Loading...
HomeMy WebLinkAbout20020193 Ver 1_Complete File_20020207r 4 ? Y Micnaei r. tasfey Governor William G. Ross. Jr.. Secretary Department of Environment and Natural Resources Gregor/ J. Thorpe, Ph.D. Acting Director Division of Water Ouality DWQ Project No.: Q aD 1 Q3 County: M cah g 1 Applicant: NLkpOT Project Name: 42. %1 S5 Lg-jfor j d Date of Issuance of 401 Water Quality Certification: _tj - R-03. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. A=QMZL4? ' I Signature: e• Si-nature: Date: If this project was designed by a Certified Professional y 65kstate that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial omplianc and intent of the 401 Water Quality Cert' lcat%on d Buffer Rules, the approved plans d pecif t' ther supporting material- Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the was observed to be built construction within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. I, , as a duly registered Professional (i.e., Engineer, Landscape :architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities,'due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Re-istration No. Date Oivisicn cf'Na'er Quaii-/ 1350 Mail $errica Certer Pateigh. ".C 27-309-1050 INet!a.r.ds 401 Ur.it: (919) 733-1736 Fa_c (9'9) 733-3a93 F WAIF Michael F. Easley, Governor ?O RQ William G. RossJr., Secretary - ?O G North Carolina Department of Environment and Natural Resources 7 Gregory J. Thorpe, Ph.D. > y Acting Director p Division of Water Quality April 2, 2002 McDowell County DWQ Project No. 020193 SR 1139 (Ledford Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Roger D. Bryan, Division Environmental Officer NCDOT Division 13 P.O. Box 3279 Asheville, NC 28802 Dear Mr. Bryan: You have our approval, in accordance with the attached conditions and those listed below, to impact 90 linear feet. of Harris Creek and two of its unnamed tributaries in order to upgrade SR 1139 (Ledford Road) in McDowell County. The project should be constructed in accordance with your application dated February 1, 2002 (received February 7, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us, in writing, and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre or stream impacts exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. NCDOT shall use Best Management Practices for the Protection of Surface Waters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds (15A NCAC 4B .0024) must be implemented prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground-disturbing activities to provide long term erosion control. 2. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 15, and any other conditions determined by the North Carolina Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during construction. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwettands/ 3. Where practicable, stormwater should be directed to buffer areas or retention basins and should not be routed directly to streams. 4. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground-disturbing activities to provide long term erosion control. 5. The culverts required for. this project shall be installed in such a manner that the original stream profiles are not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of each culvert. The culvert shall be installed one foot below the stream to allow for fish and other wildlife movement. If any of the existing culverts are perched, they shall be replaced and installed correctly. 6. All work shall be performed during low flow conditions. 7. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 8. The presence of equipment in the channels must be minimized. Under no circumstances must. rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 9. Existing vegetated buffers shall not be mowed in order to utilize it for storm water sheet flow. 10. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If necessary, rip-rap must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. 11. Rock silt screens at culvert outlets shall be removed at project completion. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, Gregory J. Thorpe, Ph.D. Acting Director Attachment Pc: Wilmington District Corps of Engineers Steve Lund, USACE Asheville Field Office Mike Parker. NCDWQ Asheville Regional Office Central Files File Copy MEMORANDUM TO: John Dorney Regional Contact: Non-Discharge Brancl?? WO Supervisor: C OPY Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NCDOT - SR 1139 Project Number 02 0193 Recvd From DOT .Received Date 2/7/02 Project Type Recvd By Region County McDowell County2 Region Asheville Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. am I ?OY ON Mitigation Wetland MitigationType Type Acres Feet ?I Is Wetland Rating Sheet Attached? O Y (ON Did you request more info? O Y # N Have Project Changes/Conditions Been Discussed With Applicant? O Y O N Is Mitigation required? O Y *N Recommendation: O Issue0 Issue/Cond O Deny Provided by Region: Latitude (ddmmss) 353303 Longitude (ddmmss) $20515 Comments: DOT proposes to extend three culverts a total of 90 feet- Two culverts on ut's to Harris Creek and one culvert in Harris Creek which is classified as C-trout waters. Recommend issuance with general certification requirements for NW 14 and include the following conditions: 1=AI1 culverts required for this project shall be designed and installed to allow for passage of fish and aquatic life and shall he installed in such a manner that the orginal stream profiles are not altered. Existing stream dimensions are to be maintained above and below locations of culvert extensions. Where the two culverts exist, one culvert is to be installed to allow for normal water flow and fish and wildlife movement and the other culvert installed at a higher elevation to allow flow th__-rough it during higher flow events (bottom of culvert at bankfull): 2 Stormwater shall be directed to buffer areas or retention basins and not routed directly to streams;, 3_Sediment and erosion control guidelines for sensitive watersheds. A wl- .... ..?. :_ aL- -.L-- __ -3..-:-- iL_ a.._. a -:-- _----.- -L ^_t_L v...4 r° LL ........L A.. ..:1 4 r- cc: Regional Office Central Office Page Number 1 Facility Name NCDOT - SR 1139 County McDowell Project Plumber 02 0193 _ RejJonal ontact: Michael R. Parker Date: Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 FILE COPY U--4 o z ?? g STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR PO BOX 3279, ASHEVILLE, NC 28802 February 1, 2002 SECRETARY Mr. Steve Lund " '- US Army Corps of Engineers . s 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Nationwide Permit #14 FEB - SR 1139, Ledford Road State Project No. 6.872082T (DWQ Minor Permit Fee$200) McDowell County, NC 02p193 Dear Mr. Lund: I have enclosed a straight-line diagram with erosion control plan, a PCN application for NWP #14, and a vicinity map relative to the proposed paving project on SR 1139, Ledford Road, McDowell County, NC. Ledford Road is currently a 14-16 feet wide gravel road. Division of Highways plans to pave the road 18 feet wide and increase the typical section. Grading will be light. We propose to extend three existing culverts on Harris Creek and 2 UT's. Total extensions will be 90 linear feet. Existing channel morphology will be maintained upstream and downstream of the culverts. The culverts will be placed below existing streambed elevation. Riparian vegetation will be reestablished along disturbed areas associated with the culvert extensions. No significant effect on federally listed species (threatened or endangered) or their critical habitats is anticipated. By copy of this letter, we request Owen Anderson, North Carolina Wildlife Resources Commission Mountain Region Coordinator, to comment directly to the Corps concerning the permit request. Mr. Steve Lund Page -2 SR 1139, McDowell County Februaryl, 2002 By copy of this letter, we are asking Mr. Ed Ingle, Area Roadside Environmental Engineer, to comment on the above project. Temporary encroachment into the buffer zone will not be required for the project. The streams are classified as trout. By copy of this letter, I am forwarding seven (7) copies of the application package to Cynthia Van der Wiele, NC DENR, Division of Water Quality, 401/Wetland Unit for review and comment. Please charge the application processing fee of $200.00 to work order # 6.872082T. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer. Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs, please contact me at (828) 251-6287. Sincerely, n Roge . Bryan Division 13 Environmental Officer Enclosures cc: F. D. Martin, P.E. G. R. Spangler L. R. Watkins, P.E. Ed Ingle Owen Anderson Cynthia Van der Wiele Office Use Only' (? Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing Check all of the approval(s) requested for this project: X Section 404 Permit ? Section 10 Permit X 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information Owner/Applicant Information Name: NC Department of Transportation Mailing Address: P.O. Box 3279 Asheville NC 28802 Telephone Number: 828-251-6287 Fax Number: 828-251-6394 E-mail Address: rdbryan?dot state nc us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page I of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1139 Ledford Road 2. T.I.P. or State Project Number (NCDOT Only): 6.872082T 3. Property Identification Number (Tax PIN): 4. Location County: McDowell Nearest Town: Marion Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): SR 1139 is located off of Sugar Hill Road (SR1001) and SR 1140 southwest of Marion. Take I-40 Exit 81 and proceed south on Sugar Hill Road for gpproximately 10 miles. Turn right onto SR 1140 the right onto SR 1141. 5. Site coordinates, if available (UTM or Lat/Long): 35 33'03"N 82 05'15"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Existing secondary road 7. Property size (acres): 4. 8. Nearest body of water (stream/river/sound/ocean/lake): Harris Creek 9. River Basin: Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:/Ib2o.enr.state.nc.us/admin/maps/.) Page 2 of 8 10. Describe the purpose of the proposed work: We propose to grade drain base pave and install erosion control measures for SR 11390 (Ledford Road). We propose to extend three existing culverts on Harris Creek and UT's. Total culvert extensions will be 90 linear feet. The culverts will be installed to insure aquatic life passage within the stream 11. List the type of equipment to be used to construct the project: Excavator, backhoe, and trucks. 12. Describe the land use in the vicinity of this project: Rural, homes and wooded. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction"schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No no future plans VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Page 3 of 8 Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httn:.www.fema.sov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0.0 Total area of wetland impact proposed: 0.0 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? especify) Sta. 28+00 Culvert 30 UT 1 to Harris Creek 3 ft P Sta. 40+00 Culvert 30 UT 2 to Harris Creek 1 ft P Sta. 46+50 Culvert 30 Harris Creek 5 ft P * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.tol2ozone.com, www.inapquest.coin, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 90 feet. 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Page 4 of 8 Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stor"mwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existin>7 secondarv road must be improved to meet current safety standards for a paved road The culvert extensions requested are the minimum necessary to establish an appropriate typical section for the roadway that will be stable and prevent future erosion. Riparian vegetation will be established on disturbed areas associated with the project construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 5 of 8 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://'h2o.enr.state.nc.us/Incwetl.ands/stmip,ide.htn-il. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.usi%vm/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes X No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No X If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near banK or cnannei; Lone / extenas an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. Page 7 of 8 XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The existing compacted gavel roadway acts as an impervious surface. Paving of the roadway should eliminate sedimentation from fines associated with gavel surface treatment. The roadway surface will be 40% of rit of way surface area. Stormwater will diverted through settling basins or grass lined buffers prior to entering the streams. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). With regard to hazardous spill basins the road is not classified as an arterial route, therefore hazardous spill basins are not required. 2z/ A pli nt/Agent's Sidiature ' Plate (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 8 of 8 zz? 1 y: ? Sa 6 - - Kno - Cb. plot \> ?' END PROJEC 1 \ A ORO ?l Gap BEGIN PROJECT -\ _ ,14 226 x NQ /\lC ° \ rya ! - `? .i 1200 - 1^? \ 200 \\\v \ \ '? ji? 1319 ?- . ?? ,?D? •?l?E` rte; ?? eP?_-? ?"? ? -• ? ? C>' `, ?f' J?? ? \\ ? ? ; ?.? ? _ Ofl ?l 9e Whitehouse ?M ? i' tfa¢d-?ove• 1328 ` B 8 1 ?i' 1 ?'`? `???1`^'?/ C/'? ?l ! o \? ?? ?° I `.5 tone. 'L--?? Vicinity Map: SR 1139, Ledford Road, McDowell County, NC (Sugar Hill Quadrangle, Scale 1:24000). COUNTY: McDowell PROJECT: SR 1139, Ledford Rd. LENGTH: 3,875 feet, 0.73 miles WORK TYPE: grade, drain, base, pave, erosion control RURAL PRIORITY M 24 LOCATION: From SR. 1141, thence for 0.73 miles SUBD/RESID. PRIORITY M R/W WORK ORDER NO: 4.472991 (o.$rTaOYaT CONSTRUCTION W. O. NO. DATE: 2/6101 SCALE: 1"=50' DRAWN BY: D. G. M. NOTES AND PROVISIONS PERTAINING TO STRAIGHT LINE DIAGRAM 1. Assigned right of way agent needs to verify all property owners. Property owners shown on the straight line diagram are taken from tax maps only. 2. Fences to be moved off the right of way and reset off right of way by the Department of Transportation crews. Any new materials, posts, wire, etc.. to be supplied by the property owner. 3. Existing asphalt or concrete drives to be tied in with asphalt if the existing driveway is within 20 feet of proposed centerline. See any exceptions on straight line diagram. 4. Driveway pipes to be furnished and installed as needed by Department of Transportation crews in existing driveways. 5. Existing water lines, sewer lines, drain lines, etc., under road project to be adjusted by Department of Transportation as needed during construction. Property owners to supply all materials and release Department of Transportation from any liability. 6. Underground utility lines to be located by owner. Lines to be adjusted by owner as needed, otherwise retain. 7. Note proposed right of way markers shown on straight line diagram. 8. Please inform property owners that cuts and fills could exceed proposed right of way. 9. The erosion plan should be used for erosion control purposes only. t' ro ?s ( 0 ?? (? 0 ? ?' 0 , SHEET 1 OF 16 TOWNSHIP: Montford Cove SR U39, LEDFORO M - MCOOMELL COMITY TYPICAL SECTION 4S' SHEET-2-w - - E A. FILL SLOPE 1%11 ABC Co1rPACTED B. SHOULDER SLOPE i' PER FT. ABC LOOSE C. DITCH SLOPE 3 it TONS WRIVES) 0. CUT SLOPE 1VA 1 TONS QNTERS.) TONS QWM TONS (TOTAL) STONE BY RLL f1A.L 8lrEf?YATDON 7---?? SECTION - EE 2/3 7wooLEanm - P.C. OR P. T. SECTION - DD 10 MMTM = NoWw. aMM SECTION - CC LEVEL CRO N SECTION - BB NoiAL awo SECTION - AA STANDARD NETHOO FOR OBTAINING SIIPERELEVATION 2 LANE PAVEMENTS Ideally. 2/3 of superelevation is obtained at P. C. or P. T. as shown on Section - W Examples if maximum supsrelevatton is +.86 -.86. the ??F vat?on +.84 - at the port of ourve or int of tangent is .W X 2/3 = .84 Superelevetwn for 18' Pavement .82 8.4' E.P. to E.P. .84 8.7' E.P. to E.P. is 1X E.P. to E.P. .08 L4' E.P. to E.P. - 8.2 Sheet 4 of 16 EROSION CONTROL PLAN SHEET Generally, the order of installation of the erosion control measures will be as follows: Temporary silt basins shall be installed before clearing and grubbing begins. Silt fences and temporary silt ditches shall be installed after clearing and before grading. Temporary stone ditch checks shall be installed as soon as ditch line is established. Pipe outlet and inlet protection will be done as soon as the pipe is installed. Seeding and other permanent erosion control measures are to be implemented as soon as practical. Temporary rock silt checks (type B) will be spaced as required by percent of grade as described on page VI-16 in the Erosion And Sedimentation Guidelines. No. 5 stone, or equivalent, will be used in conjunction with temporary rock silt check Type-B in locations where water is leaving the project or entering a pipe. Silt basin size is 9'x3'x2' for 75 feet of disturbed ditch line unless otherwise noted. Silt basin (Type B) are designed for 1200 cubic feet per acre every storm event and cleaned out when half full. Per permit conditions for Corps of Engineers and the Wildlife Resources Commission, all pipes in streams must be buried 12" below streambed elevation. Sheet 5 of 16 PIPE INSTALLATION NOTES 1) Install erosion control devices. In streams, where necessary, rock silt screen will be used. 2) Remove material and existing pipe while limiting, as much as possible, material and sediment from entering the stream and/or escaping from project. 3) Prepare pipe foundation while again taking care to limit, as much as possible material and sediment from entering the stream and/or escaping from project. Where possible, new grade will be below existing streambed. If needed, bedding material will be clean stone. 4) Place the new pipe and compact backfill. 5) Install slope protection on outlet and inlet ends of pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measures. 6) Establish permanent vegetation as soon as possible. -OF' .16- 1288 CUBIC FEET PER ACRE CHECKED EVERY STORM EVENT AND CLEANED OUT WHEN HALF FULL NOT TO SCALE 9. r SILT BASIN - 1 (S. B. 7 I r LENGTH OF DISTURBED AREA 75' r SILT BASIN - 2 (S. B.14 ) ro? r SILT BASIN - 3 (S. B. 21 ) 41\ :10' \ r SILT BASIN - 4 (S. B. 28 ) LENGTH OF DISTUFMM AREA 288' r LENGTH OF DISTURBED AREA 388' r LENGTH OF DISTURBED AREA 488' SHEET -2 --OF 16 EROSION CONTROL DETAILS AND SPECIFICATIONS Std, # Description 245.03 Temporary Silt Ditch Tso - 245.05 Temporary Diversion M -? - 893.01 Temporary Silt Fence iii i W _ 890.05 Temporary Slope Drain with Earth Berm 245.01 Silt Basin Type A 245.02 Silt Basin Type B - 892.04 Temporary Rock Silt Check Type - A 895.10 Temporary Rock Silt Check Type - B t-)O- 892.01 Temporary Rock Sediment Dam Type - A - 892.02 Temporary Rock Sediment Dam Type - B _:D 897.01 Rock Pipe Inlet Protection o ° - 894.01 Rock Silt Screen -3 245.04 Stilling Basin Rock Inlet Protection 896.01 Type A A1 0 1 -OR - A 896.02 Type B B L01 -OR - B 896.03 Type C 900009 CU -OR - % C j SHEET.JLOF16 (WIDTH OF ROCK AT THE OUTLET END TO BE 3 TIMES THE DIAMETER OF THE PIPE AND TAPERED INTO EXISTING DITCH) M4? 18' CSP RR 18 M?° J EMTM DITCH 24' CSP RR 24 EXISTING DITCH 30' CSP RR 30 M+?. EXISTING DITCH 10.5' 42' CSP RR 42 i L_I X 3 \ 0 w N 00 aO 0 Of F 3 SBW FENCE MOVE OFF R/W DOT 14 MCDOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 9 OF 16 13 12 O JEFFREY EVANS DB. 283, PG. 492, ' 79 138 BARTLETT RD. MARION, NC. 28752 PROPOSED R/W i v 0 0 i 0 I1o III BURLIN GENE V2INT. & TOMMY RAY HARRIS %2INT. O (BROTHERS ) OB. 562, PG. 805. ' 98 271 THOMPSON RD. RUTHERFORDTON, NC. 28139 3I uX N O CL O a. X 100 Pt . 1? O0 >>411 15R,00?.q15 p. XSP >>3 N k 7? / ?a3 E SR, IkAk _ 1141 6' G ?? (z cc 0 La (L 0 TD 9\ /a 03SOdoad asp ?'! \ \90 IC BEGIN PROJECT STA. 9+10 r.SR.1141 BEGIN PROPOSED 22.5' R/W LT. & R o a\ o- I? 19 I I MCOOWELL COUNTY SR. 1139 LEDFORD R0. _ 3 I SHEET 10 OF 16 - a: o w ? +qq PED +44 T.P. a_ 0 38'RT. (OK) 38'RT. (OK) I 18 I MANLEY R.& MANLEY R.& DOROTHY LEDFORD & I I DOROTHY LEDFORD & INEZ G. LEDFORD 3 INEZ G. LEDFORO 3 DB. 533, PG. 398, ' 97 I I OB. 533, PG. 398, ' 97 721 LEDFORD LN. 721 LEDFORD LN. MARION, NC. 28752 I I MARION, NC. 28752 I A I I 17 . l I -D 0 22. ' 2.5 0 m 0 16 +70 E.I.P. ??X o 201T. (NEED OFFSET) p ?X to I ?L +51 E.I.P. X 29.O'RT. (OK) 3 SBW FENCE J IN I MOVE OFF R/W DOT I 15 X I I n1 5T 11vU '"50/ X 18' RCP E Al +72 P.P. 211T. (MOVE) i I o I \ BURLIN GENE %ZINT. & o X, TOMMY RAY HARRIS %ZINT. G:) JEFFREY EVANS o_ o ' `I ' (BROTHERS ) O 08. 283, PG. 492, 79 a. I I OB. 562, PG. 805, ' 98 138 BARTLETT RD. X 4 271 THOMPSON R0. MARION, NC. 28752 I I RUTHERFOROTON, NC. 28139 ( ( 14 24 3 o: 0 w N 0 a 0 a Fj MCDOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 11 OF 16 23 MANLEY R.& DOROTHY LEDFORD & O INEZ G.LEDFORD DB. 533, PG. 398, "97 721 LEDFORD LN. MARION, NC. 28752 22.6' 0 2.5 oN m 0 QBQN? H 10 \ ? =R• fNTR. \ 1 10' OR. DR. MANLEY R.& 22 DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 +96 P.P. 18'RT. (RETAIN) +96 PED 17.5'RT. (RETAIN) 21 20 3 o: 0 w N d 61 19 29 MCDOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 12 OF 16 +18 P.P. +1_ PED 151T. (MOVE) 14.51T. (MOVE) MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD OB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 15' GR. ENTR• ? I 0 w O N O d T STREAM ?I SG,'-/ / =1 =::I STREAM ::-:? 28 EXISTING 32' X 30" CS NOTE: PER PERMIT CONDITIONS FOR CORPS & WILDLIFE, ALL PIPES IN STREAMS MUST BE BURIED 12" BELOW STREAMBED ELEVATION. 27 MANLEY R.& 22. ' 2.5' o DOROTHY LEDFORD & m O INEZ G. LEDFORD ° DB. 533, PG. 398, ' 97 721 LEDFORD LN. Al I MARION, NC. 28752 1 1 26 25 3 w 0 CL 0 ci: CL h -" G 24 . MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD - DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 3 a w N O II ?II 22.5' 1 of of w J M N Ln -o O v O N m 0 34 MCOOWELL COUNTY SR. 1139 LEDFORD R0. SHEET 13 OF 16 33 +21 P.P. 19.5'RT. (RETAIN) 32 MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORO DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 31 30 +I PED 16'1-T: (MOVE) 3 O W N O 4.. .O cr CL °I +q PED 22'RT. (RETAIN) 29 39 0 3 0 w 0 0- 0 d MCDOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 14 OF 16 38 5 t FLORENCE POTEAT 3/5 INT. (MOTHER ) O BILLY DEAN POTEAI 2/5 INT. (SON ) DB. 565, PG. 303, ' 98 2671 US. 70 WEST MORGANTON, NC. 28655 / lklV O ??? I 0 22.3' -e 2.5'! o m 0 ® I I I il? eisl it II 3 w V) O, a C) a C 37 MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 36 35 34 44 MCOOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 15 OF 16 +O5 PED 231T. (OK) MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 43 42 MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 41 +29 PED WRT. (MOVE) EXISTING BURIED PIPE 40 R. & DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 NOTE: PER PERMIT CONDITIONS FOR CORPS & WILDLIFE, ALL PIPES IN STREAMS MUST BE BURIED 12" BELOW STREAMBED ELEVATION. 39 MANLEY R.& 3 DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398, ' 97 0 721 LEDFORD LN. a MARION, NC. 28752 CL MCDOWELL COUNTY SR. 1139 LEDFORD RD. SHEET 16 OF 16 I 0 2.5' Kl/ I END PROJECT STA. 47+85 (L SR. 1139 END PROPOSED 22.5' R/W LT.& RT. Gam' P OP. TURN AREA 40' F- STA 47+55 END PROP. 40' R/W RT. BEGIN PROP. 22.5' R/W RT. STA 47+25 END PROP. 22.5' R/W RT. BEGIN PROP. 40' R/W RT. 47 a srReaM .., _ ^ \X I 22. 2 5 SBW FENCE MOVE OFF R/W DOT I I I I I. I +54 P.P. +54 PEO ° 18.51T. (RETAIN) 18.51T. (RETAIN) MANLEY R.& F I o2 DOROTHY LEDFORD & 3 INEZ G. LEDFORD O N OB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 3 c 0 MANLEY R.& N DOROTHY LEDFORD & a 0 INEZ G. LEDFORD a O DB. 533, PG. 398, ' 97 721 LEDFORD LN. MARION, NC. 28752 .D O .5 0 ?m O EXISTING s EaM? 2 X( 24' X 48' ) C S P NOTE: 46 PER PERMIT CONDITIONS FOR CORPS & WILDLIFE, ALL PIPES IN STREAMS MUST BE BURIED 12" BELOW STREAMBED ELEVATION. 45 MANLEY R.& DOROTHY LEDFORD & O INEZ G. LEDFORD DB. 533, PG. 398. ' 97 721 LEDFORD LN. MARION, NC. 28752 44 as SR 1139, Ledford Rd.: begin project at survey station 9+10 in th, centerline of SR. 1141, thence in an northerly direction for a distance of 3,875 feet, 0.73 miles, to the end of project at survey S station 47+85. d - MCDOWELL COUNTY s y 80 BIG Lx"9L. BIG GAP ?ac sic C19 Sun" Vale' I y e35 5 \ b c.mo.o. S /. / rotes ` tl ,'? , 43HIGH PINxAC,, ??I? • I J i 1 j I GLASS ROCK S i GREYBEARD urv. a•.v l ? • Graphite i 1 14M l •1 I s l \ P •? lap] _..- 4NANIV NN ! • - GAP ? • ? as] ao . to ,.«.? ?; - - •' \ JIFN i EVANS KNOB Moffit 1 \ \ Hal 3Y 31' 09 212 •,06J ti '27 -"33 _ \ \ 11- cm-l _ -3C \ .] }'• :.? ! -29 '!77 - Sugar 00 2.? J6=C3 /.' ..23 `Y \ Hill ?T - 00 1 105- "23, '23 '00 32 WrCh.YAN RIDGE •? ? 39 .a. R U T H E R F O R D i ? - i Date: a?13' To: E]RRO Steve Mitchell Project Name ?FRO Ken Averitte DWQ Project Number F_1WaRO Deborah Sawyer County MWiRO Joanne Steenhuis VAR RO Jennifer Frye O Mike Parker ?MRO Pete Colwell From: V Ge/ Telephone(919 733- ?7b C lv'?&(7 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted [?Ceam determination ? Wetland determination and distance to blue-line surface waters on USGW topo maps inimization/avoidance issues „'- ? Buffer_ Rules (Neuse, Tar-Pamilco, Catawba- Randleman) _ : - ? Pond fill E] Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? 616heck drawings for accuracy ? Is the application consistent with pre-application meetin s? ?V_r F WK y y? Y _v^. l1 fir' - Y y, ? pT- ' I cRpG r > _ -i 4 'C Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality DWQ Project No.: _Oa1J 1 q'3 County: ANC QCrhee 1 nz. Applicant: NLOOT Project Name: 52 it 3ci (,e I frir) Todd Date of Issuance of 401 Water Quality Certification: 11 - - Certificate of Completion ?4, Upon completion of all work approved within the 401 Water Quality Certification or app Efer j Rules, and any subsequent modifications, the applicant is required to return this certificate to 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, lYC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certificatio 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: -Date: Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date M"A N06FNIRP Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Wetlands/401 Unit: (919) 733-1786 Fax: (919) 733-6893