Loading...
HomeMy WebLinkAboutNCC203645_ESC Approval Submitted_20200824ROY COOPER l NORTH MINA August 4, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Pine Gate Renewables, LLC ATTN: Chris Dunbar, CCO 130 Roberts St. Asheville, NC 28801 RE: Project Name: SOUTHWICK SOLAR, LLC Acres Approved: 28.16 Project ID: ALAMA-2020-045 County: Alamance City: Graham Address: Boy Wood Rd. River Basin: Cape Fear Stream Classification: WS-V ; NSW - Jordan Lake Watershed Submitted By: Civil Design Concepts, PA Date Received by LQS: July 27, 2020 Plan Type: Revised Dear Mr. Dunbar: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications . and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North c;MElna Depar'twlt of.Envi=mental Qlaft [ DMsimafEmWMhwaLandLandResowCeS VWmtwSatemRe&m40f we 4SOWestWhstorr5alern NwrtttCeralina27105 536 TTta480(T Letter of Approval Pine Gate Renewables, LLC August 4, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: SOUTHWICK SOLAR, LLC Project ID: ALAMA-2020-045 County: Alamance Modifications pursuant to applicable North Carolina General Statutes and f or Regulations: 1. Approval by a representative of the Land Quality Section will be required prior to removal of the sediment basins. [15A NCAC 4B .0106(a)(5)] 2. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: 1. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 413.0110] 2. Be advised the 7/14-day soil stabilization requirements apply to any section of the project where land -disturbing activities have temporarily or permanently ceased and shall supersede any less stringent stabilization requirement on the plans. [G.S.143-215.1] Ref: G.S. 113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities