Loading...
HomeMy WebLinkAbout20011684 Ver 1_Complete File_20011207w H / micnaei r-. casiey, uovernor `O?? 9pG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources r Gregory J. Thorpe, Ph.D. > Acting Director p r Division of Water Quality December 21, 2001 Rockingham County DWQ Project No. 011684 Replacement of one line of 72-inch CMP under SR 1975 (Owl Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. S.L. Hall, District Engineer NCDOT District 2, Division 7 1584 Yanceyville Street Greensboro, NC 27415 Dear Mr. Hall: You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 40 linear feet and temporarily impact 40 linear feet of Machine Creek in order to replace a pipe under SR 1975 (Owl Road) in Rockingham County. The project should be constructed in accordance with your application dated October 2, 2001. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3289 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us, in writing, and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if stream impacts exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. All pipes required for this project shall be installed in such a manner that the original stream profiles are not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of pipe extensions. The pipe shall be installed one foot below the stream to allow for fish and other aquatic movement. If the existing pipe is perched, then it shall be taken out and installed to allow for passage of aquatic life. 2. All work shall be performed during low flow conditions. 3. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If necessary, rip-rap must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. 4. Rock silt screens at culvert outlets shall be removed at project completion. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919-733-9646 or Ms. Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600. Sincerely, Attachment Eli y J. TAe e, e.D Director Pc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office NCDWQ Winston-Salem Regional Office Central Files File Copy State of North Carolina Department of Environment and Natural Resources • Division of Water Quality !Z ASO=" } Michael Easly., Governor Bill Ross, Secretary NCDENR NORTH CAROLINA DEPARTMENT OF Gregory Thorpe, Director ,7 ENVIRONMENT AND NATURAL RESOURCES November 16, 2001 John Hunsinger NCDOT - Division 7 PO Box 2513 Reidsville, NC 27323-2513 Dear Mr. Hunsinger: DWQ # 011684 The enclosed check (#11250 for $200) was received by DWQ on November 16, 2001 for ?(i • a 401 application processing fee for the SR 1975 project in Rockingham County. However the check was not signed. Please have the check signed by the appropriate person and sent back to us (attn: Robert Ridings on the envelope) so that we may deposit it and begin reviewing your application. Until then your project will be put on hold. Thank yert? Robert Ridings, Environmental Technician CC: File Copy ?NAME R*NR s.. Wetlandst401 Unit 2321 Crabtree Blvd, Suite 250 Raleigh, North Carolina 27604 Telephone 919-733-1786 FAX # 733-6893 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael Easly., Governor Bill Ross, Secretary Gregory Thorpe, Director John Hunsinger NCDOT - Division 7 PO Box 2513 Reidsville, NC 27323-2513 Dear Mr. Hunsinger: / • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 16, 2001 DWQ # 011684 The enclosed check (#11250 for $200) was received by DWQ on November 16, 2001 for a 401 application processing fee for the SR 1975 project in Rockingham County. However the check was not signed. Please have the check signed by the appropriate person and sent back to us (attn: Robert Ridings on the envelope) so that we may deposit it and begin reviewing your application. Until then your project will be put on hold. Thank Than Robert Ridings, Environmental Technician CC: File Copy Wetlands/401 Unit 2321 Crabtree Blvd, Suite 250 Raleigh, North Carolina 27604 Telephone 919-733-1786 FAX # 733-6893 An Equal Opportunity Afrumative Action Employer 50% recycled/10% post consumer paper t • ISSUED FILE COPY 011664 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY October 2, 2001 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 tV 1 6 20x1 ATTN: Ms. Cynthia Van Der Wiele Wetlands/401 Unit Dear Ms. Van Der Wiele: SUBJECT: Rockingham County, Extension of a 72-inch Corrugated Metal Pipe under Owl Road (SR 1975) Please find seven (7) copies a Pre-Construction Notification Application package for the aforementioned activity. If you have any questions or need any additional information, please contact John Hunsinger at (336) 634-5644 or Len Smith at (336) 375-5589. Thank you for your time and assistance. Sincerely, J ?? John Hunsmger District Engineer attachments cc: Mrs. Jean Manuele, USACE Mr. Lenwood Smith, II, NCDOT PA v^l`'T R'ECE, [o P.O. Box 2513, Reidsville, N.C. 27323-2513 Telephone No. (336) 634-5644 Fax No. (336) 634-5656 G.AAR. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 LYNDO TIPPETT GOVERNOR SECRETARY October 2, 2001 U.S. Army Corps of Engineers Regulatory Field Office 6508 Falls of the Neuse Road, Suite 105 Raleigh, North Carolina 27615 ATTN: Mrs. Jean Manuele NCDOT Coordinator Dear Mrs. Manuele: SUBJECT: Rockingham County, Replacement of one line of 72-inch Corrugated Metal Pipe under Owl Road (SR 1975). The North Carolina Department of Transportation (NCDOT) proposes to extend one line of 36-feet long 72-inch Corrugated Metal Pipe by 20-feet (10-feet on each side). This activity, located within the Roanoke River Basin, is being conducted as part of a project to upgrade SR 1975 from an unpaved to a paved secondary road to reduce future maintenance needs, bring the road up to current construction standards, and increase traffic safety. Total project length is 0.30 miles. Permanent impacts will result from the placement of fill in 20 linear feet of channel. Rip-rap energy dissipaters being placed above the ordinary high water mark will impact 20 linear feet of stream bank. Temporary travel lane realignment (to prevent closure of the dead end road); and the placement of sand bags, cofferdams, or sheet piles during the dewatering operation will result in a total of 40 linear feet of temporary impacts. Following completion of the pipe replacement activity, all dewatering structures will be entirely removed and natural stream contours will be restored and seeded. Required mitigation is not anticipated, as the impacts do not exceed 150 feet. The project is not located in a High Quality Water. No Threatened or Endangered species were observed during field surveys conducted by Len Smith and Tim Savidge for species known to occur in Rockingham County. Records from the NCDOT Historic Architect indicate compliance with the National Historic Preservation Act. Secondary impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters, restrictions against the staging of ^equipment in or adjacent to waters of the US, and coordination with the Division Environmental Officer. PHONE 336-3343192 FAX 336-3343637 y STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 LYNw TIPPETr GOVERNOR SECRETARY The NCDOT anticipates that the pipe replacement activity will be authorized under Nationwide Permit 14 and the dewatering operation will be authorized under NWP 33. This application is intended as a request for formal written authorization from the USACE to dewater the stream under NWP 33. This application is also intended as request for written authorization from the NC Division of Water Quality to replace the pipe under General Water Quality Certificate # 3289 (NWP 14). Enclosed please find the project site map and the pre-construction notification form for the above referenced project. Construction is anticipated to begin as soon as practicable following authorization and take two days to complete. If you have any questions or need any additional information, please contact John Hunsinger at (336) 634-5644 or Len Smith at (336) 375-5589. Your time and effort are appreciated. Sincerely, h• 4,x John B. Hunsinger District Engineer, District 3, Division 7 cc: Ms. Cynthia Van der Wiele, NCDWQ Mr. Lenwood Smith, II, PWS, NCDOT ??Ul PHONE 336-3343142 FAX 336-334-3637 0 OF W ATFR QG Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USACE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you are requesting an Individual 404 Permit or Individual 401 Water Quality Certification. The USACE Individual Permit application form is available online at http://www.saw.usace.armmil/wetlands/Perm app.htm. The USACE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USACE website at http://www.saw.usace.ariny.mil/wetlands/regtour.ht m, or contact one of the field offices listed at the end of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional information regarding the identification and regulation of wetlands and waters of the U. S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell the applicant which 401 Certification will apply until the 404 Permit type has been determined by the USACE. Applicants are encouraged to visit DWQ's 401/Wetlands Unit website at http://h2o.enr.state.nc.us/ncwetlands to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for some General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the internet should contact DWQ's Central Office in Raleigh at (919) 733-1786. Trout Waters Coordination - Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is also required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on the last page of this application). Page 1 of 11 CAMA Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on the last page of this application) the applicant should also contact the North Carolina Division of Coastal Management (DCM) at (919) 733-2293. DCM will determine whether or not the project involves a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency. In such cases, DCM will require a Coastal Area Management Act (CAMA) Permit and will coordinate the 404/401 Permits. USACE Permits - Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office (addresses are listed at the end of this application). Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 65 Fed.Reg. 12893 (March 9, 2000), available at http://www.saw.usace.army.mil/wetlands/nwpfinalFedReg.pdf. Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules - All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is required or specifically requested for a 401 Certification, then a non-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fee of $475 is required. A check made out to the North Carolina Division of Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, see the DWQ website at http://h2o.ehnr.state.ne.us/ncwetlands/fees.html. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application for a 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of 11 Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. 01164 If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit Section 10 Permit ® 401 Water Quality Certification F] Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 and 33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Mr. J.M. Mills, RE, Division Engineer - Division 7 Mailing Address: 1584 Yanceyyille Street Greensboro, NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills(a,dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name:_ Mr. John B. Hunsinger, District 3 Engineer Company Affiliation: NCDOT - Division 7 Mailing Address: P.O. Box 2513 Reidsville, N.C. 27323-2513 Telephone Number: (336) 634-5644 Fax Number: (336) 634-5656 E-mail Address: jhunsin er(a)dot.state.nc.us Page 3 of 11 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Rockingham County - Owl Road (SR 1975) 2. T.I.P. Project Number or State Project Number (NCDOT Only):6.512561 (non-TIP) 3. Property Identification Number (Tax PIN): N/A 4. Location County: Rockingham Nearest Town: Eden Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): ite is located approximate From haen Laze Nu 14 soutn to betnlenem unurcn Koaa exit. cross onawe. sett on JK ly4Jl 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential and agricultural 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Machine Creek 9. River Basin: Roanoke (Note - this must be one of North Carolina's seventeen designated major river basins. TITe River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.) Page 4 of 11 10. Describe the purpose of the proposed work: To upgrade an unpaved secondary road to a paved secondary road. Paving and widening are being; conducted to reduce future maintenance costs, bring the road up to current construction standards, and increase traffic safety. 11. List the type of equipment to be used to construct the project: Road construction equipment (Irackhoe, grader, backhoe, and bulldozer). 12. Describe the land use in the vicinity of this project: Irregularly mowed lawn and roadside shoulder. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland ar streammitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 11 1. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) 1975 Site A Pipe extension 20 (pm) 40 (tmp) 20 (rp) UT to Machine Creek 7.5' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us,gs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.coni, www.mapquest.coni, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 20 - permanent (pm), 40 - temporM (=), 20 - rip rap (rp) Page 6 of 11 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimised once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Pipe replacement and widenina activities are necessarv to increase travel lane and shoulder width to current construction standards. Impacts will be minimized by strict enforcement of Best Management Practices for the protection of wetland and surface waters, restrictions against the stag' of a uipment in or adjacent to waters of the US, and coordination with the Division Environmental Officer. s Page 7 of 11 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. A finding of insignificant impact is anticipated. Cumulative impacts are less than 150 feet The maximum amount of impact to a single stream is 20 linear feet. No Outstanding Resource Waters, federally protected species or their habitats occur in the project area The project is not located in a High Quality Water. Page 8 of 11 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:/lh2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 11 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* (square feet Multiplier Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A X1. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. In accordance with the Februarv 25. 1991 delegation agreement one conv of the sediment and erosion control plan will be submitted to DENR - Division of Land Resources and NCDOT Roadside Environmental Prior to construction. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XM. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? Page 10 of 11 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). it/Agent's Signature /bate signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 NATURAL RESOURCE EVALUATION SHEET State Project # SR Number Road Name County Investigator(s) 6.512561 1975 Owl Road Rockingham Len Smith Date: River Basin: Water Quality Designation Buffer Rules (Y/N) 12/08/01 Roanoke C No Primary Land Use Percent Residential Percent Agricultural: Percent Unmaintained: Agriculture 20 60 20 Streams Waters of the US M.M. Stream Name Perennial or Intermittent Ave. Wdth (OHWM) Ave. Dpth (OHWM) Ave. Wdth (TOB) Ave. Dpth (TOB) Notes 0.25 UT to Machine Creek Perennial 7.5' 1.0' 8.0' 7.5' M.M. = Mile Marker, OHWM = Measurements made from Ordinary High Water Marker, TOB = Measurements made from the Top of the Bank Wetlands M.M. Within 100-year Floodplain Distance to Nearest Stream (linear feet) Cowardin Classification Dominant Plants N/A Open Water M.M. Name of Waterbody (if applicable) Type of Waterbody M.M. Name of Waterbody (if applicable) Type of Waterbody N/A General Notes/Comments: Division Environmental Officer >0 6 0 ate ENDANGERED SPECIES REVIEW FOR DIVISION 7 DISTRICT 3 State Project # SR Number Road Name County 6.512561 1975 Owl Road Rockingham Caswell County James spinymussel (Pleurobema collina) - Roanoke Basin Habitat Survey Date Investigator(s) Man-hours Comments/Findings N/A Rockingham County Smooth Coneflower (Echinacea laevizata) Mav be surveved for from June to September Habitat Survey Date Investigator(s) Man-hours Comments/Findings No 09/29/01 Len Smith 0.5 James spinymussel (Pleurobema collina) - Roanoke Basin Habitat Survey Date Investigator(s) Man-hours Comments/Findings No 11/29/01 Len Smith, Tim Savidge 0.5 Channel is too small Potential Species (Listed in Nearby Counties) Schweinitz's sunflower (Helianthus schweinitzii)- Rockingham County - May be surveyed for from late August to October Habitat Survey Date Investigator(s) Man-hours Comments/Findings No 09/29/01 Len Smith 0.5 Small anthered bittercress (Cardamine micranthera) - Rockingham and Caswell Counties (Roanoke Basin) May be surveyed for in April and May Habitat Survey Date Investigator(s) Man-hours Comments/Findings No 09/29/01 Len Smith 0.5 General Notes/Comments: Division Environrnental Officer Z-67 V-0- 'Date NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: 7 County: Rockingham Project ID: 6.512561 River Basin: Roanoke Bridge No: N/A Route: 1975 Water Quality Criteria: Stream: UT to Machine Creek Yes No Stream Crossing Blue Line On USGS F r ORW r r WSJ r r WS II,III OR IV, Crossing Within 0.5mi of W.S. Critical Area r r Roadway Criteria: Route Designation- Additional Site Information: Yes No Arterial Urban r- r Arterial Rural r r, Yes No Is a Hazardous Spill Basin Required? r r Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997). DIVISION OF HIGHWAYS PLAN AND PROFILE FOR PROPOSED SECONDARY ROAD IMPROVEMENT SR 1975 OWL ROAD ROCKINGHAM COUNTY - WENTWORTH TOWNSHIP LENGTH 0.32 MILES 50' RIGHT OF WAY W.O. 6.512561 MAY 2, 2001 UTILITIES: DUKE ENERGY SPRINT HORIZONTAL SCALE 1" =100' / VERTICAL SCALE 1" = 20' 100 0 100 200 LOCATION: 1.1 MILES NORTHWEST OF SR 1945 OFF SR 1951 TYPE OF WORK: GRADE, DRAIN, BASE AND PAVE C?? ;,?. 2CS+D. .. ?.,$.:3.. '1k ;1950 •• .• +4 ?S U41 1946 /k5 WAS ? w VICINITY MAP (N T S) EROSION CONTROL - SEQUENCE OF OPERATIONS PROJECT LEGEND J0 POWER POLE TELEPHONE PEDESTAL -• 0 WELL / WELL HOUSE --- EXISTING IRON PIPE - 1. Review Erosion Control Plans and Standards. Identify all release points (outlets of crossline pipes, tail ditches, roadway ditches, fill slopes, etc.). 2. Install all measures @ release points prior to clearing & grubbing. See Erosion Control Standards for proper GUY WIRE installation. - FENCELINE 3. Begin grading operations - install all other measures as - EXISTING R/W grading progresses and monitor their effectiveness. If any measures need to be changed, consult Highway PROPOSED R/W Maintenance Engineer. Show changes on Erosion Control Plans. EROSION CONTROL LEGEND ® SILT BASIN TYPE B I, ROCK SILT CHECK TYPE B V PIPE OUTLET PROTECTION 8 ROCK SEDIMENT DAM TYPE B SILT FENCE -SILT DITCH PIPE INLET PROTECTION ----EARTH BERM SLOPE DRAIN ,nr SYNTHETIC ROVING ?:ID RIP RAP TYPICAL CROSS SECTION (NTS ) 4. Straw & Tack to be applied to grades of 0%-1%, Erosion control matting to be applied to grades of 1%-3% Synthetic roving to be applied to grades of 3%-5%, Stone liner to be applied to grades of 5% and above. 5. Install slope drains in problem areas as needed during construction. 6. Locate all borrow pits and waste areas with their erosion control measures on Erosion Control Plans or attach a separate sheet showing same. 7. Before moving to next job site, review all measures for effectiveness; make any adjustments, clean-outs, or repair; call Roadside Environmental Department for installation of ditch liner and seeding and mulching of all disturbed areas. 8. Continue to check and maintain all measures after each significant rainfall until all disturbed areas become stabilized. 9. Fill in all silt basins and silt ditches; remove all silt fences and slope drains; redistribute all stone from silt checks, sediment dams, and silt screens. Seed and mulch disturbed areas. CL 4' 6' 9' 9' 8' DL SHLDR PAVEMENT SHLDR. s. 1•. pER F[. 1/4•• PER FT- 114•• PER Ft. 1 •• pER A.1 F7'. 8" COMPACTED ABC =,t i SC?A ADD 1' PAVEMENT TO INSIDE OF CURVE FOR A So -150 CURVE. ADD 2' PAVEMENT TO INSIDE OF CURVE FOR A 160 -22° CURVE. MATCHL I.L Z o LL- d O "UJ p a ul) J °O Q ° Q ?N INL I.L a J kn 0 v W -4 R V I I ? ?I ICI w i l I o I lil I±I PTO' 1 I ? I , / I I I ,I I I I I LL J Q O N U)n I= N O co M Y 7.69 ? ? U co pm 0 W J ?N O ? O t O p p O tD iy r?{yOO / 11 11 11 II 11 11 11 FLa t--t N o \ W =a x R' > ,qq\ \ \ G?? MAN ?W \ \ \ \ z \ CO ' w \ ?6 0 w ix \\?, \ o z w W Y Q °O o?o?a N Li 'O w v ?W o z co W w 0 J vy w = a ?a %- W v W w ?w LU QW in ? O z ? ?+ 2 v et ? co Ln CIA C', V94?42- 1T mC mm Lo ? ? O II I `y a 11 n u u u u y / +C z / z? mm I?\ 1 U UJ // z 11 z ?c m °C Z m F U o W 0 0 + + O 0 C g a z 0 w October 2, 2001 Site 1975 Construction Sequence and Erosion Control Plan for Replacement of Pipe with Pipe on a Dead End Road - Rockingham County, SR 1975 Work to begin as soon as practicable following authorization. Construction is anticipated to take 2 days. 1. Install a rock silt dam downstream of the work area to prevent incidental sediment loss. 2. Install sand bags, cofferdams, or sheet piles to allow dewatering of the work area. 3. Install pumps to divert flow around the work area. 4. Excavate to sufficient depth to allow attachment of 10' sections of 72" CM pipe on each end of the existing pipe. 5. Place base stone and 10' sections at each end of the existing 72" CM pipe. 6. Backfill the new sections of pipe and place rip-rap, not to exceed 10', at each end of the pipe. 7. Remove the sand bags, rock silt dams, or sheet piles and restore the natural stream contours. 8. Notify landscape department for final seeding. 9. Silt fences to be placed as site conditions require. 10. A 10' X 15' dirt bag will be used to remove excess water in the holes where the new pipe sections being replaced. 11. Site conditions and weather may alter these plans. 12. A pump azo d system may not be utilized if site conditions allow. Supervisor , .y CO i 5 Cf) l E7 A%,-N rgayti i F CC" a CJL :z p n IndOstrlal Wa e Ponds i Mefer'S,tat ! - -` ? s;7 aa.= \ • (?-?/ / Jam/ / `!_ ???-'\`/` y?r ,. -\ ` •? ?? ?! - Cem . i .:j \t / f - ui ?1 4 - ?' ? r. I r 1 , f i m ?. ??/ / v Slaydor f Cem C rrP - 66J x 711 Mach ? 77, ?- _ / '.?1 - ; { ?,• V`- `? ire `,, . \ ?. / J19e J j ^ 647 ?"' _? 8rthlehrm ?h / _ r 5811 ? fi.T - t _ Cem' I-1979,11 ;" /? ?' ? l \ .? 1 x75D .. o? v V !!\v / +r?v?4 X600`\ \ G \ V tvi 41" Cem r` Name. SOUTHEAST EDEN Location: 17 617178 E 4036720 N Date: 10/12/2001 Caption: Location of pipe replacement on OWI Road - SR 1975 Scale: 1 inch equals 2000 feet (C) 1997, Maptech, Inc View upstream from the pipe being extended under SR 1975. View of pipe outlet. Note maintenance of low flow. L 4 `?' j 1 4. ..SI View downstream from the pipe being extended under SR 1975.