HomeMy WebLinkAbout20100096 Ver 1_CAMA Application_20100204
Beverly Eaves Perdue
A4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
James Gregson rl ?
2 t" De Secretary 1.5 Governor 0 1 0 0 0 9 6 Director ?, February 3, 2010 H13 20 iC
MEMORANDUM:
DENR - WATER QUALITY
VrETLANDS AND STORWiNTF R8RMCH
TO: Cyndi Karoly, Supervisor
401 Oversight & Express Permits Unit
Division of Water Quality-Surface Water Protection
FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator
400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA/DREDGE & FILL Major Permit Application Review
Applicant: Silance, James E.
Project Location: 216 Shell Drive, adjacent to Chadwick Bay, in Sneads Ferry, NC,
Onslow County
Proposed Project: To install 195 linear feet of new bulkhead landward of coastal
wetlands
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by February 27, 2010. If you have any questions regarding the
proposed project contact Steve Everhart (910)796-7266, when appropriate, in-depth
comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended
changes are incorporated. See attached.
This agency objects to the project for reasons described in the
attached comments.
SIGNED
DATE
400 Commerce Ave., Morehead City, NC 28557--3421
Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer
NorthCarohna
Naturally
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: James E. Silance
2. LOCATION OF PROJECT SITE: The project site is located 216 Shell Dr., adjacent to Chadwick Bay, in
Sneads Ferry, Onslow County.
Photo Index-2006: 25-6496: 0(14) 2000: 28-389: K(15)1995: 28-377: L(23)
State Plane Coordinates - X: 2490123 Y: 285375 GPS File: P122212A
Lat: 3 49 1'23.0402 1 "N Long: 77°22'22.02869"W
3. INVESTIGATION TYPE: CAMA / D&F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12/22/09, 01/26/010
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received - Complete on 12/09/09
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Onslow County
Classification From LUP - Developed
(B) AEC(s) Involved: ES, PT
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing -N/A
Planned - N/A
(F) Type of Structures: PExisting - residential pier with gazebo and boat lift, SFR under lanned - new 75' bulkhead with two 60' wing walls landward of coastal construction
wetlands
(G) Estimated Annual Rate of Erosion: N/A Source -N/A
7. HABITAT DESCRIPTION: ^TT[AREA] Mn T Cn nTUF.R
(A) Vegetated Wetlands (§404) 1 1 -20 ft?
(B) Non-Vegetated Wetlands - open water
(C) Other (Highground)
1080 ft?
(disturbed)
(D) Total Area Disturbed: 2000 ft'
(E) Primary Nursery Area: YES
(F) Water Classification: SA Open: YES
James Silance
Page Two
8. PROJECT SUMMARY The applicant is proposing to install 195 linear ft of new bulkhead landward of coastal
wetlands
9. PROJECT DESCRIPTION:
The project site is located at 216 Shell Dr., Pelican Point Subdivision, adjacent to Chadwick Bay, in Sneads Ferry,
Onslow County. To get to the property from US Highway 17, Approximately 4 miles north of Holly Ridge, take a
right on Old Folkstone Rd. After crossing NC Highway 210, proceed 1.8 miles and turn right on Chadwick Acres
Rd. Stay straight to go onto Grandview Dr., turn left on Big Hammock Point Rd., turn left onto Shell Dr. and the
property is located on the right. The property is approximately 15,000 ft?. The current elevation of the property is
approximately 1.5' above normal high water (MHW). The project site is adjacent to residential properties on the
west and east sides and is bordered by Chadwick Bay on the north and Shell Dr. to the south. The highground
portion of the property is vegetated primarily with lawn grasses, ornamental plants, and live oaks (Quercus
virginiana). The property currently has a residential structure under construction and a pier with an open and a
covered boatlift. Coastal wetlands are present along the entire shoreline consisting of a 8' band of salt meadow
cordgrass (Spartina patens) in the high marsh and a 4' band of smooth cordgrass (Spartina alterniora) in the low
marsh.
The Onslow County Land Use Plan classifies the upland areas of this project as Developed. The waters of the project site
are classified as SA by the NC Division of Water Quality. The NC Division of Marine Fisheries HAS designated this area
of Chadwick Bay as a Primary Nursery Area, and the waters adjacent to the proposed project are OPEN to the
harvesting of shellfish.
PROPOSED PROJECT:
The applicant is proposing to install a new wooden bulkhead measuring approximately 75' in length approximately 8'
landward of normal high water (NHW) and landward of all coastal wetlands. The applicant is also proposing to install two
60' wing walls extending landward along the property lines. After installing the bulkhead and wing walls using a
vibratory hammer, the area behind the bulkhead will be filled using clean material from an upland source and resulting in
filling approximately 20 W of §404 wetlands at the northwest corner of the structure.
10. ANTICIPATED IMPACTS
The proposed bulkhead installation would result in the filling of approximately 20 ft? of §404 wetlands and the
disturbance of approximately 1,080 ft.2 of highground.
Submitted by: S. H. Everhart Date: February 2, 2010 Office: Wilmington
NARRATIVE SUMMARY
THE PROPERTY OWNER OF ADDRESS OF 216 SHELL RD, PELICAN POINT
SUBDIVISION, SNEADS FERRY, NC., MR. JAMES E. SILANCE, IS WANTING TO
BUILD A FUTURE HOME ON THIS SITE. HE IS REQUESTING TO INSTALL A
RETAINING WALL TO PROVIDE PROTECTION FOR THIS HOME. MR.
SILANCE HAS ALREADY RECEIVED A GENERAL PERMIT TO CONSTRUCT A
PIER, DOCK, AND A COVERED AND OPEN BOATLIFT.
THE FOLLOWING IS A DESCRIPTION OF THE MATERIAL AND
CONSTRUCTION METHODS USED FOR THIS JOB PROPOSAL:
INSTALL APPROXIMATELY A 75' WOOD RETAINING WALL WITH TWO 60'
WINGWALLS, ONE ON EACH SIDE OF PROPERTY. THE WALL HEIGHT WILL
BE APPROXIMATELY 3' OUT OF GROUND. THE WINGWALLS WILL
GRADUALLY TAPER BACK TO THE NATURAL CONTOUR OF THE GROUND.
TREATED 6X6 POSTS WILL BE INSTALLED EVERY 8'. DOUBLE WHALERS
USING TREATED 4X6' S WILL BE USED. WALL WILL BE MADE OF TREATED
TONGUE AND GROOVE BOARD. BOTH POSTS AND WALL WILL BE
INSTALLED USING A VIBRATORY HAMMER AND A SMALL TRACK HOE.
GALVANIZED DEADMAN RODS WILL BE INTSTALLED AT EVERY POST.
WALL WILL BE CAPPED USING TREATED 2X6'S AND NAILED IN PLACE
USING STAINLESS STEEL NAILS. WALL WILL BE BACKFILLED AND RAKED
OUT. SILT FENCE WILL BE USED TO PROTECT PROPERTY FROM SOIL
EROSION.
F? , Ta
OCT 2 7 2009
RCN N-t
APPLICATION for
Major Development Permit 2 0 , ° ° ° 9 6
Gast revised 12/17108)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Applicant 1: First Name MI
e, Last Name
'
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
ZIP Country
A . Phone No.
q 10 389 001q ext. FAX No.
Street Address (if different from above) City State ZIP
Email
2. Agent/Contractor Information
Business Name
'A tIT 11-4 C)%! O
Agent/ Contractor 1: First Name MI Last Name
A.
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
l 1 •t•
ZIP Phone No. 1 Phone No. 2
q10 -3027 - 314 7S ext. - ext.
FAX No. Contractor #
331-2 - p 13'5
Street Address (if different from above) City State ZIP
Email
<Form continues on backs OCT 2 7 2009
'? C *,"."Wit h,41NGT0N Ni --
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
At46 Lpk.?) ax (0 14 irk %, M.
Subdivision Name City State Zip
Phone No. Lot No. (s) (if many, attach additional page with list)
- - ext. , JVA , ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
IgNatural ?Manmade ?Unknown
a. is proposed work within city limits or planning jurisdiction:? If applicable, list the planning jurisdiction or city limit the proposed
„
XYes [INo i
work fails within- I
`
4. Site Description
r i
a. Total length of shoreline on the tract (ft.) j b. Size of entire tract (sq.ft.)
DOO S Q ?FT
715 I l3
,
I c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
?
NWL (normal water level) ?
75 X am
(if many lot sizes, please attach additional page with a list) i f BIZ ERNH`JIJ or ?NWL
e. Vegetation on tract
i
I I-A J N G 2A?bE.S OAIL 'T'ZE.t,
I
f. Man-made features and uses now on tract
i
PttlZ
OoC>L
C,,ov?1?D ? OeEt1 S3oPrV-ta'FT %oQ QERsooAL- ?5E
,
,
. I
g. Identify and describe the existing land uses adjacent to the proposed project site.
?t.Stfl>~,NT 1 AL
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
R' (Attach zoning compliance certificate, if applicable)
($Yes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes i$No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes %No ?NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes UNo ?NA
National Register listed or eligible property?
W.1r
<Form continues on next page>
OCT 2 7 2009
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ?No
(ii) Are there coastal wetlands on the site? ?Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes RNo
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
M 0N % C..l PA L. 6elze R.
o. Describe existing drinking water supply source.
MONX uPAL
p. Describe existing storm water management or treatment systems.
S"Eer IFLOLJ
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Govemment
Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
I r46T RU- l--')C. o 2E T Ph 11-4 t i.1G kZ) R U. Tp Q20?/ t DE PRO'CSLYNO t?1 O R
F0'T0r'?,c NA CMIE 6t-,,E.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored. -.3 Pr U- V-') 1 Ll r 2) , U-F? JSt t4& Y II2ATo12?
}tArnrn? d sM>? -r?c? "o c ??prn>ctx? u? 1 u? !3? ?"c o N Soc3
v tT t?N?1L CDMPLi`. i,: o,
d. List all development activities you propose.
? 55oCtAT?O AC:n V ili'tE,S W ITl-N ? A 1N 1>•1C? u7f?tL 1N5THLlAT1o1.?.
e. Are the proposed activities maintenance of an existing project, new work, or both?
P11EvJ ?D21L
f. What is the approximate total disturbed land area resulting from the proposed project? Wq.Ft or ?Acres
0ZC1OC7
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes No ?NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
5"E- u FLDLZ)
i. Will wastewater or stormwater be discharged into a wetland? ?Yes ;RNo ?NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ?NA
j. Is there any mitigation proposed? ?Yes RNo ?NA
If yes, attach a mitigation proposal.
10 ` `` feu `zn,:'
<Form continues on back>
OCT 271 2009
?r ??s•, It f'a't'tj° i°?A
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name C A R Ol_41nl VOnI ISI B Ee 5 4-4 /nl Phone No.
Address P.O. BOX Ya g '3ater, at') NC- a 8 ?t K 9/0"as!2- ZZ-) 2
Name m t Lti A ?A cco Phone No.
Address 114 ?111=1s p2 ?A1rC?DS Fr_2!Z`? t?1C
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
('zt-?stai_ PF_2mr,r Ccarof)) _-* S40 s.5
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
1 7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 9/29/o9 Print Name AC E/6HTD?
Signature
Please indicate application attachments pertaining to your proposed project.
KDCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culver E C . ED
?DCM MP-3 Upland Development
?DCM MP-4 Structures Information OCT 2 7 2009
WWAAINGTON, C
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel
(NLW or Canal Boat Basin Boat Ramp Rock Groin Rock
Breakwater (excluding
shoreline
NWL stabilization
Length
Width
Avg. Existing NA NA
Depth
Final Project NA NA
Depth
1. EXCAVATION 9This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of the excavation in these areas:
d. High-ground excavation in cubic yards.
2. DISPOSAL OF EXCAVATED MATERIAL Whis section not applicable
a. Location of disposal area.
b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
?Yes ?No ?NA ?Yes ?No ?NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
?Yes ?No ?NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected. (ii) If yes, how much water area is affected?
.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of disposal in these areas: n Ix
b C Vii' U
OCT 2 7 2009
DCM W!LMoN' yr!_11 ?
3. SHORELINE STABILIZATION []This section not applicable
(If development is a wood groin, use MP-4 - Structures)
a. Type of shoreline stabilization:
Bulkhead []Riprap []Breakwater/Sill []Other:
c. Average distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill 4- Riprap
Breakwater/Sill Other
i. Source of fill material.
U. Lell9m.
Width:
d. Maximum distance waterward of NHW or NWL:
f. (i) Has there been shoreline erosion during preceding 12
months?
[]Yes ®No []NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4. OTHER FILL ACTIVITIES ®,This section not applicable
(Excluding Shoreline Stabilization)
a ri) Will fill material he hrouaht to the site? nYes ?No []NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (bti), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
[]CW []SAV []SB
[]WL []None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
%RcYKOs Lzrm v valzcATk
c. (i) Will navigational aids be required as a result of the project?
[]Yes %No []NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? []Yes ®No []NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Date
9 1-1-A 10!5
Project Name
AL /3E16HToC
Applicant Name
k(r ?$bp
Applicant Signature OCT 2 7 2009
I
'
T?
Ir
ti
i t
t i
i
=
v i
1
1
I
i
I
7
1
i
1
1
k
i
d
?o (a :5 A ? D?.
OCT 2 7 2009
43
i5
l
b
t. if
V
r
?
lut
..
Yi
1
?
y
1 ?
.9
J
.t
R
it
OCT Z 7 20W
" 1