No preview available
HomeMy WebLinkAboutWQCS00327_Compliance Evaluation Inspection_20200810 North Carolina Department of Environmental Quality  Division of Water Resources 610 East Center Avenue  Suite 301  Mooresville, North Carolina 28115 704-663-1699 August 10, 2020 Mr. Mike Legg, City Manager City of Kannapolis 401 Laureate Way Kannapolis, North Carolina 28081 Subject: Compliance Evaluation Inspection Permittee: City of Kannapolis Waste Water Collection System Permit No. WQCS00327 Cabarrus County Dear Mr. Legg: 1. Mr. Tony Parker of the Mooresville Regional Office of the NC Division of Water Resources (DWR or the Division) conducted a compliance evaluation inspection (CEI) of the City’s wastewater collection system (WWCS) on August 6, 2020. The assistance of Mr. Alex Anderson and Mr. Ed Sowell and others during the inspection was greatly appreciated. A copy of the inspection report is attached for your records and inspection findings are summarized below. Site/System Review 2. The following system components were inspected: a. Four pump stations were inspected. b. Numerous manholes were inspected. c. Several right of way was inspected. d. One aerial crossing was inspected. Please review the attached Report for additional details and items noted during this inspection 3. As you are aware, owners of permitted collection systems must comply with their permit and all rules listed under NC Administrative Code 15A NCAC 02T .0400, et seq. The Town’s compliance status with each of these rules is summarized below: a. 15A NCAC 02T .0403(a)(1): Requires that the system be effectively maintained and operated at all times to prevent discharge to land or surface waters and any contravention of ground or surface water standards. Observations: Each pump station appeared to well maintained and operated, however, grease was noted in high concentrations at 3 of the pump stations inspected. More work needs to be done in this area. Compliance Status: Compliant b. 15A NCAC 02T .0403(a)(2): Requires that a map of the wastewater collection system be developed and actively maintained. Observations: The City utilizes a GIS mapping system and has various paper maps and showing locations of lines, direction of flow, force mains, pump stations, manholes and other information. Compliance Status: Compliant c. 15A NCAC 02T .0403(a)(3): Requires that an operation and maintenance (O&M) plan be developed and implemented, which includes pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response. Observations Pump station logs were available. Records were available for all activities. Spare parts and pumps are kept in stock. An overflow response plan was available. Compliance Status: Compliant d. 15A NCAC 02T .0403(a)(4): Requires that the permittee or its representative inspect pump stations that are not connected to a telemetry system (i.e., remote alarm system) every day (i.e., 365 days per year) and pump stations that are connected to a telemetry system at least once per week. Observations: The pump station inspection logs indicate that the pump stations are visited as required. Compliance Status: Compliant e. 15A NCAC 02T .0403(a)(5): Requires that the permittee or its representative inspect high-priority sewers (HPS - as defined in 15A NCAC 02T .0402(2)) at least once every six months and document the inspections. Observations: All lines are checked and documented. Compliance Status: Compliant f. 15A NCAC 02T .0403(a)(6): Requires that the permittee or its representative conduct a general observation of the entire wastewater collection system at least once per year and document same. Compliance Status: Compliant. g. 15A NCAC 02T .0403(a)(7): Requires that overflows and bypasses from the system be reported to the Division's Mooresville Regional Office in accordance with 15A NCAC 02B .0506(a), and that public notice must be provided as required by G.S. 143-215.1C. Observations: SSO’s have been reported with this system during this review period. The NC regulations and statutes, which cover the reporting requirements for SSOs, are found in NC Administrative Code 15A NCAC 02B .0506(a) and NC General Statute 143-215.1C, respectively. You may access the NC regulations online at the NC Office of Administrative Hearings (OAH) website at: http://www.oah.state.nc.us/rules/ and the NC General Statutes online at the NC General Assembly's website at: http://www.ncga.state.nc.us/gascripts/Statutes/StatutesTOC.pl. You may wish to review them to ensure you are fully familiar with all requirements. When reporting SSOs to DWQ, you must call the Mooresville Regional Office (MRO) at 704-663-1699 during normal business hours. If outside normal business hours, you must report the spill to the NC Division of Emergency Management at 1-800-858-0368. Please note that all reportable SSOs must be reported within 24 hours of the occurrence, or first knowledge, of the SSO. Please also note that voice mail or faxed messages are not considered as the initial verbal report. You must talk to and report the spill to a live person. Compliance Status: Compliant h. 15A NCAC 02T .0403(a)(8): Requires that a grease control program be developed and implemented as follows: 1. For publicly owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users and the legal means to require grease interceptors. The Program shall also include legal means for inspections, enforcement, and legal means to control grease entering the system from other public and private satellite sewer systems. 2. Grease education materials shall be distributed more often than required above if necessary to prevent grease-related sanitary sewer overflows. Observations: Educational materials are mailed out to all customers and the same information is available upon request and is available at City offices and on line. Compliance Status: Compliant. i. 15A NCAC 02T .0403(a)(9): Requires that right-of-ways (ROW) and easements be maintained to allow for personnel and equipment accessibility. Observations: Records were reviewed documenting that the right-of-ways were mowed, inspected and maintained to provide accessibility. Compliance Status: Compliant. j. 15A NCAC 02T .0403(a)(10): Requires that documentation be kept for all activities you undertake to comply with the requirements of 15A NCAC 02T .0403, subparagraphs (a)(1) through (a)(9), for a minimum of three years, with the exception of the map, which shall be maintained for the life of the system. Observations: Records were reviewed for right of way mowing, high-priority line inspections, and observation of the entire system. Compliance Status: Compliant The inspection report should be self-explanatory; however, if you have any questions regarding the inspection report or this letter please contact Tony Parker at 704-663-1699 or tony.parker@ncdenr.gov. Sincerely, W. Corey Basinger, Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDEQ Attachment: BIMS Inspection Report CC: MRO Central Files PERCS Unit (e-copy) for Compliance Inspection Report Permit: WQCS00327 Effective: 05/23/17 Expiration: 02/28/25 Owner: City of Kannapolis SOC: Effective: Expiration: Facility: Kannapolis Collection System County: Cabarrus 819 Richard Ave Region: Mooresville Kannapolis NC 28081 Contact Person: Wilmer Melton Title: Director of Public Works Phone: 704-920-4231 Directions to Facility: System Classifications: CS3, Primary ORC: Wilmer Melton Secondary ORC(s): On -Site Representative(s): Certification: 28404 Phone:704-920-4200 Related Permits: NC0036269 Water and Sewer Authority of Cabarrus County - Rocky River WWTP Inspection Date: 08/06/2020 Entry Time 09:30AM Exit Time: 01:OOPM Primary Inspector: Tony Parker Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions General Sewer & FOG Ordinances Capital Improvement Plan Map Reporting Requirements Inspections Spill Response Plan Spills Lines Manholes Pump Stations (See attachment summary) Page 1 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: This inspection revealed that the City is in compliance with their permit but some areas need improvement and are listed as follows: Grease control- Grease inspections may need to be increased due to SSO's and grease accumlation at the P/S's visited. CIP - More details need to be provided in future plans. SSO's - The City had multiple spills at reoccuring locations and there needs to be detailed plans in place to address this issue in the future. This should also be in your CIP. For the most part the City does a good job at O/M and with a little more attention to the above items could go a long way at preventing the high number of SSO's and will show details of infastructure improvements and planning. Page 2 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE Is there a properly designated primary ORC and at least one back-up of proper grade? 0 ❑ ❑ ❑ Are logs being reviewed by the system management or owner on a regular basis? 0 ❑ ❑ ❑ # What is that frequency? weekly # Are there any issues being addressed currently or any in the planning stages? 0 ❑ ❑ ❑ Is there a specific pump failure plan available for all pump stations? 0 ❑ ❑ ❑ Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? 0 ❑ ❑ ❑ Are new/significantly upgraded pump stations equipped with anti -corrosion materials? 0 ❑ ❑ ❑ Does the permittee have a copy of their permit? 0 ❑ ❑ ❑ # Is permit expiring within the next 6 months? ❑ 0 ❑ ❑ If Yes, has the Permittee applied for renewal? ❑ ❑ 0 ❑ Comment: The current permit expires 2/28/25. Sewer and FOG Ordinances Yes No NA NE Is Sewer Use Ordinance (SUO) or other Legal Authority available? 0 ❑ ❑ ❑ Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ ❑ Is there a Grease Control Program that legally requires grease control devices? 0 ❑ ❑ ❑ What is the standard grease trap cleaning requirement in the FOG ordinance? variable Is Grease Control Program enforced via periodic inspections/records review? ❑ ❑ ❑ Is action taken against violators? ❑ ❑ ❑ # Have satellite systems adopted an equivalent or more stringent ordinance? 0 ❑ ❑ ❑ Is grease/sewer education program documented with req'd customer distribution? 0 ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? 0 ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) Mail outs, on line, school tours and annual report. Comment: Capital Improvement Plan Yes No NA NE Has a Capital (CIP) or System Improvement Plan been developed and adopted? 0 ❑ ❑ ❑ Is it designated for wastewater only or does it have a dedicated section? 0 ❑ ❑ ❑ Does CIP cover three to five year period of earmarked improvements? ❑ ❑ ❑ Does CIP include description of project area? ❑ ❑ ❑ Does CIP include description of existing facilities? ❑ ❑ ❑ Does CIP include known deficiencies? ❑ ❑ ❑ Does CIP include forecasted future needs? ❑ ❑ ❑ Page 3 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Comment: The CIP provided for this inspection provided little info on actual details or projects. Giving the history of the high number of SSO's reported the City should have significant projects forecasted for infastructure improvements. Map Yes No NA NE Is there a overall sewer system map? 0 ❑ ❑ ❑ Does the map include: Pipe Type (GS/FM) 0 ❑ ❑ ❑ Pipe sizes 0 ❑ ❑ ❑ Pipe materials (PVC, DIP, etc) 0 ❑ ❑ ❑ Pipe location 0 ❑ ❑ ❑ Flow direction 0 ❑ ❑ ❑ Approximate pipe age 0 ❑ ❑ ❑ Pump station ID, location and capacity 0 ❑ ❑ ❑ # Force main air release valve location & type 0 ❑ ❑ ❑ # Location of satellite connections 0 ❑ ❑ ❑ Is the map being updated for changes/additions within 1 year of activation? 0 ❑ ❑ ❑ Comment: Various paper maps and GIS maps were available Reporting Requirements Yes No NA NE # Have there been any sewer spills in the past 3 years? 0 ❑ ❑ ❑ If Yes, were they reported to the Division if meeting the reportable criteria? ❑ ❑ ❑ If applicable, is there documentation of press releases and public notices issued? ❑ ❑ ❑ Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑ Is the report being made available to all its sewer customers? ❑ ❑ ❑ # How is it being made available? web site Comment: The City has reported numerous spills for the 2019/2020 review period. Inspections Yes No NA NE Are adequate maintenance records maintained? ❑ ❑ ❑ Are pump stations being inspected at the required frequency? ❑ ❑ ❑ # Is at least one complete functionality test conducted weekly per pump station? ❑ ❑ ❑ Is there a system or plan in place to observe the entire system annually? ❑ ❑ ❑ Is the annual inspection documented? ❑ ❑ ❑ # Does the system have any high -priority lines/locations? ❑ ❑ ❑ Are inspections of HPL documented at least every 6 months? ❑ ❑ ❑ Are new lines being added to the HPL list when found or created? ❑ ❑ ❑ Comment: Good maintenance records were available. Spill Response Action Plan Yes No NA NE Page 4 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Does the plan include: 24-hour contact numbers Response time Equipment list and spare parts inventory Access to cleaning equipment Access to construction crews, contractors, and/or engineers Source of emergency funds Site sanitation and cleanup materials Post-overflow/spill assessment Does the Permittee appear to respond within 2 hours of first knowledge of a spill? Comment: Spills Is system free of known points of bypass? If No, describe type of bypass and location • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑❑❑■ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE ■❑❑❑ Are all spills or sewer related issues/complaints documented? ❑ ❑ ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ ❑ ❑ # If Yes, is there a corrective action plan? ❑ ❑ ❑ Comment: If not already in progress the City needs to implement corrective action plans for the multiple reoccuring SSO's at the same locations. These locations should also be part of of your CIP. Future inspections will require more details in this area. Lines/Right-of-Ways/Aerial Lines Yes No NA NE Please list the Lines/Right of Ways/Aerial Lines Inspected: Various outfall R/W's were visited with one issue noted. The outfall from Lake Fisher Rd. to the Mid Lake Rd P/S needs some clearing work. Are right-of-ways/easements maintained for full width for access by staff/equipment? ❑ ❑ ❑ If No, give details on temporary access Is maintenance documented? ❑ ❑ ❑ Are gravity sewer cleaning records available? ❑ ❑ ❑ Has at least 10% of lines older than 5 yrs been cleaned annually? ❑ ❑ ❑ Were all areas/lines inspected free of issues? 0 ❑ ❑ ❑ Comment: The City has cleaned 37 miles of line for the review period and slightly exceeded the 10% minimum requirement and good documentation records were available for all activities. Manholes Please list the Manholes Inspected: Numerous M/H's inspected with no major issues. / ]r- ]..�.1N Page 5 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Are manholes accessible? 0 ❑ ❑ ❑ # Are manhole covers/vents above grade? 0 ❑ ❑ ❑ Are manholes free of visible signs of overflow? 0 ❑ ❑ ❑ Are manholes free of sinkholes and depressions? 0 ❑ ❑ ❑ Are manhole covers present? 0 ❑ ❑ ❑ # Are manholes properly seated? 0 ❑ ❑ ❑ # Are manholes in good condition? 0 ❑ ❑ ❑ # Are inverts in good condition? 0 ❑ ❑ ❑ Is flow unrestricted in manholes? 0 ❑ ❑ ❑ Are manholes free of excessive amounts of grease? 0 ❑ ❑ ❑ Are manholes free of excessive roots? 0 ❑ ❑ ❑ Are manholes free of excessive sand? 0 ❑ ❑ ❑ Are manhole vents screened? ❑ ❑ ❑ Are vents free of submergence? ❑ ❑ ❑ Are manholes free of bypass structures or pipes? 0 ❑ ❑ ❑ Comment: Pump Stations Yes No NA NE Please list the Pump Stations Inspected: Mid Lake Rd, Forest Brook Dr, South Chapel St & 18th St P/S's. No major issues observed. However grease accumlations were noted in all but one of the four P/S's inspected. The City may need to ramp up inspections for grease establishments if conditions do not improve or clean the P/S's more often. # Number of duplex or larger pump stations in system 14 # Number of vacuum stations in system 0 # Number of simplex pump stations in system 0 # Number of simplex pump stations in system serving more than one building 0 How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? 14 # A simple one-way telemetry/communication system (auto -dialer) installed? 0 For pump stations inspected: Are they secure with restricted access? 0 ❑ ❑ ❑ Were they free of by-pass structures/pipes? 0 ❑ ❑ ❑ Were wet wells free of excessive grease/debris? 0 ❑ ❑ ❑ # Do they all have telemetry installed? 0 ❑ ❑ ❑ Is the communication system functional? 0 ❑ ❑ ❑ Is a 24-hour notification sign posted ? 0 ❑ ❑ ❑ Does the sign include: Owner Name? 0 ❑ ❑ ❑ Page 6 of 7 Permit: WQCS00327 Owner - Facility: City of Kannapolis Inspection Date: 08/06/2020 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Pump station identifier? 0 ❑ ❑ ❑ # Address? 0 ❑ ❑ ❑ Instructions for notification? 0 ❑ ❑ ❑ 24-hour emergency contact numbers? 0 ❑ ❑ ❑ Are audio and visual alarms present? 0 ❑ ❑ ❑ Are audio and visual alarms operable? 0 ❑ ❑ ❑ # Is there a backup generator or bypass pump connected? 0 ❑ ❑ ❑ If tested during inspection, did it function properly? 0 ❑ ❑ ❑ Is the back-up system tested at least bi-annually under normal operating conditions? 0 ❑ ❑ ❑ # Does it have a dedicated connection for a portable generator? 0 ❑ ❑ ❑ # Is the owner relying on portable units in the event of a power outage? 0 ❑ ❑ ❑ # If Yes, is there a distribution plan? 0 ❑ ❑ ❑ If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? The City utilizes dedicated and portable units at their P/S's. Eight sites have dedicated units and the others are equipped with quick connects for a portable generator hook up. The City maintains 2 portable units. # Does Permittee have the approved percentage of replacement simplex pumps? ❑ ❑ ❑ Is recordkeeping of pump station inspection and maintenance program adequate? 0 ❑ ❑ ❑ Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? ❑ ❑ ❑ Inspecting and exercising all valves? ❑ ❑ ❑ Inspecting and lubricating pumps and other equipment? ❑ ❑ ❑ Inspecting alarms, telemetry and auxiliary equipment? 0 ❑ ❑ ❑ Comment: Good record keeping noted. Page 7 of 7