Loading...
HomeMy WebLinkAboutNCS000573_Belews Mod Approval Letter_20200820ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Mr. Reginald D. Anderson General Manager III Belews Creek Steam Station 3195 Pine Hall Road Belews Creek, NC 27009 Dear Mr. Anderson: NORTH CAROLINA Environmental Quality August 20, 2020 Subject: NPDES Stormwater Permit Permit No. NCS000573 Minor Modification Belews Creek Steam Station Stokes County The Division of Energy, Mineral, and Land Resources' Stormwater Program received your request to revise permit no. NCS000573 on January 29, 2020. The Division has reviewed and approved your request to add Stormwater Outfall SW030, an outlet from Drainage Area 30 that receives runoff from various access roads, a portion of the capped structural fill area, and CCP Office Trailer Complex area, to this NPDES Stormwater Permit. The addition of SW030 has been approved as a minor modification to the NPDES permit NCS000573 because Drainage Area 30 contains access roads, and structures that are similar to outfall drainage areas which are already included in this permit. This modification includes the following changes from your current permit: • Modifications to the permit in Part II on page 7 of 20, to include Outfall SW030 in monitoring requirements. • Revisions to the permit cover page to reflect the latest amendment date. Please replace these pages in the current permit with the revised pages and discard the older pages. All other conditions and schedules in the previous permit remain in place and in effect. E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ 512 North Salisbury Street 1 1612 Mail Service Center Raleigh, North Carolina 27699-1612 NORTH CAAOLINA 919.707.9200 If any parts, measurement frequencies, or sampling requirements in this modification are unacceptable to you, then you have the right to file a petition for a contested case with the Office of Administrative Hearings within (30) days following the receipt of the letter. This petition must conform to the requirements of Chapter 1SOB of the North Carolina General Statutes. Petitions must be timely filed with the Office of Administrative Hearings, Post Office Drawer 11666, Raleigh, North Carolina 27604. If you do not file a petition within the required time, the agency decision shall be final and binding. If you have and questions or comments concerning this correspondence, contact Matt Gwinn at (919) 707-3648 or at matt.gwinnOncdenr.gov. Sincerely, , !� for Brian Wrenn, Director Division of Energy, Mineral, and Land Resources cc: Winston-Salem Office, DEMLR Stormwater Program Sam Sampath, US EPA (via email) Joyce Dishmon, Duke Energy (via email) Stormwater Program Enclosure STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Carolina, LLC is hereby authorized to discharge stormwater from a facility located at Belews Creek Steam Station 3195 Pine Hall Road Belews Creek, NC Stokes County to receiving waters designated as West Belews Creek/Belews Lake, class C waters in the Roanoke River River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV hereof. This permit shall become effective February 13, 2017. This permit and the authorization to discharge shall expire at midnight on January 31, 2022. Originally issued the 13th day of February 2017, amended and signed this 20th day of August 2020. for Brian Wrenn, Director Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission Permit No. NCS000573 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (ROS) has been granted. The permittee may petition the Director for ROS using DEMLR's ROS Request Form. DEMLR may grant ROS if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where the analytical sampling requirements apply and will be documented in a letter to the permittee. A copy of the Division's letter granting ROS shall be kept on site. 4 For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. The permittee's application reports that non -contact cooling water discharges through outfall SWO02 along with stormwater from the retired smokestacks area in the northern portion of the plant yard. The application reports that the permittee will submit an amended wastewater permit application to seek authorization for the combined flows under current wastewater permit NC0024406. The following shall be monitored during a measurable storm event discharging from the areas along the regular ash haul route to the Craig Road Landfill: including the powerhouse building, the old warehouse areas, and the area between the gypsum stacker and the FGD Landfill area via outfalls SW003, SW004, SW005, SW006, and SW009. Drainage Area 30 (DA 30) shall be monitored during a measurable storm event via SW030. DA 30 includes access roads, a portion of the structural fill area, and the CCP Office Trailer Complex area. Table 2 Analytical Monitoring Requirements for SWO03, SWO04, SWO05, SWO06, SWO09, and SW030 Discharge - Characteristics Units Measurement Fre "uenc' 1 Sample Type2 Sample Location3 pCg1 µ L semi-annual Grab SDO Total Suspended Solids (TSS) m L semi-annual Grab SDO H standard semi-annual Grab SDO Non -Polar Oil & Grease by EPA Method 1664 SGT-HEM mg/L semi-annual Grab SDO 40 CFR Part 423 Appendix A: Additional Priority Pollutant Metals Ag, As, Be, Cd, Cr, Cu, H , Ni, Pb, Sb, Se, Tl, Zn5 mg/L semi-annual Grab SDO Boron m L semi-annual Grab SDO Total Rainfa114 inches semi-annual Rain Gauge - Footnotes: 1 Measurement Frequency: Twice per year (unless other provisions of this permit prompt monthly sampling) during a measureable storm event, until either another permit is issued for this facility or until this permit is revoked or rescinded. If the facility is monitoring monthly because of Tier Two or Three response actions under the previous permit, the facility shall continue a monthly monitoring and reporting schedule in Tier Two, or Tier Three status until relieved by the provisions of this permit or the Division. Part II Page 7 of 20