Loading...
HomeMy WebLinkAboutNCS000335_SJAFB MS4 Audit Correspondence_202008191 Powell, Jeanette From:Powell, Jeanette Sent:Wednesday, August 19, 2020 10:31 AM To:D'AGOSTINO, JEFFREY M GS-13 USAF ACC 4 CES/CEIE Cc:FUSSELL, JODI M GS-13 USAF ACC 4 CES/CEI; Lucas, Annette Subject:RE: [Non-DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting Attachments:NCS000290_Camp Lejeune MS4 Audit Agenda_20200924.pdf Good morning, Jeff.  Please accept my sincere apologies for the delayed response to your inquiry.  I have been out of the  office for a family medical emergency, but am back in the office now and getting caught up.    Do you have a preference for either October 20‐21 or October 28‐29 for the audit?  I have attached the Camp Lejeune  audit agenda as an example of the 2‐day schedule, which should be the same for the SJAFB audit.  The first day is  interviews, and the second day is field inspections of industrial facilities and outfalls.      DEQ usually takes photographs during site visits, but it is expected that there will be security issues on base.  We can  approach this by either (1) obtaining approval for DEQ to take pictures, or (2) SJAFB staff take the pictures under  direction of DEQ staff and maintain them on file as required permit documentation.  Under option 2, a photo log would  be generated and included in the audit report, but not the actual photos.    Picking up DEQ staff at the Berkeley Gate and providing escort is acceptable.    DEQ is currently evaluating all of the non‐traditional MS4s that have/want to include industrial facilities in the next  permit iteration.  We can schedule a meeting to discuss this topic in September if you would like to.    DEQ is cognizant of fiscal year budgets, and will remain respectful of commitments that cannot be changed.  Under the  standard timeline for an audit, the Draft SWMP is required to be submitted 120 days following receipt of the audit  notice.  For SJAFB, this would likely require Draft SWMP submittal in May‐June 2021 and the new permit would be  effective January 1, 2022.  However, please note that the standard audit timeline and permit effective date was  developed to work with the state fiscal year of July 1 ‐ June 30.  DEQ is open to basing DOD MS4 permits on the federal  fiscal year of October 1 ‐ September 30, if appropriate.  That would make the new permit effective date either October  1, 2021 or April 1, 2022, with a standard annual reporting period of October 1 ‐ September 30.    A DOD‐relevant Draft SWMP template will be made available this fall.  It will be similar to the current Draft SWMP  template posted on the DEQ web page, but will be specific to the DOD MS4 permit requirements.      If you have any further questions, or would like to schedule a meeting in September, please let me know.    Thanks and have a great day,  J  Jeanette Powell  MS4 Program Coordinator    Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality  Phone:  (919) 707‐3620  Email:    Jeanette.Powell@ncdenr.gov   Physical Address:   512 North Salisbury Street Mailing Address:     1612 Mail Service Center                                     Raleigh, NC 27699‐1612    2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed  to third parties     https://deq.nc.gov/sw    ‐‐‐‐‐Original Message‐‐‐‐‐  From: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE [mailto:jeffrey.dagostino.1@us.af.mil]  Sent: Wednesday, August 12, 2020 12:37 PM  To: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>  Cc: FUSSELL, JODI M GS‐13 USAF ACC 4 CES/CEI <jodi.fussell.1@us.af.mil>  Subject: RE: [Non‐DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting    CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>      Good Morning,    I am following up with a missed call regarding our upcoming audit in October. Some questions/logistics that needs to be  addressed prior to the audit  listed as follows:    *       A specific timeline (Dates and times) of the your visit. We have the capability to pick up  your group, to be escorted  on base at the Berkeley gate but you will still require IDs. If you plan on driving on base  ‐ that will require more security  measures. If photos need to be taken, further authorizations will         be required.    *       The current NPDES Permit NCS000335 has a combination of Industrial and MS4 permit requirements. Need to  determine if we will have one permit or two (MS4 and Industrial). USAF Budgetary timelines and a possible extension for  completion will come into play , depending on permit remaining          combined or separate. SJAFB/DOD budget   schedule coincides with the expiration of the NPDES Permit ‐ April 2021. Will the state require a new plan in the states  template format by October? An extension will be required as DOD budget timeline cannot be altered.  We have plan  update project       that will be awarded April 1, 2021. DOD cannot change the budget process.    *       Can you provide an example plan that would fit a military base, similar scenario for SJAFB.    Both myself and Mr. Ronnie Wilson are available to discuss these topics , and look forward to resolving them prior to  October.    I reached out to your immediate supervisor today , Ms. Annette Lucas,  to ascertain your status as  a preemptive matter  to avoid any further delays as this process moves forward .    Thank You,    Jeff D'Agostino GS‐13 Chief, Environmental Element 4th CES/CEIE Seymour Johnson AFB  DSN: 722‐5102  COMM: (919) 722‐5102    ‐‐‐‐‐Original Message‐‐‐‐‐  From: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>  Sent: Tuesday, July 14, 2020 3:07 PM  To: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE <jeffrey.dagostino.1@us.af.mil>  Cc: WILSON, RONNIE E GS‐12 USAF ACC 4 CES/CEIEC <ronnie.wilson@us.af.mil>  Subject: RE: [Non‐DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting  3   Under the 2018 joint compliance initiative agreement with EPA, DEQs audit process has been standardized.   For an MS4  the size of SJAFB, it typically takes 2 days.  The first full day is in the office reviewing program administration and  documentation; the second day is field inspections and a closeout meeting where preliminary findings are presented.    J  Jeanette Powell, CPSWQ, CPESC  MS4 Program Coordinator  919‐707‐3620  Jeanette.Powell@ncdenr.gov    North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program  512 N. Salisbury Street, 6th Floor  1612 Mail Service Center  Raleigh, NC 27699‐1612      Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed  to third parties.    https://deq.nc.gov/sw    ‐‐‐‐‐Original Message‐‐‐‐‐  From: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE [mailto:jeffrey.dagostino.1@us.af.mil]  Sent: Tuesday, July 14, 2020 2:50 PM  To: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>  Cc: WILSON, RONNIE E GS‐12 USAF ACC 4 CES/CEIEC <ronnie.wilson@us.af.mil>  Subject: RE: [Non‐DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting    CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>      ALCON,    I don't have any issues at this time for the October timeframe, please provide  agenda/reason for necessity of two day  for the audit, historically , one day has been sufficient.    Coordination with Ops, CE,  and PA is necessary for this and might be impacted by mission requirements, thereby having  one day vs two days    Thank you,    Jeff D'Agostino GS‐13 Chief, Environmental Element 4th CES/CEIE Seymour Johnson AFB  DSN: 722‐5102  COMM: (919) 722‐5102    ‐‐‐‐‐Original Message‐‐‐‐‐  From: WILSON, RONNIE E GS‐12 USAF ACC 4 CES/CEIEC <ronnie.wilson@us.af.mil>  Sent: Tuesday, July 14, 2020 12:10 PM  To: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE <jeffrey.dagostino.1@us.af.mil>  Subject: FW: [Non‐DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting  4   Do you have preference for Audit dates?    ‐‐‐‐‐Original Message‐‐‐‐‐  From: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>  Sent: Tuesday, July 14, 2020 11:38 AM  To: WILSON, RONNIE E GS‐12 USAF ACC 4 CES/CEIEC <ronnie.wilson@us.af.mil>  Cc: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE <jeffrey.dagostino.1@us.af.mil>  Subject: [Non‐DoD Source] RE: [External] RE: Friendly Reminder: MS4 Annual Reporting    Hi Ronnie,    It is business as usual for the Seymour Johnson AFB annual report.    DEQ will be performing a permit compliance audit in October, which will be the start of the permit renewal process.   Following the audit, DEQ will issue a notice with specific requirements for permit renewal.  That will include submittal of  a Draft SWMP, and the template is available on the MS4 web page in the Phase II MS4 Toolbox.  If the new permit is not  issued prior to expiration, then the current permit requirements will remain in effect until the new permit is issued.    Do you have a preference for the audit dates?  I would like to schedule two consecutive days.    Thanks,  J  Jeanette Powell, CPSWQ, CPESC  MS4 Program Coordinator  919‐707‐3620  Jeanette.Powell@ncdenr.gov    North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program  512 N. Salisbury Street, 6th Floor  1612 Mail Service Center  Raleigh, NC 27699‐1612      Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed  to third parties.    https://deq.nc.gov/sw    ‐‐‐‐‐Original Message‐‐‐‐‐  From: WILSON, RONNIE E GS‐12 USAF ACC 4 CES/CEIEC [mailto:ronnie.wilson@us.af.mil]  Sent: Tuesday, July 14, 2020 10:08 AM  To: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>  Cc: D'AGOSTINO, JEFFREY M GS‐13 USAF ACC 4 CES/CEIE <jeffrey.dagostino.1@us.af.mil>  Subject: [External] RE: Friendly Reminder: MS4 Annual Reporting    CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>