HomeMy WebLinkAboutSW4200601_12052-Southwick Solar LLC-NCDEQ SW Revisions-Docs-2020-08-07_20200807Cb Civil
Design
Concepks, PA
Transmittal
Date: August 7', 2020
Project Name: SOUTHWICK SOLAR, LLC
CDC Project: 12052
To: Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Stormwater Program
217 West Jones Street
Raleigh, NC 27603
Via: ® Mail ❑ Overnight ❑ Hand Delivered ❑ Pick up @ CDC Office ® Digital
Copies Date Description
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Comment Response Letter
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Revised Stormwater Management Application
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Supplemental EZ Form
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 O&M EZ Form
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Resolution Designating Ben Catt to Sign
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Solar Array Racking Detail for 800400 Rev C, VOYAGER, 1500V TRACKER
------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------
1 08/07/2020 Revised Supporting engineering calculations (with slope map)
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
2 08/07/2020 Revised 24"x36" engineering plans
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Remarks:
Greg offman, P.E.
Mailing Address: P.O. Box 5432, Asheville, NC 28813
168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455
f^ /
August 7, 2020
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Stormwater Program
217 West Jones Street
Raleigh, NC 27603
Re: Southwick Solar, LLC
CDC Project No.: 12052
Dear Mr. Farkas,
On behalf of the Pine Gate Renewables, LLC, we are pleased to submit the requested additional
information for your review and approval. The comments identified in the letter from your
office dated July 31 ', 2020 and the associated responses (in blue) are listed below.
1. Please verify with Alamance County that they are unable to review this project for
compliance with post -construction stormwater requirements. This project is located in the
Jordan Lake Watershed and local jurisdictions may implement the stormwater
postconstruction rules in these areas.
County does not permit post-constraction stormwater compliance. I was directed to
contact
2. Please fill out Section. II, 5.
3. Please describe the nature of how stormwater will be treated on site in both Section IV,
and in the stormwater narrative (Section VI, 5). Thisdescription/narrative should
Mailing Address: P.O. Bog 5432, Asheville, NC 28813
168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-4524410 Fag: 828-456-5455
expound on the low density requirements for solar farms as outlined in Part E-6 of the
Manual.
As requested, Section IV, I and the Storrawater Narrativedescriptions of
how the stormwater will be treated in compliance with section E-6 of the NC Stormwater
4. Please fill out Section IV, 5 & 6. If either of these items is zero (0), you should enter "0"
for these items.
5. Please calculate the total project area as indicated in Section IV, 7. If an area other than
the property area (Such as a limit of disturbance) is being used to define the area in which
the project is being constructed, then please also revise Section IV, 4 to account for this.
6. Please ensure that the percent impervious area is calculated correctly (Section IV, 8).
7. Since this is a low density project and the entire site drains to the same receiving water,
there should only be one drainage area listed (Section IV, 9). This drainage area is the
property area.
+,�
8. Please correct the following issues with the table in Section IV, 10:
a. Please remove the second drainage area column.
b. Total Drainage Area This value should match the total project area, Section IV,
7.
Mailing Address: P.O. Sox 5432, Asheville, NC 28813
168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Pax: 828456-5455
c. On -site Drainage Area — This value should equal the total drainage area value.
d. Off -site Drainage Area — There should not be any off -site component to the
drainage area since the drainage area is the entire project area.
e. % Impervious Area — The percent impervious area should match the project
percent impervious area, Section IV, 8. Revise either as needed.
9. Off -site impervious area delineation is not required since this is a low density project
(Section IV, 11).
. PIease provide original, signed & sealed copies of the Supplement-EZ Form and O&M
Agreement Form (Section V & Section VI, 3). These forms are required for all projects
and can be found at the following address:
https://deq.nc.gov/about/divisions/energymineral- land-resources/energy-mineral-land-
permit-guidance/stormwater-bmp-manualThe forms use macros to load the proper sheets
so ensure that the documents are enabled for editing and that macros are enabled. NOTE:
There is not a specific O&M Agreement facility that fits well with solar farms. It is
recommended to enter a custom facility type in the form and populate it with the relevant
maintenance requirements from the Grass Swale and Part E-6 of the Manual.
r u"
included with this submittal.
identifyingSince the State does not have a template for this situation, we created a form
items typically associated with maintaining ground cover.
1.1. Please dimension the property/project boundary with bearings and distances (Section VI,
8i). This is only applicable if an area other than the property area (Such as a limit of
disturbance) is being used to define the area in which the project is being constructed.
Mailing Address: P.O. Box 5432, Asheville, NC 28813
168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-4524410 Fax: 828456-5455
As requested, the bearings a1 distances are included on sheet
shown ;, the survey which is includedsubmittal.
12. Please provide details and quantities of the impervious solar panel footings and inverter
pad so that the provided impervious area calculations may be verified (Section VI, 8j).
"Imperviousincluded (see a
13. Please provide proposed contours on plan sheet C201 (Section VI, 8k).
shownProposed contours are provided on sheets C3 01 and C40 1. No grade information is
in sheet C201 . This is intentional and typical of ; order4 (id
provide clarity.
14. Please provide official documentation showing that Benn Catt can sign on behalf of
either the Applicant, Pine Gate Renewables, LLC, or the Manager of Pine Gate
Renewables, LLC, PGR Partners, LLC (Section VI, 11),. This item is required.
15. Please put a note on the plans (In the General note, Construction Sequence, or other
applicable location) indicating that compaction of the subsoil should be avoided (Solar
Farms Recommendation 1).
As requested, a note indicating that subsoil compaction should be avoided, has been
added included
16. Please provide a detail in the main set of plans showing that the horizontal distance
between rows of solar panels is at least as wide as the solar panel (Solar Farms
Recommendation 2. Please refer to Figure 1 in Part E-6 of the Manual for more
clarification) and that the lowest vertical clearance for the proposed panels is no more
than 10 feet (Solar Farms Recommendation 6).
rI X SOPdraL1011
solar arrays (see sheet C921). Please note o
array and the g-anels will rotate througU2L r . the panel edges will range from 0.92 ,
/ 2tirnes the solar .
nel width. Solar farms
Mailing Address: P.O. Box 5432, Asheville, NC 28813
168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455
recommendationdisconnection .times
width if there are horizontal gaps between modules. As you can see on the included
racking drawings signed by Wolfgange Fritz on June 15, 2020, there is a 2.5 inch
horizontal and 2.25 inch vertical gap between modules
17. Please provide a proposed conditions slope map of the areas of the proposed solar panels
indicating any slopes in excess of 8% (Solar Farms Recommendation 2). If there are any
areas in the vicinity of the proposed solar panels that have a ground slope in excess of 8%
please provide some means of maintaining sheet flow.
18. Please ensure that the plans specify that a mix of warm and cool season grasses are to be
planted under the proposed solar panels (Solar Farms Recommendation 5).
a . rr
See permanent seeding measures on sheet C93 1.
19. Plan Sheet C 101 & C201— The percent impervious area (97.2%) and percent pervious
area (2.8%) appear to be switched.
r ♦ O
20. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
hgps:,'/edocs.deo.nc.jzov/Forms/SWo`e t Submittal
" It # . TerTISITITS i .copics 01 run=p 73 MUM ana
hard copy E r`d.
If you should have any questions or comments regarding this submittal, please do not hesitate to
contact our office.
Sincerely,
Greg Hoffman, PE
Civil Design C cepts, A.
Mailing Address: P.O. Box 5432, Asheville, NC 28813
168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786
Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455
DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph 11- Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
SOUTHWICK SOLAR, LLC
2. Location of Project (street address):
3058 BOY WOOD ROAD
City:GRAHAM
County:ALAMANCE
3. Directions to project (from nearest major intersection):
Zip:27253
0.1 MILES NORTH FROM THE INTERSECTION OF ROUT NO. SR2116 AND ROUTE NO. SR2658
TOWARD SR2158.36
00
Latitude:36° 00' 36" N
Longitude:-79° 22' 19.2" W
of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with modifications also requires SWU-102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other
If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
®Sedimentation/Erosion Control: 24.5 ac of Disturbed Area
❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:
5. Is the project located within 5 miles of a public airport? ®No ❑Yes
If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations
Form SWU-101 Version Oct. 31, 2013 Page 1 of 6
III. CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/Organization: PINE GATE RENEWABLES, LLC
Signing Official & Title:BEN CATT
b.Contact information for person listed in item 1a above:
Street Address:130 ROBERTS STREET
City:ASHEVILLE
Mailing Address (if applicable):
State:NC
Zip:28801
City: State: Zip:
Phone:
Email:
Fax:
Please check the appropriate box. The applicant listed above is:
❑ The property owner (Skip to Contact Information, item 3a)
® Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/ Organization: 10 DY GRAHAM WHITE
Signing Official & Title:JODY GRAHAM WHITE, OWNER
b.Contact information for person listed in item 2a above:
Street Address:2925 BOY WOOD RD
City:GRAHAM
Mailing Address (if applicable):
City:_
Phone:
Email:
State:NC
Fax:
Zip:27523
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/ Organization: JEFF HUNTLEY
Signing Official & Title:
b.Contact information for person listed in item 3a above:
Mailing Address:
City: Staff
Phone: (828 ) 777-6152 Fax:
Email:
4. Local jurisdiction for building permits:
Point of Contact: Phone #: ( )
Form SWU-101 Version Oct. 31, 2013 Page 2 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Proposed slopes have been designed under 8% to prevent concentration of runoff. Subsoil compaction will be
minimized during construction. Runoff from solar panel arrays will be disconnected. Use of herbacide
/fertilizer shall be minimized for ground cover minatenace A mix of warm and cool season grasses shall be
planted under the panels. The vertical limit of the solar arrays has been designed not to exceed 10ft. All
ground cover shall be reseeded as required.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW - 1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the CAPE FEAR River basin.
Total Property Area: 42.5
acres
5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0.35 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area':42.15 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water
(MHM line, and coastal wetlands landward from the NHW (or MH1O line. The resultant project area is used to
calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHVv) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 3.3
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area
Drainage Area
Drainage Area
Receiving Stream Name
HAW RIVER
Stream Class *
WS-V;NSW
Stream Index Number
16-(10.5)
Total Drainage Area (sf)
1,836,054
On -site Drainage Area (sf)
1,836,054
Off -site Drainage Area (sf)
0
Proposed Impervious Area** (sf)
60,701
Impervious Area** (total)
3.3
Impervious- Surface Area
Drainage Area 1
Drainage Area _
Drainage Area _
Drainage Area _
On -site Buildings/Lots (sf)
On -site Streets (sf)
On -site Parking (sf)
On -site Sidewalks (sf)
Other on -site (sf)
48,026
Future (sf)
Off -site (sf)
Existing BUA*** (sf)
12,675
Total (sf):
60,701
* Stream Class and Index Number can be determined at: http2.Z&ortal.ncdenr.or /wg eb/wq&s/csu/classifications
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6
Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
*** Report only that amount of existing B UA that will remain after development. Do not report any existing B UA that
is to be removed and which will be replaced by new B UA.
11. How was the off -site impervious area listed above determined? Provide documentation.
Protects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that maybe subject to more stringent stormwater requirements as per I5A NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be
submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the
interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms
does.
Initials
1. Original and one copy of the Stormwater Management Permit Application Form.
GH
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
GH
Form. (if required as per Part VII below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
GH
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
GH
http://www.envhelp.org/pages/onestopexpress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
GH
5. A detailed narrative (one to two pages) describing the stormwater treatment/management
for
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
GH
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
GH
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
GH
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
Form SWU-101 Version Oct. 31, 2013 Page 4 of 6
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify GH
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior
to submittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book: 3737 & 3647 Page No: 0871 & 0464 GH
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC GH
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
httj2://www.secretary.state.nc.us/Cor]2orations/CSearch.asj2x
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-
stormwater-forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:GREG HOFFMAN, P.E.
Consulting Firm: CIVIL DESIGN CONCEPTS, PA
Mailing Address:168 PATTON AVE
City:ASHEVILLE
Phone: (828 ) 252-5388
Email:GHOFFMANOCDCGO.COM
State:NC
Fax: ( )
Zip:28801
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) [ODY GRAHAM WHITE certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) PINE GATE RENEWABLES, LLC
provided with the submittal, which indicates the party responsible for the operation and maintenance of the
stormwater system.
Form SWU-101 Version Oct. 31, 2013 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed, in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General. Statue 143-21 a.1 and may result in appropriate enforcement
action including the Assessment of ctyil penalties of ,up, to, $25,€ 00 per day, pursuant to NCCS 143-215.6.
fi
Signature:___ ' ",.., �^....�•� �' � r r �` .. •.�.�m.�.
�' � k I , r, o� Date: tip
„
1, 1 • - ', rc c_..r.. a Notary Public for the State of l' �� I V f � 6- _, County of
o'n tmm _, do hereby certify that',Ack > k S, Liz personally appeared
a eared
before me this day of i..f ... t acknowledge the due execution of the a for
p �mm La and acowle g application
a stormwater permit, Witness my hand and official seal,
,1 3 L'�. s i 'w
10A J COUSIN
Notary Public, - k1YDrth Carolina
AB.anzan[e Caunty
MAy C MIri5sron Expires ocL 94, 21)22
X. APPLICANT'S CERTIFICATION
SEAL
My commission expires J A M i L i 1, ...d
t, (print or type name of person listed in Contact Information, iteni 1a) DINE GATE RENEWABLEr LL.0
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements.
R
a Notary Public for the State of
_._._._. do hereby certify that
before me this — day of
Date:
County of
personally appeared
and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,.
SEAM
My commission expires
Form SWU-101 Version Oct. 31, 2013 page 6 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature:
a Notary Public for the State of
do hereby certify that
Date:
County of
personally appeared
before me this — day of , and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal, ...,,,,,, .... _
SEAL
My commission expires
X. APPLICANT'S CERTIFICATION
L (print or type name of person listed in Contact Information, item Ta) PINE GATE RENEWABLES, LLC
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements.
Signature:_ Date: U I r1
L. OJJV' 'C- t40r0IJ J a Notary Public for the State of ooleon CSM),n.�County of
QAXbry1 , do hereby certify that (34,n CAA personally appeared
before me" I day of 3y hA- and 5�lr
e due execution of the application for
a stormwater permit. Witness my hand and official seal,
Nellie Moraru
NOTARY PUBLIC
fission E)ppouNTy W 24, 2C22
My commission expires_ 1_�� 1Z
Fornn SWU-101 Version Oct. 31, 2013 Page 6 of 6
SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
SOUTHWICK SOLAR, LLC
2
Pro ect Area ac
42.15
3
Coastal Wetland Area ac
_
_ _ _0_
— W0.35 _
4
Surface Water Area ac
5
Is thin project High or Low Density?
Low _
B
Does this project use an off -site SCM? — No
COMPLIANCE WITH 02H,1008(4} _.
7 Width of vegetated setbacks provided feet n1a
a Will the stated setback remain ngetated?
8 Is BUA other that as listed in .1003 4 c-d out of the setback? No
10 Is streembank stabilization proposed on this project? _... _.._.. __ No
NUMBER AND TYPE OF SCMs?,' �a
11
Infiltration System
Sloratention Cell.-
12
13
Wet Pond _ - pm
Stormweler wetland { ---•.-----_. —• ___ ® .-. ®_ ._. _..
Permeable Pavement __.—.. _ _ _ 0
Sand Filler 0
14
15
16
17
RainwaterHarvestin RWH 0
Green Roof 0
Level Spreader -Filter StriLS-FS 0
Disconnected Impervious Surface (DIS) D
Treatment Swale
18
19
20
21
22
Dry Pond
®.......�__�._
0
23
SrormFitter
24
Silva Cell
26 1
Filters
DESIGNER CERTIFICATION
27 Name and Tile: _ GREG HOFFMAN. P,E
28 Organization: CIVIL DESIGN CONCEPTS RP _•
29 Street address: 188 PATTON AVE._
30 City, State- Zip: _----ASHEVILLE NC 28801 — -- --
31 Phone numbs s : _ _ (828) 2525388
32 Email: GHOFFMAN®CDCGO.COM J
Oertifleallon Statement
I certifp. under penally of law that this Supplement-EZ form and ali suppoding infarmshon were prepared under my direction or
supervision, thai the Information provided in the loan is; to the beat of my knowledge and belief We, accurate, and complete, and
that the`angineen% plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the informaton provided here
.�,XH caRo�,,
;?o���.ss��
= SEAL =
D35093 =
r
rrRi
DRAINAGE AREAS
1 Is this a high density project? — ----I — a No= -
2 tF so number of drainage areaaGCMs __-_--1 ,
Is all/part of this project subject to previous rule I
3 versions? i No
FOr.MS LOADED
DRAINAGE
AREA INFORMATION
Entire site
4
TypeofSCM
USER DEFINED
__�L
Total BUA in project ft
_ .607011 sf
N!A
6
New BUA on subdivided lots (subject to
enmittin ft
7permitting)N!A
New BUA outside of subdivided lots (subject to
8
OMe - total area ft -
-
NIA
9
Offstte BUA (sq ft
_
NIA
10
Breakdown of new BUA outside subdivided lots:
Parkin ft
WA _
_ WA _
N!A
Sidewalk ft
Roof ft
Roadway ft
_
NIA.
- N/A -
Future (sq ft
Other, please specify in the comment box
below ft
.
48028 sf�
11
New infiltrating permeable pavement on
subdivided lots fsq ft
12
New Infiltrating permeable pavement outside of
subdivided lots (sq ft
WA
13
Exisitng BUA that will remain (not subject to
rmittin ft
_ _
__ 12t37F sF
_ Mak
_ N/A__ _
14
E)dsting BUA that ie already permitted (sq ft
15
18
F?dsting BUA that will be removed ft
Percent BUA
17
Desl n storm inches
tin
18
Desi n volume of SCM cu ft
__
NIA
19
Calculation method for tlesi�n volume
NIA
DITIONAI_ INFORMATION
Please use this space to provide any additional Information sbout'the
20ins a area e : -
Arse listed es "other" composed of the following Gravel, Pavement
Concrete (Inverter Pods) SolarArravPlies
11(017&]4M�
DESI
1
N I 1 C F
Is project balow density thresholds set forth in the applicable stomtwater rule?
(n s
2
Does project mwdmize dispersed flow and minimize channelizatior of flow?
Yes
3
..............................................................................
Has the use of piping been minimized per .1003(2)(c)?
_ ,...
r'as
4
Side slopes of the vegetated conveyances (H:1)
IIWA
5
MeAmum velocity In the vegetated conveyances during the 10-year storm?
6
Are curb outlet swales proposed?
No
7
......................................................,,,,,,,,,,,
Miudmum longitudinal slope of curb outlet swale(s) (%)
8
Boftm width of curb outlet swele(s) (feet)
8
`mum side slope of curb outlet swale(s) (H:1n
10
Minimum length of curb outlet swale(s) (feet)
11
Are treatmerd swales used instead of curb outlet swales?
12
Is stormwater released at the edge of the setback as dispersed flow?
_
?ear,
13
Have stormwater outlets been designed to prevent downslope erosion?
lWA
14
Are var ations to rule .1003 proposed?
90
ADDITIONAL
INFORMATION
y
15 1
Please use this space to provide any additional information about this low density gixajeol:
Project Name:
Project Location:
SOUTHWICK SOLAR, LLC
3055 BOY WOOD ROAD GRAHAM, NC 27253
Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location.
Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced iimm�)diately— These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that apply & correspC
Bioretention Cell
Dry Detention Basin
Grassed Swale
Green Roof
Infiltration Basin
Infiltration Trench
Level SpreaderNFS
Permeable Pavement
Proprietary System
Rainwater Harvesting
Sand Filter
Stormwater Wetland
Wet Detention Basin
Disconnected Impervious Area
User Defined BMP
Quantit)r
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Present:
Present:
0
0
0
0
0
0
0
0
0
0
0
0
0
Nc
Ye
O&M tables will
Location(s)
Location(s)
Location(s)
Location(s).
Location(s)
Location(s)
Location(s)
Location(s)
Location(s)
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to
the system or responsible party.
" Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
BEN GATT
A RIZEO PERSON AT PINE GATE RENEWAOL98, LLC
130 ROBERTS STREET
AN 11ILL.E, NC 28301
(828) 777.6152
EITILITY G.RENEWABLES=CDIl1
Signature: Date: `�}If I 'ZD 710
I, OO- tAgyaw a Notary Public for the State of If L !1
County of k J A At" A do hearby certify that C
personally appeared before me this ��� day of and
acknowledge the due execution of the Ope"tir4 and Maintenance Agreemen .
Witness my hand and official seal,
•
ISea
T' I y commission expires
STORM-EZ
Version 1.4
O&M Manual (1)
6/4/2020
Page 1 vF 2
Important maintenance procedures:
- The drainage area of the solar farm will be carefully managed to reduce the sediment load to the solar farm.
- After the first-time fertilization to establish the grass in the solar farm, fertilizer will not be applied to the solar
farm.
The solar farm will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element:
Potential problem:
How to remediate the problem:
The perimeter of the BMP
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then plant a
erosive gullies have formed.
ground cover and water until it is established. Provide lime and a one-
time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of approximately six inches.
long.
The entire length of the
Trash/debris is present.
Remove the trash/debris.
swale
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then re -sod (or
erosive gullies have formed.
plant with other appropriate species) and water until established.
Provide lime and a one-time fertilizer application.
Sediment covers the grass at
Remove sediment and dispose in an area that will not impact streams
the bottom of the swale.
or BMPs. Re -sod if necessary.
Vegetation is too short or too
Maintain vegetation at a height of approximately six inches.
long.
The receiving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
STORM-EZ 8/7/2020
Version 1.4 O&M Manual Page 2 of 2
PINE GATE RENEWABLES, LLC
RESOLUTION OF THE MANAGER AND MEMBERS
The undersigned, being the sole Manager and all of the Members of Pine Gate
Renewables, LLC, a North Carolina limited liability company (the "Company") do hereby
consent to and adopt the following resolution in lieu of separate meetings of the Manager and
Members pursuant to Sections 5.2 and 4.8 of the Second Amended and Restated Operating
Agreement of the Company dated effective as of January 1, 2018 (the "Second Amended
Operating Agreement"):
Appointment of Officers as Signatories
WHEREAS, in accordance with Section 5.3(a) of the Second Amended
Operating Agreement, the Manager desires to delegate the authority to carry out the day-to-day
business of the Company related to reviewing, negotiating and approving any and all types of
documents or instruments, including the authority to execute such documents or instruments on
behalf of the Company or its subsidiaries and affiliates, to Benjamin Catt, and designate him as
the Company's Chief Executive Officer.
NOW, THEREFORE, BE IT RESOLVED, that Benjamin Catt is hereby
designated as the Company's Chief Executive Officer and authorized and directed, for and in the
name of the Company and its subsidiaries and affiliates, to carry out the day-to-day business of
the Company related to reviewing, negotiating and approving any and all types of documents or
instruments, including the authority to execute such documents or instruments on behalf of the
Company or its subsidiaries or affiliates for matters related to such business.
[SIGNATURE PAGE FOLLOWS]
BTM:717195vi
IN WITNESS WHEREOF, the parties have duly executed this written consent
action, or caused it to be duly executed, effective as of August 16 , 2018.
MANAGER
PGR PARTNERS, LLC
By: James Luster
Its: Manager
MEMBERS
PGR PARTNERS, LLC
By: Japf es Luster
Its: Manager
DELANEY KATE HOLDINGS, LLC
By: ames Luster
Its: Managing Member
[Signature Page to Resolution of the Manager and Members of Pine Gate Renewables, LLC]
B M:7l7l9svl
�O
�O
�O
Zp 0
Q �
N
v
l o X
o
oa w nm K
a z o
� � v o
w C7 ZpZ s
Z
0
R€ UO
K d =K Z >5
00
Q �m M _�='
p ILZ 0�. �Uw
p m m K o Q Z
O z(D(�w
z U p
zw wz c���¢z ss
_�
_ in� a.O a 000zQmQ¢No�o.
�c¢i Z'izwwzOoa-
p da O O N p O K O Q z a� _
Q K }O KOK o
Q(n.(m2 U'UmN kago
im
R�
O
O
o Z 0
o U 0
z€ KQ
ci
-kD- w w ¢
N wZ K
a 1 KZ C7
a
O— p
O
p LL K
O a
X � O
a p
z U, O
> O
� O
w m
b�
m E
ca
E m
K
Zp 0
Q �
N
v
l o X
o
oa w nm K
a z o
� � v o
w C7 ZpZ s
Z
0
R€ UO
K d =K Z >5
00
Q �m M _�='
p ILZ 0�. �Uw
p m m K o Q Z
O z(D(�w
z U p
zw wz c���¢z ss
_�
_ in� a.O a 000zQmQ¢No�o.
�c¢i Z'izwwzOoa-
p da O O N p O K O Q z a� _
Q K }O KOK o
Q(n.(m2 U'UmN kago
im
R�
O
O
o Z 0
o U 0
z€ KQ
ci
-kD- w w ¢
N wZ K
a 1 KZ C7
a
O— p
O
p LL K
O a
X � O
a p
z U, O
> O
� O
w m
b�
m E
ca
E m
K
Z
o Z
o
0
CO N
LU
W J
0 U
CO