HomeMy WebLinkAbout20011830 Ver 1_Complete File_20011213OF WArF9 Michael F. Easley, Governor
?O? pG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
> Gregory J. Thorpe, Ph.D.
< Acting Director
Cl) r
Division of Water Quality
January 10, 2002
DWQ #01-1830
Madison County
CERTIFIED MAIL- RETURN RECIEPT REQUESTED
Roger D. Bryan
Division 13 Environmental Officer
NC DOT
PO Box 3279
Asheville, NC 28802
Dear Mr. Bryan:
On December 13 2001, the Division of Waa- 0jaity (DW'Q) was notified by receipt of your application regarding
your plans to fill streams for the purpose c hmp?m-ibg SR 1143(Upper Brush Creek Road) in Madison County.
Approval from DWQ is required to impact then: a7B-- P6 -as--- seven copies of the following information and
refer to the DWQ number listed above in your -aply- The maps do not clearly show whether stream relocation will be
needed from stations 29 to 26 near JD Gospe's' pmpe ry, : stations 59 to 57, stations 69 to 81 (along the Bernard
and Shirley Murray property) and st6ons 86 rn 82, along Ralth Dublel's property. Please show these on maps of
suitable` scale (for instance 1" = 100 met) so me r-an begin ro determine your projects compliance with 15A NCAC
2H.500.
Please call Cynthia Van Der bftfiele 733-1786 if you have any questions or would require
copies of our rules or procedural to^;a:= -7 pile will remain on hold as incomplete in accordance
with 15 A NCAN 2H .0505 (c). T're proc=-----Ji-r_ :ne 707 this application will begin when this information is
received. If we do not hear from you will-hrl tc- (3) seeks of the receipt of this letter, we will assume
that you no longer want to pursue tfhis praezt a rW w7 comider it withdrawn.
Sines yours,
J
Cc Asheville DWQ Regional Office
Asheville Corps of Engineers
Central Files
File Copy
Wetlands/401 Unit 1650 Mail Service Center Raleigr,. AC 2769?*-IE50 Ph: (919) 733-7015 Fax (919) 733-6893
VAT,
Mg-NR
Customer Service
1 800 623-7748
F WA Michael F. Easley, Governor
IF
`0y William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
co ? Gregory J. Thorpe, Ph.D.
> Acting Director
Division of Water Quality
February 1, 2002
Madison County
DWQ Project No. 011830
SR 1143 (Upper Brush Creek Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. Roger D. Bryan, Division Environmental Officer
NCDOT Division 13
P.O. Box 3279
Asheville, NC 28802
Dear Mr. Bryan:
You have our approval, in accordance with the attached conditions and those listed below, to impact
40 linear feet of Brush Creek and its two of its unnamed tributaries in order to upgrade SR 1143
(Upper Brush Creek Road) in Madison County. The project should be constructed in accordance with
your application dated December 10, 2001 and additional information dated January 17, 2002. After
reviewing your application, we have decided that this fill is covered by General Water Quality
Certification No. 3289 corresponding to the U.S. Army Corps of Engineers Nationwide Permit
Number 14. In addition, you should acquire any other federal, state or local permits before you
proceed with your project including (but not limited to) Sediment and Erosion Control, Non-
Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying. 404 permit unless otherwise specified in the Water Quality Certification.
This approval is only valid for the purpose and design that you described in your application except as
modified below. If you change your project, you must notify us, in writing, and send us a new
application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills for
this project (now or in the future) exceed one acre or stream impacts exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For
this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. NCDWQ understands that stormwater will be diverted through grass-lined ditches or vegetated
buffers prior to entering streams. NCDOT is encouraged to avoid mowing any existing vegetated
buffers in order to utilize it for storm water sheet flow.
2. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of
ground-disturbing activities to provide long term erosion control.
3. The culverts required for this project shall be installed in such a manner that the original stream
profiles is not altered (i.e. the depth of the channel must not be reduced by a widening of the
streambed). Existing stream dimensions are to be maintained above and below locations of each
culvert. The culverts shall be installed one foot below the stream to allow for fish and other
wildlife movement; culverts that are presently perched shall be removed and installed correctly.
All work shall be performed during low flow conditions.
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), httpJ/h2o.enr.state.nc.us/ncwetlands/
4. All mechanized equipment operated near surface waters must be regularly inspected and
maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or
other toxic materials.
5. The presence of equipment in the channels should be minimized. Under no circumstances must
rock, sand or other materials be dredged from the wetted stream channel under authorization of
this permit, except in the immediate vicinity of the culverts.
6. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted
when practical. If necessary, rip-rap must be limited to the stream bank below the high water
mark, and vegetation must be used for stabilization above high water.
7. Rock silt screens at culvert outlets shall be removed at project completion.
Upon completion of the project, the NCDOT shall complete and return the enclosed
"Certificate of Completion" form to notify NCDWQ when all work included in the §401
Certification has been completed. The responsible party shall complete the attached form
and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon
completion of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715
or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208.
rpe, Ph.D.
WinDirector
Attachment
Pc: Wilmington District Corps of Engineers
Steve Lund, USACE Asheville Field Office
Mike Parker, NCDWQ Asheville Regional Office
Central Files
File Copy
e' ?TNF o
V1 ISSUED
?.4.R?.
FILE COPY ANEW
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
PO BOX 3279, ASHEVILLE, NC 28802
January 17, 2002
f 'v
Ms. Cynthia Van Der Wiele q
NC DWQ- Wetlands/401 Unit jAsv, 2 5
1650 Mail Service Center
Raleigh, NC 27699-1650 011830,
Subject: Nationwide Permit #14 - DWQ #01-1830
Additional Information
SR 1143, Upper Brush Creek Road
Madison County, NC
Dear Ms. Van Der Wiele:
Maps detailing sections of the above project adjacent to jurisdictional waters on SR 1143
are enclosed. They are similar to copies forwarded in the original application (Scale 1" _
50 feet). No request for stream relocation was included in the original application. The
NC DOT will not relocate Brush Creek or any tributaries on SR 1143. The proposed
roadway widening within the sections that are mentioned in your letter dated January 10,
2002 will occur on the side opposite the streams.
If you have any further questions or information needs, please contact me at (828) 251-
6287.
Sincerely,
Rog D. Bryan
Division 13 Environmental Officer
Enclosures
cc: F. D. Martin, P.E.
K. A. Wilson, P.E.
Steve Lund
o?oF wArF9Pc
Uj rT''
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
January 10, 2002
DWQ #01-1830
Madison County
CERTIFIED MAIL. RETURN RECIEPT REQUESTED
Roger D. Bryan
Division 13 Environmental Officer
NC DOT
PO Box 3279
Asheville, NC 28802
Dear Mr. Bryan:
On December 13 2001, the Division of Water Quality (DWQ) was notified by receipt of your application regarding
your plans to fill steams for the purpose of improving SR 1143(Upper Brush Creek Road) in Madison County.
Approval from DWQ is required to impact these areas. Please provide seven copies of the following information and
refer to the DWQ number listed above in your reply. The maps do not clearly show whether stream relocation will be
needed from stations 29 to 26 near JD Gospels' property, at stations 59 to 57, stations 69 to 81 (along the Bernard
and Shirley Murray property) and stations 86 to 89, along Ruth Dubler's property. Please show these on maps of
suitable'scale (for instance 1" = 100 feet) so we can begin to determine your projects compliance with 15A NCAC
2H.500.
Please call Cynthia Van Der Wiele at (919) 733-1786 if you have any questions or would require
copies of our rules or procedural materials. This project will remain on hold as incomplete in accordance
with 15 A NCAN 2H .0505 (c). The processing time for this application will begin when this information is
received. If we do not hear from you within three (3) weeks of the receipt of this letter, we will assume
that you no longer want to pursue this project and will consider it withdrawn.
Sincerely yours,
Cc Asheville DWQ Regional Office
Asheville Corps of Engineers
Central Files
File Copy
l
n ome
Wetlands/401 Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Ph: (919) 733-7015 Fax: (919) 733-6893
NMEW
Customer Service
1 800 623-7748
? 13
I
I I
I
I
I
I
I
I
LAWAI W i I
? I 1
I
?
I
I
I 1o
I
i
.
Zo=!$?CtfPCREP.w40?-!$"CMP? I
I
°: I
I
I
?
I I
? I
7
I I
11
I
,7"ANI?s R. ,QoGE?s
I I
248- S I
?S4 UAER eivo C?Eck k?U, I
?Aes>yA«
N.c. ZA7S I
?
u.5 i I
. I
1
I
!l 17
I
I
I
10
I
I I
?o ? I
I
I? I I I
I? 1
z
e
c
°°g
I
l
?ASH? ?A« ? I I
Z14 `so i
I
I i
I
I
• .1
I
? I e I
1
5 I
CUcT/yAT1o/V
S't rPCin. 0 t-+ l` i'de
J o . GosNEl?4
/37 - 95
s 1116 h, ,Pod At -rN.
?'1A,PsHAcc.? ?t/. c. Z fl ?S3
k?ivuErH e SE??
A?USay
}
BARD(
/0'56/4 D0,
z.
??o S ?`te
FAG?a w ? 1S fivPGY11,,
96,P1vA,ev,F 5,11 eer ti1U/22?
1161S-7Z9
CGflvo? £ B.P?'N? gliGG/y1A^/
l4?-S66
T
68?
I I lo'SO? D?
I
Io'GR•DG? .
I I
I I
X189 ? •.
I I
I I
I
I
i I .
I I
I FA?to vt!
T b l( I
I I /
l6S -70
I ' •' 30 = 4S''C?sfP C =x r. to '?
I I
.• I I
I
14 81
I I
I (
I I
I I
I 1 +q7,
I I
I I
s I t%1
1871 r
? o
I I .
I I
I
I I
? I
I
?„1P '
F(??i
lo'GR.
o r?P° ,fig - . _ t I
AtiSriN F-A0LKNE R S??P?t+? I
,?50
8a R 28R SN CREW k Rd . i i
MARSHA LL NC Z 8 I
I I
60 = 7 z "CMP
I
I ?
. I
• I I
E/ I I
/ t6
6 9 r X asaw
I I
? ? t I
I
I
i I
1 I
coc.rl VA1'ro 18 I ?ASTu??
I
I I
US
I '
L?RNARD ? S NlRL?Y MURRA ?/ I I .
ILS-7d t i L?EI?NA? Sl(IRLc!/ I?cJRRAI/
I i /?5 - 7O
• I I4
I -,1
• I I
I I ?
I I
u •
1 I ul
t I
I
i
' ( I SOS ? =/8'GM? ?ExT. /D
`al
I
• ? I i
i I
I I'
• +r6 ?? I I
? 4 11 ?
I i.
I I?
I II
ZZ.s' I
I I
?ALLObY I I
I I
OPpQ?1 cr???cr^ 410 1
r *oI. I.
AasriN FADLANER ?Eb I I .
82 - 28¢ °
' +S I I
h/p?? h17 p I i
r? SyFD
f? I I
ZI• I I
I 1
? i
is61
ISFfl i I ,
I
? I
I
I'
x•
\I X ,
v
15110 11 1
I ?
I I .
I
I
I I
I I
I I .
( i
/=sZ/-,oW
23EAA RD e/SH/R[E'Y MJARA51
165- /O
s•c k. .
.7AM-'5 'r /VAA1G y VAS 7"
/s2- 343
liz.
opf
VV
FALto Id!
AUSTIN TAoL-1QVi
82-284-
0
? 197
1
? I
I I
I t
I ?
I I
I 1
. i? ?, I
I t
i '
t
s'
?
i
I I
I
I
t t
I r2'
?ellc e
r,4LZ, 0W
I ;
I
I 1 SA?? s NANCY VL-sT
i I /52 - 343
133 EA 5T DR 1 V-
0
/?'IEMP?lS TV. 38112
t I
U
I
l? I
(
1
I_ I
P
T
SEAMAP-D e,514I ZLr- ?/ ?lJR2lZR?/
i /_ c rn^
-T)mr-S $/VAA-)CV
X52 - 393
TA?Go ?/
vv - c,- (e jq " v)?
6 p,-<e
c?-r eo
?I Q6)
I I w•
I I
I i
I
I I
I ?
I I
i
i I
I
I i
v i I
w I I
? I
? I
Y 16 I
I I
I I
I I
I I
I ?
I I
Ibsl
le-
I I
I i
I
I I
I '1
YI I ?-
1I 189 j
I I
I I
I I
I I
i I
I I
I ?
-7't1 Mc5 e AlANCY VEST
?s2 - 393
?flLGow
p,4 +75
4 ' E IP +7
I 30'
I I
I /
I
it
i
I ,
t n Use ? I:
I Ph?? ?J?? 8
w `d
r c I;
F.gLGO Gtl I HALLO Gtl
I?
oTH T. D UBL? }Z
27 2 -2(o2
2842 5umsa i D2.
CHARLOTTE NC.. 2S2Oq
i
TAMES e NAtic v 11EST
/52 - 393
22.s'
I
? i
t
{RUTH T.
1?1?i3?}Z
y 8?o I I 278
I ;
I ,
8 +'
r I„ 1
I
3S=3G C^0CFXT.Ad
I? R? _ I I
I I, ?
`+ I c--_
5 ? G R. TUR,vA kbUNa
X41 ??
011330
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR
PO BOX 3279, ASHEVILLE, NC 28802
December 10, 2001
Mr. Steve Lund
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
SR 1143, Upper Brush Creek Road
Madison County, NC
Dear Mr. Lund:
SECRETARY
PAYMENT
RE, EiVED
I have enclosed a straight-line diagram with erosion control plan, a PCN application for
NWP #14, and a vicinity map relative to the proposed project on SR 1143, Upper Brush
Creek Road, Madison County, NC.
Upper Brush Creek Road is currently a 12-14 feet wide gravel road. Division of
Highways plans to pave the road 18 feet wide and increase the typical section. Grading
will be light to moderate.
We propose to extend four existing culverts on Brush Creek and UT's. Total culvert
extension will be 40 linear feet. Existing channel morphology will be maintained
upstream and downstream of the culverts. The culverts will be placed below existing
streambed elevation. Riparian vegetation will be reestablished along disturbed areas
associated with the culvert extensions. Stormwater will be diverted through grass-lined
ditches or vegetated buffers prior to entering streams.
No significant effect on federally listed species (threatened or endangered) or their
habitats is anticipated.
By copy of this letter, we request Owen Anderson, North Carolina Wildlife Resources
Commission Mountain Region Coordinator, to comment directly to the Corps concerning
the permit request.
Mr. Steve Lund
Page -2 SR 1143, Madison County
December 10, 2001
By copy of this letter, we are asking Ed Ingle, Area Roadside Environmental Engineer, to
comment on the above project. Temporary encroachment into the buffer zone of the
Brush Creek will be required for the project. The stream is not classified as trout.
By copy of this letter, I am forwarding seven (7) copies of the application package to
Cynthia Van der Wiele, NC DENR, Division of Water Quality, 401/Wetland Unit for
review and comment. A $200.00 check is enclosed for application processing.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6287.
Sincerely,
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: F. D. Martin, P.E.
K. A. Wilson, P.E.
Ron Brazil
Ed Ingle
Owen Anderson
Cynthia Van der Wiele
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No. 01 13 3 0
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
X Section 404 Permit
? Section 10 Permit
X 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: ' NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: NC Doartment of Transportation
Mailing Address: P.O. Box 3279
Asheville NC 28802
Telephone Number: 828-251-6287 Fax Number: 828-251-6394
E-mail Address: rdbryanadot state nc us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1143 Piney Grove Road
2. T.I.P. or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN):
4. Location
County: Madison Nearest Town: Marshall
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): SRI 143 is located between off of
US 25/70 near Marshall Take 25/70 west from Marshall, then turn right onto Upper Brush
Creeek Road at Madison Middle School. Project starts at the end of existing pavement.
5. Site coordinates, if available (UTM or Lat/Long): 35 51'47"N 82 42'20"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Existing secondM road
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): Brush Creek
9. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http•//h2o.enr.state.nc.us/admin/maps/.)
Page 2 of 8
10. Describe the purpose of the proposed work: We propose to grade drain base, pave and
install erosion control measures for SR 1143 (Upper Brush Creek Road). We propose to
extend four existing culverts on Brush Creek and UT's. The culverts will be installed to
insure aquatic life passage within the streams.
11. List the type of equipment to be used to construct the project: Excavator, backhoe, and
trucks.
12. Describe the land use in the vicinity of this project: Rural, homes and wooded.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: No no future plans
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Page 3 of 8
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0.0
Total area of wetland impact proposed: 0.0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
specify)
57+15 Culvert 10 Brush Creek 3 P
64+94 Culvert 10 UT to Brush Creek 1 P
81+36 Culvert 10 UT to Brush Creek 1 P
85+51 Culvert 10 Brush Creek 2 P
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usas.Qov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mal2quest.com, etc.).
Page 4 of 8
Cumulative impacts (linear distance in feet) to all streams on site: 40 feet.
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The existing secondary road must be improved to meet current safety standards for paved
roads The culvert extensions requested are the minimum necessary to establish an appropriate
typical section for the roadway. Riparian vegetation will be established on disturbed areas
associated with the project construction
VIII. Mitigation
Page 5 of 8
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http:/,/h2o.enr.state.nc.us/ncwetlands/stn-ngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http:.'/h-lo.enr.state.nc.us/M/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Page 6 of 8
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes X No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No X
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify. )?
Yes ? No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 teet perpendicular trom near nanK or cnannei; Gone z extenus an
additional 20 feet from the edge of Zone 1.
Page 7 of 8
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The existing compacted gravel roadway acts as an impervious surface. Paving of the roadway
should eliminate sedimentation from fines associated with gravel surface treatment. The
roadway surface will be 40% of right of way acreage. Stormwater will be diverted through
settling basins or grass lined buffers prior to entering the streams.
XII. Sewage Disposal (DWQ Only)
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No X
Is this an after-the-fact permit application?
Yes ? No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
With regard to hazardous Will basins the road is not classified as an arterial route, therefore
hazardous mill basins are not required.
/,;//0/d
(Agent's signature is valid only if an authorization letter from the applicant is provided.
Page 8 of 8
345 42'30' 346 341 (White Rock 191-L K'
f =END PROJECT
A at
?jf
uap
? /? L h I ., 1 Cam( 0
?\•? T
.14040
r ? q i 0 ;
r t ` C _
BEGIN PROJECT 11I
'VI
,..? ? Lam. ,'"? L •',???rr ? .V A ?0 it I (/?, / ?? ?.. ?---. ? ? \ -v ?? ? ?
A- / ? ?? `.?o J ??} 403 ?T
J' ` ?"/?-??4r? ;•? " ? Vii- '??? ? -? ??? ?- - I ' ,/ ? Y ? i %?? - .?? , ?,. ?,.
// o hytt? 2r
ix,
~ ?-7?\ -?_>??000• ?iCId StOt?fJ??
? j I ,oi' ??\ `? ?? _ _. • ; /? ._-. ?? ,? `? J ??- ?? fir/ ? i/.
Vicinity Map: SR 1143, Upper Brush Creek Road, Madison County, NC (Marshall
Quadrangle, Scale 1:24000).
N.C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT: 5R 11 43 UPPER BR05 H CREEK RD.
LOCATION: FROM E.O.-P. 5P,114.3 ^ro E.0, M.
WORK TYPE: G RADE 3ASE 1DRA I N 'PAVE
WORK ORDER: PRIORITY:
COUNTY: MADI 5aN? TOWNSHIP: W AL N u-r
DATE: 1- os -o i SCALE: so'
NOTES: ?-s
7975' = 1.51 MILLS PREPARED BY: ?.? .3.
(it
EROSION CONTROL PLAN SHEET
Silt fences and temporary silt ditches shall be installed after clearing and
before grading.
Temporary stone ditch checks shall be installed as soon as ditch-line is
established.
Pipe outlet and inlet protection will be done as soon as the pipe is installed.
Silt basins (Type B) will be constructed to the dimension of nine feet by
three feet by two feet unless otherwise noted on plans. (See SB-9 on
dimension sheet)
Seeding and other permanent erosion control measures are to be
implemented as soon as practical.
Temporary rock silt checks (Type B) will be spaced as required by percent
of grade.
PIPE INSTALLATION NOTES
1) Install erosion control devices. In streams, where necessary, rock silt
screens will be used.
2) Remove material and existing pipe while limiting, as much as possible,
material and sediment from entering the stream and/or escaping from the
project.
3) Prepare pipe foundation while again taking care to limit, as much as
possible, material and sediment from entering the stream and/or escaping
from the project. Where possible, new grade will be below the existing
streambed. If needed, bedding material will be clean stone.
4) Place the new pipe and compact backfill.
5) Install slope protection on outlet and inlet ends of pipe. Also complete
installation of erosion control measures and perform maintenance as
needed on existing measures.
6) Establish permanent vegetation as soon as possible.
ROADWAY DITCH AND MEDIAN LIKING GuIDEL
IVES
Percent of Grade
Type of Linino- Reco
0 mmended
- S tra-v and Tack
2roson Control Maccino
3
4 Synthecic Roving
5 ----
greater Scone
• VTTT-
12 5'
r
?z
( S.B. 5 )
( S.E
NOT TO SCALE
CHECK EVERY STORM EVENT AND
CLEAN a!f WHEN HALF FULL
6010 CY/aC FEET PER ACRE
LENGTH OF DISTURBED AREA 100'
3, 14.1
2'
(S
?R
I X3
2'
(S
ii
/3'
I
2'
( S.B. 28 )
DESIGN FOR SILT BASIN
3, ??? 7'
2' 1
LENGTH OF DISTURBED AREA 300'
LENGTH OF DISTURBED AREA 200'
"ll
LENGTH OF DISTURBED AREA 400'
EROSION CONTROL
DETAILS AND SPECIFICATIONS
Std. Description
245.03 Temporary Silt Ditch----------------
245.05 Temporary Diversion--------------
893.01 Temporary silt fence-------------
890.05
245.01
245.02
892.04
895.10
892.01
892.02
897.01
symbol
TSD
Temporary Slope Drain with Earth Berm-----
Silt Basin Type A------------------------------
Slit Basin Type B------------------------------
Temporary Rock Silt Check Type A-----------
Temporary Rock Silt Check Type B-----------
Temporary Rock Sediment Dam Type A-------
Temporary Rock Sediment Dam Type B--------
-0
I
Rock Pipe Inlet Protection--------------------
Pipe Outlet Energy Dissopotor---------------- as
M606
894.01
245.04
Rock Silt Screen-------------------------------
Stilling Basin-------------------------------
vl?
Rock Inlet Protection:
896.01
Type A-------=------------------------------- AU
896.02 Type B--------------------------------------- B[3
896.03 Type C--------------------------------------- c13
Erosion Control Matting--------------- ECM
Fiberglass Roving---------------------- FGR
i ?
i
I
I I
ILI
x? ? 9 ,
I
I I
I I
I I
i
I I
I
I
5?/O vs ZS/?o ?1Ht I A; Sf/ l?V/ 914z z
/nA?PSHALG? ?V• C • 2??53 I I ?? 9 SD/
Z?Q - soy I
I I
I
iJ I I
?A S TAR E I I C0671VATioAl
I I
r I I $ ?, s
I I
I I
I I
I I
3 I .
SR l /13 ' UPPER ?.2USf/ go
MA&SO)v CIO
No V. i S Zao i N I I
i?l I -LL
!
Pipe CorE?E?F?W?2p=is?M?) 1010
b I I
s?
- -?-SR /404 //9 UPPFER C4,eck RO• Se
??4?'
v
BRANDY t KAeev R16SBY
* l8/ -Sell
I ?•?? ??! /88 F?16s8Y 3cEnllc. DR.
I I NO 4 A59ALL NC , 28 7S6
30 =IS"' G'?tP
I I
?I'?I
i
I I .
I I
i
I I
I I
I
IPA STU R I I .
C v[.Ti VAr lonl
I I
Zigs2)/ I I Z/9-SD/
I .I
• I I
-L Z
Sal
I i
i i
I i
x i I
? I I
i
46 4-
64 f 12'
? I
I? I •
' ? I oa I
jeAI/o µ/
e 5 / S,RI-/,
Z/ So/ .
I I
? I
?
I ?
? I
1 ?
I I
\ ? I
2 ?
x7 6i
i ?
I I
I i
I (
`' I I
W
I (
I
?d 12 s I
i I
I
I I
1 I
I I
I I
I I
I i
? I; al
I I
I
I
I
I I
1 i
I I
I i
I 1
,r I ? I
I I
I I
( I
I I
I I
I I
I I
I
I o I
q5'
cuGTl VATio Al
/1''L?NN,?TN F BST B/?jGSB
Al c &"VevGNl 6":OP614
'J_ it ptlo-% ?k' SRv IR/-E03
V I; I
I I
I I
I I
I
Lq
wn/ ? W I
? I I
I I
i i
I I
i + I
20=[$ CptpCREP.uv4o•-lg"CMP) I I
I I .
? I?? I
I I
,T41v6s R. Ro6fes I
248- Sog
Iso URFf sello c eegt PD. I I
IW PSIINLL, v. c- Z8 7s-3 z2 s
I I
I
I I
.l I7?o
? I
I i
lo` ? I I
I? I I I
I' 1
` I I
z
e
Z/4 So i
I I
I I
?I I
I
+oo l
CUc.T/yATlo/V
J. D . GoslviL4 ,
137 - 95
/5#161111&E ATTN.
i
75
c
k,E?v?l?rH f BEr7/
AiGS.B?
' I
81tq l 1. £ YkO VNc AN1)6R-12 i? w I
17o7 UpPc? t3PUS?l c?.??
/9yx;11A1-1-1/v-c. 28753 I
FA/lo w
• d I
?
I
i I
I •
I
I I
I .
I I Cccrl T/oN
I i
I
I I 45
I I
I
? I
?i I
1461
I
I I.
? I
PROS 30" i? c?7? I ,L ?unN?=
16 Z'IV
riLl i
c> IC--
,
7
1??IR??L2
Z rH Ck AD i
7gi ,6 s 2. E,es
LQY -soq
• I I
I I
q ?
?, l I l2'u?F• R?. NIGNR'txKMTnti PJ.
I 1 ?d-SNEG. L
zo =.a °c??P I 137- 9-5*
' n 22.5 d7?CC,?/ ?- £ ylyJ?/NE AND,?i?SOn/
109-117
1707 U?P6R 8?'?isrYC?-S'D -
FAGt?w
2o'-?S"CMP?REPw?4o'-!8'c/v J
1 ,,
? I I
W I I
I
?I
Ai
I
I
t I
I I
I I
I I
i ?
I q-7l
I
I
t I
I I
I I
I • I
13 I
? t?9 I
I I
I I
v t I
I
I
Cue-7-1 ,ATiON
®1
I I
i I
I
? I
I I
it
I I •
cr- X
X .?
87o vP?,?? ae?HCk.,PD, I ?
/llIRS?A?C? rv.c, zr1?S3 I I
I I ,
l6 S- 70
z4?-15
cry
,? bl
j
- 90l C?PP 2 B?Cvsfi' C,?E?,PD ,
lO?Soi? D2 .
0 0 M.,9 511411, A//G - L87S3
" ?I I
22
5 I
.
FAC?oin! I
I
I i
(
I
COLT/?ATiO/?
.
I
®l 0
I
I I
I
VA1, 6 s, es
I I
-//7
I
I
1
8-320
If
I
14 I
11
. r -l-
PRoP. 30 =/s'cmp all
i- t?AI
4
/
I
/ I I
C,cgzlvF ' 46'eFW 9
8gD ;',,1e eetlsiya e.,4,.
pAsTVkE
EvGE?? aGGGM:9/??
i?7- Qg8
is g 19x F
I I
! I
I I '
IVMrL.GAM
I I zo =is"crio
? I
I I
AL,
I i ?obl
? I
i
I
? I
I I
X .4 I
? I
I I
I
? I
L '
3 I I
? I I
I I
I?g I
1 I
I I
I
? I
? I
' I
i
I I
I I
I
?x F, 4I
BR. ? 92 ?
f ASwRE
.6 s-7a
22.6 ,
17 I?
I I
I I
I ?
i
I I
?/?I LLoN? ? ?
I I
? I I
I I
DR. 1
I I
? i
I
I
i I
%(
17
C?AUp?F B.C?G?9 BvLG?tA? I
/ s?B -566 I I
I I
I j
I .I
I
Is
I I
I I -?
CUGT/VAT/One
Cm.
I I
I
I I
I I
I I
I I
1
sAI?
AILLoW
19lcr2?,IPQ
X65-70
,45,
/?ASTv.?E
r ISEF
. e
681
11,
BARN
/o'sorL D 1 k Y 9se
F4uzw 11 9E,P1vA,e4>,F s &, er
/gS-7U lq(//2,P,g/
I?
i I
X189
I I:
i II
• I I,
I
az.s' I I '
I
I I?
I FA?lo?it!
i
/4-566
y ? ? I
T 6 t! I
I I? `
I ; l6S -70
I ! 3o=gS''C?fP CF_x7.-
I I
.• I I
.' I
14 81
I I
I I
I I
I
I I. -1- +V7
!7'
I I
I I
I
s I ??
•
°
O
ro
I
I
I
I
I
I
I
I I
I
I
FA4.40 w
&RNARD ? SH LEY /YJURRAY
/65 - 76
51
1
I i
I I
I I
I I
I I
? I I
I I
16 ?
u
I I
I I
I I
I I
I I
I I
I I
I I
I I
? I
I ?
I I
I i
16LI?
I88I?
I I
I
i I
I I
I I
I I a"
? I?x
I I
I I
I I
I I
I I
I i
I I
b81X
f ASTui2E
aRNAR V ltSWPL Y MORA I
/,5-7D
35 =/e Ne Err. s' y
WGR.
Aasrm FAULKNE R I
1750 BvER 8 osm CREEk Rd. I
MAR.SNALL ! NC . 28753 t
CUc nVATro,q
&RNA A D , ' 5 NI,,RL,9Y NluRRq V
/LS-7a
I 1
I
I
I
I
I I
I
• I I
.? I I
5????E/ I I
/ 16 I
69 ?rX
I I
I I
i I
? I
I I
I i
1sT
i
I I
zz_5
I
I i
I I
I -71
I I
i I
I I
Ig
v
I u1
I I
. I L
I I? x
aloft
458N!
?ASru,P?
l3E?lvA??sNlRr?y N1?R,?as?
/ 6 5 - 76 6
rALLoW
AU5T'lN rrAULKNER
82 - 2.84-
I
I
I I.
I
w
•
I i I?
'
I ?
+I6
V?
1 I
I '
'
0
? I
I
I ? II
I
I I
;
I
I
zz.s' !
I
I I
I
I
? I
?
?
4 I
I
)Yob io
SyEO I I
lvnS
7 MI I
N
Fo
zV I
I I
i .
I
18
61
ISFfl I i ,
I
,) I
j
?I I•
Ix ;
, 4-W /-aW
BEA)VARD ? 5HIPLEY MtJRRAY
11 !?-'70
sI
b I
I
• IO 1
I I '
I
X
I ?
I .
I I
I i
I
l t
Am-rs 'rIVAticy VEST
/52- 343
FA4zo w
ALis-F/A1 rAuLAAIER
82-2B4-
4?
I I
I ?
I i
1 I
I I
I I
I I
4 I
to
I? I
I I
I ?II
i I
I
I
'
I ?? I
I
I. t
t
t8o
I
I I
rA,GG 0 W
it
I I -AM16 S NANCY VL-ST
I I X52 - 3q3
'' - 33 E, q s7- TAR i vzE
I /?E"MPl-!l5 TV. 38142
I I
,
i
? I I
U I I
W
? I
i7 I
P F46
I
i I
I I
I I ,
I I
( I
I .
3ERNAZID $SNiQLZ V RLM- -441
1/..,?7 _7n
I t , •
S,oMES NAA -) C?I
X52 - 393
/AGGo w
Q 6 I
I I w.
' I
I i
I
I I
i ,
I I
f?7I
I
I
I
? I I
? I I
w I I
? I
I? 1
i I
I
1
I i
i I
I I
I6?1
I I
I ,
I I
I
I 11
1 -7 91
I I
I I
I I
I I
I I
I I
I ?
.TAMCS eAlAmc r VEST
1s2-343
X fIveow
?Y
?1
4 '?Etp+
I 30'
? I
I ?
tip,
it
?I
t?
I
I?
is
F.9L LO Gtl IALLD Iltl
I'
I
RUTN T.
278-2?2 ? ? 4,U-rN T, 1?v31??
2842 5umsE T DR. 2-79
CuARLCTTE NL .282 I
I ?I
v ? I
W I,
I
sAmES e NAticy i' eS 35'-36'CnIP
152 393
I I, ?
5 I GR, TUR,vA RaUND
p? ?.•z,?9? _.,.__;_ William G. Ross Jr., Secretary
p? G? North Carolina Department of Environment and Natural Resources
r? [ Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
January 10, 2002
DWQ #01-1830
Madison County
CERTIFIED MAIL- RETURN RECIEPT REQUESTED
V
Roger D. Bryan
Division 13 Environmental Officer
NC DOT
PO Box 3279
Asheville, NC 28802
Dear Mr. Bryan:
On December 13 2001, the Division of W:1e- 03a* (D1"dQ) was notified by receipt of your application regarding
your plans to fill streams for the purpose cc i:n= ing SR 1143(Upper Brush Creek Road) in Madison County.
Approval from DWQ is required to impact theme 7=--- P6---c provide seven copies of the following information and
refer to the DWQ number listed above in your ;?iy. The maps do not clearly show whether stream relocation will be
needed from stations 29 to 26 near JD Gospe's' pmperty, a_ stations 59 to 57,. stations 69 to 81 (along the Bernard
and Shirley Murray property) and sons 86 D 82, dorm Ruth Dublel's property. Please show these on maps of
suitable'scale (for instance 1° = 100 met) so tie ca-, begin b determine your projects compliance with 15A NCAC
2H.500.
Please call Cynthia Van Der Wiele ad 733-1788 if you have any questions or would require
copies of our rules or procedural r -semi -7s prcjer--;- will remain on hold as incomplete in accordance
with 15 A NCAN 2H .0505 (c). Try proi-r J7ne ;rr, this application will begin when this information is
received, If-we do not hear from you vrii n ire (3) weeks of the receipt,of this.. Letter, we will assume
that you no longer want to pursue this prtarad w1111 consider it withdrawn.
arcerety yours,
Cc Asheville DWQ Regional Office
Asheville Corps of Engineers
Central Files
File Copy
Wetlands/401 Unit 1650 Mail Service Center Rake ;r,,. J C 276G946ZO Ph: (919) 733-7015 Fax. (919) 733-6893
18?
Customer Service
1 800 623-7748
Michael F. Easley
Governor
r
goo. William G. Ross,Jr.Secretary
- N Department of Environment and Natural Resources
Kerr T. Stevens
Division of WaterQuali
C4dR?
r " 0Y\ County
00
Dear Mr. CVYI
C-3r
On the Divisi of Water Quality (DWZasnofified by receipt of your
applications regarding your plan to fill s for the purpose of s d"
County. Approval from DWQ is required to disturb these +< Please provide seven copies
of the following information and refer to the DWQ # listed above in your reply fn-partictiiaras-descrtbed in
1 , we re ty. Please show
these on maps of suitable scale (for instance V = 100 feet) so we can be n to determine your projects'
compliance With 15A NCAC 2H .0500.
Please call at (919) 733-1786 if you have any questions or wo d require copies of our rules or
procedural materials This project will remain on hold as incomplete in cordance with 15A NCAC 2H
.0505(c). The proc sing time for this application will begin when this info ation is received. If we do not
hear from you by riling within three (3) weeks we will assume you no long r want to pursue. the project and
will consider it wi drawn.
Sincerely,
G- VaJY\
John R. Dorney
Cc:DWQRegional Ofnce -?1-_- -
File Copy
Central Files
y„ .x. U.! ' <r- -cam.{r
Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650
Wetlandsl401 Unit (919) 733-1786
Fax (919) 733-6893
H C)
0 0
0 0 0
CN o
\ Q N
W '
O
\ z
N
LU -
i
Z
O
H
Q
mil
oo
?a
Z?
cc z
O
0
U 'n
N
.0
d
O
zw
LL
W
Q N
?
IL
w
0
U
Z
W
F ?
O
d
A O
N
W \
ko
O O
1-1
N
H
O
w
O
? a
. w
O
Z
z
M
~
z U ?
q O rl
Q