Loading...
HomeMy WebLinkAboutNCC203481_ESC Approval Submitted_20200825THECITYOF ASHEVILLE Stuart Zitin 139 Third St Asheville, NC 28803 (828) 230-1424 RE: Project Name: Zitin Subdivision Address: 139 Third St City: Asheville County: Buncombe Date Received: 2-19-20 River Basin:Swannanca Dear Mr. Zitin and Mr. Lovoy LETTER OF APPROVAL 5-15-2020 City of Asheville Development Services Department Site Engineering Division P.O Box 7148 Asheville, NC 28802 Phone:B28-259-5670 www.ashevillenc.gov Permit Number: 20-01251 PZ PIN: 9658-11-6376 & 9658-11-6620 CiviclD: 15115 & 279374 Acres Approved: 2.54 Plan Type: Electronic River Classification: C The Development Services Department Site Engineering Division has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire one (1) year from the date of approval, as required by the City of Asheville Unified Development Ordinance Section 7-12-2(c)(2)f. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas(o-)ncdenr.gov or Paul Clark at Paul. clark(aDncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. A pre -construction meeting is required to be scheduled with the City of Asheville, at which your permits will be issued. Please bring a copy of the NCDEQ Certificate of Coverage and shop drawings to the pre -construction meeting. Contact Nancy watford at NWatford(a-)ashevillenc.gov to schedule your pre -construction meeting. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. 1