HomeMy WebLinkAbout20160847 Ver 2_SAW-2016-02451 Final As-Built Monitoring Report_20200728Strickland, Bev
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Tuesday, July 28, 2020 3:11 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV
USARMY CESAW (USA); Davis, Erin B; Bowers, Todd; Wilson, Travis W.
Subject: [External] SAW-2016-02451 / Environmental Banc & Exchange, LLC / RES Cape Fear
02 / Cloud and Banner Mitigation Project Final As -Built Monitoring Report
Attachments: Cloud & Banner Credit Modification Request.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Good afternoon,
I wanted to go ahead and start the clock for this one as well to simplify timing/logistics on my end. Please
note, the virtual site visit is scheduled for this Friday at 1pm.
The below referenced FINAL As -Built Monitoring Report review has been requested by Environmental Banc &
Exchange, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review
process, which requires an IRT review period of 15 calendar days from this email notification. Please provide
any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please
indicate if your concerns are great enough that you intend to request an ADDITIONAL site visit prior to the as -
built release. Comments provided after the 15-day comment deadline (shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to Environmental Banc &
Exchange, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this Final As -Built
and as -built implementation credit release.
Sponsor: Environmental Banc & Exchange, LLC
Name:
RES Cape Fear 02 / Cloud and Banner Mitigation Project
USACE ID:
SAW-2016-02451
River Basin:
Cape Fear
HUC:
03030002
County:
Alamance
The As -Built Implementation Credit Release for the Cloud and Banner Mitigation Project would entail 15-
percent of the total stream restoration and enhancement credits: 629.26 stream mitigation units and 1.08
riparian wetland credits.
*Please Note: Final As -Built assets differ from the Approved Final Mitigation Plan assets. With this review,
Environmental Banc & Exchange, LLC is requesting that the As -Built Assets be approved by the IRT. I've
attached the credit modification request for your review.
Approved Final Mit Plan: 4160 SMUs / As -Built assets: 4238 SMUs.
15-Day Comment Start Date: July 28, 2020 15-Day Comment Deadline: August 12, 2020 45-Day Credit Release
Approval Deadline: August 12, 2020
Link to Cloud and Banner As -Built drawings are on RIBITs, under Monitoring Reports:
https:Hurldefense.com/v3/_https://ribits.ops.usace.army.mil/ords/f?p=107:278:8467145541213::NO:RP,27
8:P278_BANK_ID:4626_;!!HYmSToo!I59ZkdPNr7EXErzAd2iODcO5K2OkUSGBMkSMVT9J6UibDsNf8z83VyKuB
UQ5no03a7g$
Please ensure you are logged into RIBITS before trying to view the link.
Please do not hesitate to contact me with any questions.
Best Regards,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil
fires
July 24, 2020
Samantha Dailey
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
3600 Glenwood Avenue. Suite 100
Raleigh, NC 27612
Corporate Headquarters
6575 West Loop South, Suite 300
Bellaire, TX 77401
Main: 713.520.5400
RE: Cloud & Banner Credit Modification Request Monitoring Report (SAW-2016-02451)
Dear Ms. Dailey,
RES would like to submit a request to modify the credits calculated on the Cloud and Banner
Mitigation Project because there was a significant design change that caused the total credit
yield to increase on -site. RES calculated the effect of this change during preparation of the As -
Built Baseline Monitoring Report, and we wish to present this information here in support of a
modification. The Mitigation Plan and As -Built Credits are shown in Table 1.
Table 1. Summary of Mitigation Plan versus As -Built Credits
The Cloud and Banner Project Mitigation Credits
Summary of Mitigation Credits
Stream
Riparian Wetland
Non -Riparian Wetland
Mitigation Plan
4,160
8.20
N/A
As -Built
4,238
8.20
N/A
The design change occurred on UT2-C, which is located in the northwest portion of the project
area, directly above its confluence with Back Creek. During permitting and design, RES had
designed UT2-C to tie into a channel along the property boundary with an adjacent landowner,
which would have required minor grading/land disturbance impacts on their property. The
adjacent property owner was in support of the original design, and both parties reached a verbal
agreement for a temporary construction easement. Unfortunately, the written agreement was
never completed due to unforeseen concerns from the adjacent property owner. The need for
the change arose due to this failed negotiation to establish a temporary construction easement.
Fortunately, RES was able to revise the design to eliminate the need for a temporary
construction easement by realigning the stream to meet Back Creek without the need for
grading on the adjacent property owner's parcel. In doing so, this change increased the length
of the UT2-C alignment within the easement by 84 linear feet as well as eliminated an impact to
Wetland F, preserving 0.02 acre of wetlands. Figure 1 presents a visual to summarize the
change from design to as -built.
Figure 1. Showing proposed UT2-C in yellow and as -built condition in blue.
Overall, the net difference in stream lengths between mitigation plan and as -built was an increase
of 71 linear feet. After running the Non -Standard Buffer Width Tool on the as -built, the total project
stream credits increased by 78. Project wetland credits remained the same as proposed in the
mitigation plan: 8.20 WMUs. RES herby requests a modification to use the as -built credit yield for
this site instead of Mitigation Plan credits as the changes were due to design considerations and
not a result of construction or survey inconsistencies.
To support your review of our request, we have included Sheet S5 of the as -built red -line which
documents the Mitigation Plan and As -Built alignments of UT2-C. If we can provide any additional
information to support your review, please let me know. I am available at 410-279-5741 or by
email at kwebber(cb-res.us. I appreciate your consideration of our request and look forward to
speaking with you soon.
Thank you,
Katie Webber, CPSS
Project Manager
Attachment
Sheet 5 of As -Built Red -line
555
550
545
540
535
i
N
5,33E
\S3R
qT.4 • 14+09.14
REA UT2-C
ORATION
5+92.31 - 14+09.14
DE51GN ALIGNMENT SHIFTED
AWAY FROM ADJACENT
PROPERTY AFTER FINAL
MITIGATION APPROVAL
PROPOSED
TOP OF BANK
PPIOP05ED
BED
AS -BUILT RIGHT
TOP OF BANK
A5-13UILT LEFT
TOP OF BANK
RT
A5-13UILT BED
1 0+50
I I fiVV I I fiDV I GtVV I Gt3V I .�tVV
SCALE: HOR 1 "=30'; VERT 1 "=3'
I.�t3V
555
550
-540
7)
535
1 4+00
DE51GN PROFILE/TOP OF
BANK NOT SHOWN. SEE
PLAN VIEW COMMENT
LEGEND
FROF05ED CONTOUR MAJOR
PROPOSED CONTOUR MINOR
EX15TING TOP OF BANK
EX15TING WETLAND
PROPOSED CENTERLINE OF
CHANNEL
FROF05ED TOP OF BANK
PROPOSED DIFFUSE
FLOW STRUCTURE
PROPOSED BRU511TOE
PROPOSED DOUBLE
LOG DROP
PROPOSED LOG TOE
PROTECTION
PROPOSED LOG 51LL
PROPOSED LOG VANE
— —
PROPOSED LOG J-HOOK
PROPOSED RIFFLE
GRADE CONTROL
PROPOSED LOG JAM
A5-BUILT TOP OF DANK
— — — — TB
A5-BUILT CENTERLINE
A5-BUILT CR055-5ECTION
A5-13UILT STAGE RECORDER O
A5-13UILT FLOW GAUGE
A5-BUILT VEGETATION
MONITORING PLOT
A5-13UILT BRUSH TOE
A5-BUILT LOG STRUCTURE
LIMITS OF CONSERVATION
EA5EM ENT
A5-BUILT WETLAND
NOTE: ALL 51GNIFICANT CHANGES FROM
THE DE51GN ARE SHOWN IN RED
pres
3600 Glenwood Ave, Suite 100
Raleigh, INC 27612
Main:
919.829.9909
www.res.us
Engineering Services Provided By:
Angler
Environmental, LLC
License: F-1428
SEAL
FULL SCALE: 1 "= 30
0
30 60
2"
= FULL SCALE
1 "
= HALF SCALE I`
w
Q o
N
O
N
O N
J N
CL
CD
z_
oC Q
O
LL
z
0
O
cwi� IY
U)
Q O
-j U
j
W
cr
C/)
Q
z_
z
J
O
Q
Q
U
�
�
�
U
N
U
�
�
W
U
w
Q
z
O
Q
U
m
w
w C'5
U
w
z
Q
w O
Q
z
J
J
�
0 U
Q
<
I
o
PROJECT NUMBER:
----
PROJECT MANAGER:
KAW
DESIGNED:
WKD
DRAWN:
TRS
CHECKED:
BRC
SHEET NUMBER:
S5