..? 1900 1462
\ i
1 7 / 1741 :/ G 7a4[I1 1 I I 1007 `? 4 1 f' '•'
. 1ti4r ?'1 :j? / to ? •\ •1 ? . •Lo ... ,,>•1
M 15
? 1749 • '.?'? " ? '? !sl? ,? t _ .?`'. "?• ? " .
\ ' Q' a 171"6.•-? 1 1914 \ '1
1.3 1743 , 1781 :2 10(p . J / \ l
01
o / ?` J / n ??I f`,• goo 191
.5 1941 \ ?' •2 ,• 191 HELLS RNOg 4 ±.
\ *\ 17 211 ,7 EL V. 1610 y 191 .v-
1746 ^ p {• 1"° ' 1x17 --? / '
. 6 7 ..
`m
1736 ' 17 ' • • _ -{7 -
1?5 '*•_, •,.
(•• •I' 1943• __7 \..? AMr 1 ?1 1913 1914.
9 t 1 21
1747 • L f'S
'62 • \ ' ? : y 9 1946 1947 ?: 1939 ` 1907 '', _ I J . .3 6 • '2036 IS
tone? m a / ! i Zt00 ' t \ \ lr.3 1913 ?. a J
19-48 935
1745 a
N •` . 1946 t p \. \ -?7 • 5 2631.
pYEJt 1951 !? 9a p 1? \ '? 1929 1 0
1744 .,;?, .?.. /' •/`:` .\ o \ i1 ?4. \ s. .
.4J D , I y s 2030 1 n
^'•? .1)945' / 1934 2029 'J ;• 1',.
t y 7 2 a 199y? 1928 Ir JIM •.? 0 6l ; . .
2ws
. • r •? 1 6 1432 `--? ??
1914 J _ i ?'.
" • ; 11".: 19
/' 1999 20? 1933 1934 ' ' Ipei '' ` d 20,
\
' .• 1.
I i,!• ? 2011 ', ?lao ,6
??• _•? ( Q,,. 0 /'• Ila'` ~ 1990 .y `iz,? P , 110 • 2022.Q 1
p
/'_'•,• 19?p ?- 2712 •., ?- ?.. / 4; .
s I ( ,. ` . 1 , 2021 1.:•V;
20014 .8
1. 1 F" 19z+ ^2 p? . 1\ l •2017 .f• '•?
\ , o t _
1.3 zoce
j •.\ •\ 1989 ? I \ ?.?•-aQ ,b!?j ,?, ? 7364Ny
\ 1 1993 ?' \ Il t45 1.4 • R? • I •9
Nx1 1 232% 1 I f4` Z' 203 r? '?, '? •-? :}? r
I `,S l I' v , , I Spy •IC',ge `2322 y M292 ' J 1 +,
• \ ? ? .. ? F' -
tl `\ 2371 ??? 1.6 '1 2'°°I ?•?
/ (" ? ?• a '.1• t ??:: •.•1 1 ?•. ..
AMR
2318
I opuz Ui1G - 111G w GU J 1 VpVg'iapl 1G lvla-l
M?
c
a
i" ag%-, 1 V.L G
co o
Target is UTM 17 502751E 4016792N - THURMOND quad [Quad Infol
0 500 1000 1540 2000
meters L. - . i . I i . i
miles 0 0.5 1.0
http://www.topozone.com/print.asp?z=l 7&n=4016792&e=502751 &s=25 7/24/02
EROSION CONTROL SCHEDULE
(1) All adequate temporary erosion control measures will be installed before
clearing and grubbing operations begin.
(2) As construction progresses, temporary and permanent erosion control
devices shall be installed in a timely matter, according to any special permit
requirements and or requirements set out in G. S. 113A-57.
MANDATORY STANDARDS FOR LAND-DISTURBING ACTIVITY
Pursuant to G.S.113A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be accomplished within 15
working days or 30 calendar days following completion of
construction or development, whichever period is shorter, except
as provided in 15A NCAC 413.0024 (e).
DESIGN STANDARDS IN SENSITIVE WATERSHEDS
Pursuant to G. S. 113A-57 (3) provisions for a ground cover
sufficient to restrain erosion must be provided for any portion of a
land-disturbing activity in a HQW zone within 15 working days or 30
calendar days following completion of construction or
development, whichever period is shorter.
(3) All siltation and erosion control devices shall be properly maintained until no
longer needed.
(4) On projects performed by D.O.T. Maintenance Forces; request will promptly
be made to the Division Roadside Environmental Unit for stage and
permanent seeding.
(5) Any removal of siltation devices will be based on the condition of established
ground cover of that area the device is serving.
HIGH QUALITY WATERS
1. Uncovered areas are limited at any given time to a maximum total area of
20 acres.
2. Erosion and sedimentation control measures shall be designed to provide
protection from the 25-year storm.
3. Large Type-A basins shall be designed and constructed with a settling
efficiency of at least 70% for the 40 micron soil particle size transported
by runoff from the 2-year storm.
4. Newly constructed channels shall be constructed with side slopes no
steeper than 2:1, unless slopes are to be stabilized by methods other than
vegetation
5. A ground cover sufficient to restrain erosion must be provided for any
disturbed area.
SECTION 1042
RIP RAP MATERIALS
1042-1 PLAIN RIP RAP.
quarry
Shone for plain I'Ij) rap shall consist of fieldstone or rougn untie ;=,Il
stone_ The stone shall be soun(l, tough, dense, resistant to the action of air
and water, and suitable in all other respects for the I)uI'Dose intended.
Where broken concrete from demolished structures or pavement is avail-
able, _it may be used in place of stone provided that such use meets with the
approval of the Engineer.: However, the use of brokeii concrete which
coritains reinforcing steel will not be permitted.
The stone or broken concrete shall be graded to meet the following
requirements:
1. For Class I Iii) Rap. Stone.shal l varv in -weight from -to 200 pounds:
At least 30 percent of the total Nveiol)t of the rip rap shall be in
individual pieces weighing a Ininnnum of 60 pounds each. Not Inore
than 1() percent of the total's Cigllt of the rip rat) Thay be in individual
pieces weighing less than 15 pounds each.
2.``Tor Class 2 Rip Rap. Stone shall vary in weight from 25 to 250
Dounds. At least 00 percent of the total weight of the riD rap shall be in
individual pieces weighing a minimum of 100 pounds each- Not more
than 5 percent of the total weight of the rip rap niaV be in individual
pieces weiglling less than 0 pounds each.
G?1
DE"I ILS AND
?
SPEC! PICA T -ONS
Std - Dtscri-c)tion Svrbol-
16 05. of ; Temporary Silt Fence
1°'°•?'' ! Temporary Silt Ditch, ' SID
1 G3z,.6j Temporary Diversion D
i
D
I B22-01 n
ra
Temporary Slop- ?
1 530.01 Silt Basin TYpe-A
_:=1-c30_o2 Silt Basin Type-B
1533-01- T emoorary Rock Silt Check Type-A
1033.02 _ T elnpomry Rock Silt Check T ype-B
334.01 Temporary Rock Sediment Dam ype-A ?
034 D2 . Temporary-Rock Sediment Darn l ypz'B y,- . .
'035.01- :
I RPipe Inlet Sediment T rap :1 y
P
e
-- A
?.
-
14 Rock Ripe Inlei Sediment.T.rap 3 ype-g ro
n3o_fl-f Rock Sift- Screen
03£1.04 Stilling basin
Rock Inlet Sediment Trap:
15-32-01
1632.02
-i 63203
X53_ 0?
T ype-A
j yp--3
T ype-C
A J1iy?- OR. 7-A1.
B IEA -- OR -- B
C 3?-- OR -- Cj
J
_ _ UtT r r
;;?°T^_ 7c:CS 'rZOV{P.v T?iI:°? D; ?C'I nn
R iv '-i l 1 'DLe t'=G ??G? _ . . .. . . . . . . . .
LcD -
small s t--_ D cZ of i----
r, J. C)i?Tlc_i ?.Cc7 Des:?..ion
J
? a
o • s
? 7 E d
ER40SION CONTROL PLAN
'SR igZCp
COUNTY W, \ LeL0CAL NAME 6<,,rV,,c_r
WORK ORDER NO.
DRAWN BY:
'{ O%k 4\krwt'^ Z-a.. -93 20oZ
DISTRICT ENGINEER:
ROADSIDE ENVIRONMENTAL
ENGINEER:
aJ,7 f " 1eS` lJ e
NOTE:
ALL PIPE LOCATION MAY VARY DUE
TO GRADE CHANGES IN ROADWAY.
ROCK CHECKS AND BASINS ARE TO BE
REMOVED BEFORE RIP RAP OR ROVING
PLACEMENT. BASINS AT CROSSLINES
TO REMAIN.
ALL WET CROSSLINE PLACEMENT THAT
REQUIRE MORE THAN ONE WORK DAY TO
INSTALL REQUIRE A SILT SCREEN AT
OUTLET END.
STREAM INFORMATION:
O?- vo
i1xi. It 3 Z
I,
_
0 01
a
F
i
Exec-,r:-»:: un
?nc.;cr;I
qK??
tac. S o' ?r5'. CSC
Q X x-
to
SCALE I' = 100'
X
°t x 3x2-
v
0
< 310
0
0
0
0
cY?-v 0
SHEET_I OF 4
?ix3xZ
G x 3,< Z-
C
4
v
q x3x2.
6 3;
J•L
A 4u`xl8•'CSP
(?,(It 6
Gi k3KZ-
S T 11%, 4 -1- C.,
J ?5« . 3-t z s -2?p ta.z
35` x t?` psi'
?gx3Xp\?..?.
I
v 5 1,\_ t ZS
0
clY"3
EROSION C02UROL PLANT
SR ?GZ?
COUNTY LA) j?cc
LOCAL NAME arice-f -02- a
WORK ORDER ND.
Zc'i-I-u?
??k•'skL
SHEET_,Z--DF
C/J 1K kZ
A
x3 x Z.-
x XZ-
2 "C S . ?.
A
aqO
_y
,?S,)< IS" c S
9 x3,
S -LA . \O-ttct 13 - A-A- A
2S ' x Is- c s P -pta,n
Cho
SCALE T= 1DD'
Z-3 -/o
ib-+ w
?ix3X2?
-F'ROSION COAiYB- OL PLAIN
SR 19 2 C0
COUNTY LOCAL NAME '3?s kef
WORK ORDER NO.
SCALE T= 100'
sHzEr-A-_or-A_
C 2 I?,% 2 (o - I, )` 1? e- , 0,f rrr"
0 PIPE STATION SIZE CLASS REMARKS
0 18 ' 13 Add - S
0 3 ? i 1
0 C 3 ` x 1 ?alII 1 CL-c e- C p
0 -A ' x I -'' 1a, n FIA d(A - P
0 + ' p-opince a. CS P
0 c X 1 ' ` (2-e ! cl, - CS 10
0 -k Q Z 4 I Ci, A( J,6- s 1,
0 1 ?^ t 2? 3C 1`? ` ?? i n
A- 'xis'` c so
0 I + ? • x ks- p6l^ Ad . - cs
0 4 . tact-C p
0 IN! Z3-k- .-r 6e^ 0188-C-% 49
0 b 9 +--70 7-41, 1Ck. ;
0 P A S ` XI'_ p
0 5 A^ 4 " cz nsp
0 o 1 lo;
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
DITCHLINER REQUIREMENTS
SR 1926 Barker Road Wilkes County
STA. STA. RTAT.
3+70 4+65 RT ROVING
8+50 12+25 RT ROVING
9+80 11+50 LT. ROVING
15+05 21+00 LT. ROVING
21+00 22+00 LT. RIP RAP
21+00 22+00 LT. RIP RAP
25+00 26+00 RT ROVING
25+00 26+00 LT. ROVING
26+00 26+50 RT RIP RAP
26+00 27+00 LT. RIP RAP
27+50 32+50 RT RIP RAP
32+50 32+90 RT ROVING
34+00 35+50 RT ROVING
Cf)
D
Z
0
CD
D
0
E - -X11079
?b
n??,NO
h`aaZ
E
c,
F
T
c
r
c
y
b y
N z y
o
a,
b
b N
a cn b
? O
?
n
h ?
!y O
y
n
D
T-1
T-1
n
0
0
o.
n
roe z
F-
00 m
x <
m
U-1 :?E
0
n0
Dm
n
O
m
z
0
m
0
C
n
C
m
D
m
r
D
Cn
TI
n
D
0
z
i
0
m
D
CD
m
D
m
N
C
TI
D
n
m
y
a
b
W
y
(A
D
z
CD
D
O
S
m
D
D
D
r
r
O
0
m
D
m
z
0
Z
r
m
rlo <
m
00
U? x O0
o
FT-1
o °x
m °C/)
? -o z
r °
O S
< S
m m
m
-I
O
N
lp
N
U-1
O
CTI
O
Ob
F O
C
CTl
O
0
1
Fl-1
0
00
C)
b
b
i
o n
V
o C
co?
z
m
m
,
i?
I?
{ x
fl
i f
f
i
\
T
i
l
(J?
fI 1
IW
?N
S
.f
f
4
i?
I
i
i
N
r _
w ?
?ivV
I+
i
? y
{ 1 rL
i
`5 1
i
? i
I
i
i i
4
+f
+r. jN
J+.
i
4 .
l
i
i
TopoZone - The Web's Topographic Map
Page 1 of 2
-r 0 1
DAQIO
Target is UTM 17 502751E 4016792N - THURMOND quad [Quad_Info]
http://www.topozone.com/print.asp?z--17&n=4016792&e=502751&s=25 7/24/02
0 500 1000 1500 2000
meters I - i _ 1 1 1
0 r c 1 n
miles 1 _ - L