Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20180755 Ver 2_Final_Wetland Impact Summary Sheet - cofferdam revision_20200827
Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) SITE #1 -L- 16+19.00/17+79.00 1 @ 50', 1@60', 1 @ 50', -21"/ 24" Cored Slab Bridge 0.16 SITE #2 -L- 14+30/16+00 Roadway Fill 0.02 0.03 -L- 15+00/15+60 Sewer Relocation < 0.01 0.01 -L- 14+30/14+92 CenturyLink Relocation < 0.01 SITE #3 -L- 17+80/19+00 Roadway Fill 0.01 0.03 -L- 18+64/19+15 CenturyLink Relocation 0.01 TOTALS*:0.03 0.03 0.07 0.16 *Rounded totals are sum of actual impacts NOTES: Revised 2013 10 24 SHEET 6 OF 6 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 8/26/2020 PERQUIMANS COUNTY 45561.1.1 (B-5606)