Loading...
HomeMy WebLinkAbout20200922 Ver 1_More Information Received_20200731Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* Version* 4 20180114 Is this project a public transportation project?* r Yes r No Is this a DOT r Yes r No project?* Reviewer List:* Garcy Ward: eads\gpward Select Reviewing Office:* Washington Regional Office - (252) 946-6481 Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r New Project r New Project Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r Stream or Buffer Appeal r For the Record Only (Courtesy Copy) Is this supplemental information that needs to be sent to the Corps?* r Yes r No New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Paul Williams Who is subrritting the information? Email Address: pcWlliams2@ncdot.gov Project Information Existing ID #: 20180114 20170001(no dashes) Existing Version: 4 1 Project Name: Bonner Bridge on NC 12 (B-2500 Phase IIB) Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown TIP#: B-2500B County (ies) Dare WBS#: 32635.3.9 (Applies to DOT projects only) Please upload all files that need to be submited. aick the upload button or drag and drop files here to attach document 199212ESCP-S_signed.pdf 13.75MB USCG Sector Email.pdf 230.38KB Only pdf or lqm files are accepted. Describe the attachments or comments: This request is tied to NCDWR Project No. 20200922, Version 1, Project Name: Rodanthe Bridge Transmission Line, South End The powerline relocation will include a directional bore from high ground near the existing NC 12 roadway to an underground vault in the wetlands near the southern end of the bridge. Over 800' of conduit pipe will need to be laid out near the existing underground vault under the bridge prior to the underground bore. Due to limited space in that area, the intent is to temporarily float the pipe into the Pamlico Sound. The capped HDPE pipe will float on its own and be tied off to the existing bridge piles in the water to prevent it from moving. Approximately 725' of the pipe will be floating in the Sound during the directional bore operation and not for an extended period of time. Sign and Submit V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in automatically.