HomeMy WebLinkAboutNCC191024_NOT Closeout Documents_20200804ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
July 24, 2020
SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER
INSPECTION REPORT
Sanderson Farms
Attn: Mr. Bob Billingsley, Director of Development & Engineering
127 Flynt Road
Laurel, Mississippi 39443
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
6,rfA� ok�—
Bradley West
Environmental Specialist
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality Division of Energy. Mineral and Land Resources
,f!o,--D—E Q:!i Washington Regional Office 943 Washington Square Ntall 1 Washington, North Carolina 27889
'' -d"Nme
252 94b.b481
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Lenoir Project: Sanderson Farms Freezer Addition River basin: Neuse
Person financially responsible: Sanderson Farms - Mr. Bob Billingsley, Dir. of Project #: LENOI-2019-006
Development
Address: 127 Flynt Rd, Laurel, MS 39443
1. Project Location: Industrial Dr, Kinston
Pictures: No
2. Weather and soil conditions: sunny, warm, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: July 24, 2020
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No
10. Comments•_ additional self -monitoring or self -inspections are required. Project is released.
Termination of coverage under NPDES General Stormwater Permit for Construction
Activities should be requested by the permittee via a Notice of Termination.
Reported by: Bradley West Others present:
Date of inspection: July 23, 2020 Time arriving on site: 11:20 AM Time leaving site: 11:30AM
cc: