Loading...
HomeMy WebLinkAboutNCC191846_Modification Review_20200831Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/31/2020 8:33:39 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 8/31/2020 3:20:23 PM (Construction COC ADD TO FILE Review- NCC191846) • The task was assigned to Georgoulias, Bethany. The due date is: September 3, 2020 5:00 PM 8/31/2020 8:33 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC191846 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Johnston County Airport FBO Site Development Address Swift Creek Road, Smithfield, NC County Johnston Latitude 35.5489 Longitude -78.3895 Permittee Listed Johnston County Airport Authority Legally Responsible Phillip Lanier Individual NC Reference No. NCG01-2019-1846 E&SC Plan ID JOHNS-2019-029 Original NOI 15825 Tracking No.* Date COC Issued* 09/12/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual Has Changed r Multiple Reasons (List) Addional We infornation if necessary Explanation Revision to EC plan to include onsite waste disposal. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Out Doc, etc.) Documentation Erosion Control Permit- Revised.pdf 378.83KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Artide; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto e)ceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual r Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Philip Lanier Title * Airport Director Organization * Johnston County Airport Authority Date * 08/31 /2020 Email Address* phil.lanier@jnxairport.com Errail for confirmation Telephone Number* 919-934-0992 Contact nun ber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email bbothell@wkdickson.com (Optional) Additional errail for confirmation Original Permittee Phil.Lanier@jnxairport.com Email Original Site Contact bbothell@wkdickson.com Email Review Date 08/31/2020 Rescinded Since Submitted? Request Date 20200831 Formatted Review Date 20200831 Formatted