Loading...
HomeMy WebLinkAboutNCC191320_NOT Closeout Documents_20200901Project Name Inspected: Permittee: Couch Mountain Entire Project Andy Baker TFM Carolina LLC andy@tfmcarolina.com a fOUN�E�1a3H Erosion and Sediment Control Site Inspection Report Jurisdiction Inspector: Inspection Completed: Report Completed: Inspection weather: Inspection Type: Current Activity: Current Site Status: Report Generated: 08-31-20 2: Henderson County Rick Brooks 08-31-2020 02:08 pm 08-31-2020 02:08 pm Temperature: 76 degrees, Rain Monthly Not Applicable; In Compliance 1) Do conditions prevent inspection at this time? No 2) Does this site qualify for stormwater phase 2 post construction runoff? Yes 3) Are plans, inspection logs and permits on -site and available for review, Yes as required? 4) Are construction entrances installed and maintained, as required? Yes 5) Are roads and ROW's free of evidence of sediment? Yes 6) Are perimeter erosion and sediment controls installed and maintained, Yes as required? 7) Are culvert, inlet and catch basin protections installed and maintained, Yes as required? 8) Are sediment basins or sediment traps installed and maintained as Yes required and functioning correctly? 9) Is site free of evidence of erosion? Yes 10) Are trash, debris, concrete waste and solid wastes managed, as Yes required? 11) Are fuels and chemicals stored, managed and contained, as required? Yes 12) Are vehicle and equipment fueling, cleaning and maintenance areas Yes free of eveidence of spills leaks, or any other deliterious material? Couch Mountain inspected on 08-31-20 2:08pm Inspection Report Page 1 of 3 25783 ENDS Erosion and Sediment Control Site Inspection Report Report Generated: 08-31-20 2: 13) Are all inactive slopes and disturbed areas stabilized, as required? Yes 14) Have BMPs kept sediment and pollutants out of surface waters? Yes 15) Are stockpiles and spoils managed, protected and stabilized, as Yes required? 16) Are dewatering measures in use, as required? Yes 17) Does the site comply with dust control best management practices? Yes 18) Are discharge points and receiving waters free of evidence of sediment Yes deposits? 19) Do all BMPs provided operate as designed? Yes 20) Are discharge points and receiving waters free of evidence of pollution Yes (e.g. oil sheen, floating or suspended solids, etc.)? 21) General Notes & Observations See notes Notes Recorded: Phase 1 is in exceptional condition. Vegetation has been established to prevent erosion. No issues observed. Phase 1 erosion control permit is now closed out. Photo 1: Phase 1 is in exceptional condition. Vegetation has been established to prevent erosion. No issues observed. Phase 1 erosion control permit is now closed out. 8/31/2020 02:07pm Couch Mountain inspected on 08-31-20 2:08pm Inspection Report Page 2 of 3 25783 ENDS Erosion and Sediment Control Site Inspection Report Report Generated: 08-31-20 2: Photo 2: Phase 1 is in exceptional condition. Vegetation has been established to prevent erosion. No issues observed. Phase 1 erosion control permit is now closed out. 8/31/2020 02:07pm 22) Is withholding of permits recommended as a result of this inspection? 23) Are all temporary measures removed and has the site reached permanent stability? Inspected by: Rick Brooks Erosion Control Technician Henderson County (828) 694-6521 rbrooks@hendersoncountync.gov No Yes Couch Mountain inspected on 08-31-20 2:08pm Inspection Report Page 3 of 3 25783