HomeMy WebLinkAboutNCC203481_ESC Approval Submitted_20200825THECITYOF
ASHEVILLE
Stuart Zitin
139 Third St
Asheville, NC 28803
(828) 230-1424
RE: Project Name: Zitin Subdivision
Address: 139 Third St
City: Asheville
County: Buncombe
Date Received: 2-19-20
River Basin:Swannanca
Dear Mr. Zitin and Mr. Lovoy
LETTER OF APPROVAL
5-15-2020
City of Asheville
Development Services Department
Site Engineering Division
P.O Box 7148
Asheville, NC 28802
Phone:B28-259-5670
www.ashevillenc.gov
Permit Number: 20-01251 PZ
PIN: 9658-11-6376 & 9658-11-6620
CiviclD: 15115 & 279374
Acres Approved: 2.54
Plan Type: Electronic
River Classification: C
The Development Services Department Site Engineering Division has reviewed the subject erosion and
sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval.
This plan shall expire one (1) year from the date of approval, as required by the City of Asheville Unified
Development Ordinance Section 7-12-2(c)(2)f.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette. lucas(o-)ncdenr.gov or Paul Clark at Paul. clark(aDncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will
be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
A pre -construction meeting is required to be scheduled with the City of Asheville, at which your permits
will be issued. Please bring a copy of the NCDEQ Certificate of Coverage and shop drawings to the
pre -construction meeting. Contact Nancy watford at NWatford(a-)ashevillenc.gov to schedule your
pre -construction meeting.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.