HomeMy WebLinkAbout19981047 Ver 1_Complete File_19981027State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
1 ? •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
November 4, 1998
Caldwell County
WOC 401 Project # 981047
APPROVAL of 401 Water Quality Certification
Mr. Martin Bolick
NC DOT
Boone District Office
PO Box 1460
Boone, NC 28607
Dear Mr. Bolick:
You have our approval, in accordance with the attached conditions, to place fill material in 0.036
acres of wetlands or waters for the purpose of paving SR 1355, as you described in your application dated
October 27, 1998. After reviewing your application, we have decided that this fill is covered by General Water
Quality Certification Number 3103. This Certification allows you to use Nationwide Permit Number 14 when
the Corps of Engineers issues it. In addition, you should get any other federal, state or local permits before
you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal
Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the
accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you
change your project, you must notify us and you may be required to send us a new application for a new
certification. If the property is sold, the new owner must be given a copy of the Certification and approval
letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in
the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h). For this approval to be valid, you must follow the conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and
binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincerely,
re on Howard, Jr. P
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Asheville DWO Regional Office
Mr. John Dorney 981047.Itr
Central Files
Division of Water Duality • Environmental Sciences Branch
Environmental Sciences Branch, 4401 Reed Creek Rd.3alei Raleigh, NC 27607 Telephone 919-733-1786
FAX
An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper
JAMES B. HUNT JR.
GOVERNOR
BOONE DISTRICT OFFICE
POST OFFICE BOX 1460
BOONE, NC 28607
E. Nods TOLSON
SECRETARY
October 21, 1998
Mr. Steve Chapin
U.S. Army Corps of Engineers
151 Patton Avenue, Room 143
Asheville, NC 28801-5006
Dear Mr. Chapin:
The N. C. Department of Transportation is proposing to grade, drain, base, and
pave SR 1355, Pinefrost Rd., in Caldwell County when the necessary permits are
obtained. This project will require replacing two pipe which carry Coffee Creek. Coffee
Creek has the DEM classification, C. Due to the proposed work, we are requesting a
404 Nationwide Permit.
I am sending a joint application form, typical roadway section, straight line sketch
with proposed erosion control, general notes on erosion control, notes on pipe
installation, and a marked county map.
By copy of this letter, I am requesting Mr. Joe Mickey, Western Piedmont Region
Coordinator, to comment directly to you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting a 401 Water Quality Certification from
the Division of Water Quality for this project.
We would like to begin construction when the necessary permits are obtained. If
addition information is required, please let me know. Your early review and
consideration will be greatly appreciated.
Yours truly,
Martin L. Bolick
District Engineer
MLB/MLM:mm
Enclosures
t
r
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
R «
Page 2
Mr. Steve Chapin
SR 1355, Pinefrost Road
October 21, 1998
cc: Mr. Joe Mickey, Western Piedmont Region Coordinator, NCWRC
Mr. Richard Phillips, P.E., Regional Engineer, NCDENR
Mr. John Domey, Division of Water Quality, NCDENR
Ms. Renee Gledhill-Earley, Environmental Review Coordinator, NCDCR
Mr. W. E. Hoke, P. E., Division 11 Engineer
Mr. Neil Trivette, Area Roadside Environmental Engineer
Mr. Kelly Winkler, County Maintenance Engineer
DWQ ID: _._. CORPS ACTION ID:
NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #)
PRE-CONSTRUCTION NOTIFICATION APPLICATION
FOR NATIONWIDE PERMITS THAT REQUIRE:
1. NOTIFICATION TO THE CORPS OF ENGINEERS
2. APPLICATION FOR SECTION 401 CERTIFICATION
3. COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT
SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD
OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7)
COPIES MUST BE SENT TO THE NC DIVISION OF WATER QUALITY,
ATTN: JOHN _DORNEY, 4401 REEDY CREEK ROAD, RALEIGH, NC
27607, PLEASE PRINT OR TYPE.
1. OWNER'S NAME: NC DEPARTMENT OF TRANSPORTATION
2. MAILING ADDRESS: PO BOX 1460
SUBDIVISION NAME N/A
CITY: BOONE STATE: NC ZIP CODE: 28607
PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM
MAILING ADDRESS ABOVE):
SR 1355, Pinefrost Place
3. TELEPHONE NUMBER: (HOME) (WORK) (828) 265-5380
4. IF APPLICABLE: AGENTS NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER:
MARTIN L. BOLICK
PO 13OX 1460
BOONE_ NC 28607
(828) 265-5380
5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP
OR AERIAL PHOTOGRAPHY WITH SCALE):
COUNTY: Caldwell Co. - NEAREST TOWN: Lenoir
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ECT.) SR 1355, Pinefrost Place
6. IMPACTED OR NEAREST STREAM/RIVER Coffey Creek RIVER BASIN: Catawba River Basin
7. (a) IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA),
HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER
SUPPLY (WS-I OR WS-II)? YES ? NO X IF YES, EXPLAIN: N/A
(b) IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL
MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)? YES ? NO X
(c) IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF
COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? N/A
8. (a) HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS
PROJECT? YES ? NO X IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND
ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION):
(b) ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE?
YES ? NO X IF YES, DESCRIBE ANTICIPATED WORK:
9. (a) ESTIMATED TOTAL NUMBERS OF ACRES IN TRACT OF LAND: 4.40
(b) ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE
0.07
10. (a) NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY:
FILLING: , EXCAVATION:.036
FLOODING: _ OTHER :
DRAINAGE ____ TOTAL ACRES TO BE %4PACTED:.036
(b) (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED,
PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION:
LENGTH BEFORE: FT AFTER: FT
WIDTH BEFORE (based on normal high water contours): _ FT
AVERAGE DEPTH BEFORE: FT AFTER: FT
(b) (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY)
OPEN CHANNEL RELOCATION:., PLACEMENT OF PIPE IN CHANNEL: X
CHANNEL EXCAVATION: - CONSTRUCTION OF A DAM/FLOODING:
OTHER: Involves lacing two crossline pipes.
11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED
DRAINING TO THE POND? N/A WHAT IS THE EXPECTED POND SURFACE AREA?
12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL
EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY 11 DRAWINGS ONLY)
Replace two pipe carrying streams and upgrade to accceeptable maintenance condition
13. PURPOSE OF PROPOSED WORK: This work is part of a project to grade, drain, base, and pave SR
1355, Pinefrost Place.
14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN
WETLANDS (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS)
RoadM needs to be widened to achieve an a le section width Pipes need to be upgraded to an
a lc maintenance condition Erosion control measures 9 shown on plan sl}puld minimize the
impact to wetlands.
15. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR
NATIONAL MARINE FISHERIES SERVICE REGARDING THE PRESENCE OF ANY FEDERALLY
LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL
HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT.
DATE CONTACTED: Lay py of this letter.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER
(SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA
WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED By M of this
letter.
17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF
PUBLIC (STATE) LAND? YES XNO ? (IF NO, GO TO 16)
(a) IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL
DOCUMENT PURSUANT TO THE RE MENTS OF THE NORTH CAROLINA
ENVIRONMENTAL POLICY ACT? YES NO, Project qualifies as non-major action under minimum
criteria 15.
(b) IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA
DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE YES ? NO ?K
IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE
CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT.
QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE
DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH
CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH,
NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369.
18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED
ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OF FILL MATERIAL INTO
WETLANDS:
(a) WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES, AND
PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38).
ALL STREAM (INTERNIITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON
THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OF 1 INCH EQUALS 100 FEET
OF THEIR EQUIVALENT.
(b) IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PRODUCT.
(c) IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
(d) ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED.
(e) WHAT IS LAND USE OF SURROUNDING PROPERTY? Residential
(i) IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? N/A
SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE.
NOTE: WETLANDS OR WATERS OF THE US MAY NOT BE IMPACTED PRIOR TO:
I. ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT,
2. EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF WATER QUALITY
CERTIFICATION, AND
3. (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH
CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED
ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT
PROGRAM,
OWNER'S/AGENT'S SIGNATURE DATE
(AGENT'S SIGNATURE VALID ONLY
IF AUTHORIZATION LETTER FROM
THE OWNER IS PROVIDED).
North Carolina Department of Transportation
Erosion and Sedimentation Control Plan
Project: Pi Nc 9 5 T Pl-frc e Road: / c3 SS County: Caldwell
Prepared by: 7u /v/i o r 5 hf A ydt- Date: 1'0 - /L} - 4 Y
Approved by: ,"4i Date: A? - ZO
County Maintenance Engineer
Date: /p--
District Engineer
Date:
Roadside Environmental Engineer
Std. # Description Svmbol
1630.03 Temporary Silt Ditch----------- - --- -TS D
1630.05 Temporary TD
1605.01 Temporary Silt Fence-----------------
1622.01 Temporary Slope
1630.01 Silt Basin Type-A. --------------- -------- --------------
1630.02 Silt Basin Type-B----------------_-----------------
1633.01 Temporary Rock Silt Check Type _A---_______________
1633.02 Temporary Rock Silt Check Type- B----------------
1634.01 Temporary Rock Sediment Dam Tvpe-A---_-_______ M...
1634.02 Temporary Rock Sediment Dam Type-B--------------
1635.Ot Rock Pipe Inlet Sediment Trap Type _A A
1635.02 Rock Pipe Inlet Sediment Trap Tvpe-B--------------- • • • B ; ;
1636.01 Rock Silt Screen --__________?_?_________-__________ ..-
1630.04 Stilling Basin-------=---------- ----- --
Rock Inlet Sediment 'Trap:
1632.01 Tvpe-A-------- ----------- ---------------------------A a or A
1632.02 Type-B---------------------------- ----------- -------- ------B a or 8)
1632.03 Tvpe-C--------------------------- --------C 0 or C)
868.01 Rip Rap---------------------------------------------- RR
Pipe Outlet Energy Disipator--_`--
Ditch Liner------------------------------ ------
Pipe Outlet or Inlet Stabilization-- - D
-NOTE: Silt Basin Type B: YxYby 6' long unless otherwise noted by Engineer
?I
d
z
a
o a
"
H i
U
w
U
O
F
F. g
U 1 d '
N _-r
W
.
I
d
Q
v
1
GENERAL NOTES ON EROSION CONTROL
Silt Basin Type B's will be constructed to the dimension of six feet by three feet by
three feet unless otherwise noted on the plans.
Generally, the order of installation of the erosion control measures will be as follows:
Temporary Silt Basins shall be installed before clearing and
grubbing begins.
Silt Fences and Temporary Silt Ditches shall be installed as soon
as ditchline is established.
Temporary Stone Ditch Checks shall be installed as soon as soon as
ditchline is established.
Pipe Outlet and Inlet Protection will be done as soon as pipe is installed.
Seeding and Other Permanent Erosion Control Measures are to
be implemented as soon as practical.
Temporary Rock Silt Checks (Type B) will be spaced as required by percent of grade
as Described on page VI-16 in the Erosion and Sedimentation Control Guidelines.
No. 5 Stone, or equivalent, will be used in conjunction with Temporary Rock Silt Check
Type-B in location where water is leaving the project or entering pipe.
Where the plan calls for a rip-rap lined ditch to be installed, temporary silt basins and
rock check dams will be constructed and maintained until the final rip-rap lined ditch
can be constructed.
PIPE INSTALLATION NOTES
1) Install erosion control devices. In streams, where necessary, rock
silt screens will be used.
2) Remove material and existing pipe while limiting, as much as
possible, material and sediment from entering the stream and/or
escaping from project.
3) Prepare pipe foundation while again taking care to limit, as much
as possible, material and sediment from entering the stream and/or
escaping from project. Where possible, new grade will be below
existing streambed. If needed, bedding material will be clean
stone.
4) Place the new pipe and compact backfill.
5) Install slope protection on outlet and inlet ends of pipe. Also
complete installation of erosion control measures and perform
maintenance as needed on existing measures.
6) Establish permanent vegetation as soon as possible.
b
R
I FP (t- EP
?-? o a
GioO b9p)IAce-d /V/ti
Ne ?.,? I g / iv ?, ? n e
3%
j?oa
Nc? ,Sfty
to a
3 too
?e lAC? i `
'r 50
A-1Da
4too
a
Otto
Rkj STATTON
q-roo
$ (? 13 S
Ri„t .S TA-rTc N
1 ?-t o 0
? ? f, a ?eP?ace I S ?? CMP ? >?
/8 "Uv?P
?c*a,
IL/to0
131-00
?$ D
/ 2t0 0
A
1 1+00
1 0+00
a
Replace exist/*n? 301E if -36"4,f
+1,5,. w double line of:'
- 9 too qS^>?1o7??C??PA - 40 /o??•
EP ? EP
a
lI
R?j 'STA tON
a ?-fto 0
A (, too
),S+o 0
CMP
74 to O ?l3 "crnP
.'(3 tD 0
,22400
o Qr-PtAc a ?i'irv P, ;De Z ?T1?
Ne-? 1iriN
? 1 +o 0
2O+O0
00
1 Y-4'D o
0
f-
,S1-1EET 3 cF `S
0
s
?P ? EP
d?
R1(,? .S TAT i o N .
3fs+oo
Rep ?a?e ex ?s-?hJ 3v?F
`?fo? of ?o"cmP
36+00
34 too
p .?3 + 0 0
f--
3ztoo
0 3/+o o
cn
3o-+oo
'
7s r
R e p 1. a? ti aY ,.-? w T h It/e
zottoo
2{?-tov
217
, IHF-sT '-I ("F S
EP ? EP
p
?o
i
P
N z tOz
y ?,roo
y o-?-ao
? ?+ oa
D
H
c3>*00
4- -0
.SN?6T ? r'F S
`_.
N W T (V
y ?.e 'a G ) h
o O-
O 0
0 ., in
?' y7I 9 r' Z
Ell O ? -f AP
Q? $ ?I z ? ? ; \ t ? SS 11
2 I v 5 _ '
b ?
w
V) co
?Q • ,b rn u n c? '?
'4W 0
?. Ol L Q _.?? _ 2 , ml 0
\ L \
?? ml
2 O
?" / ?- , t W of 2
_ BSI a? -
Y 0
oz
?y1N?0`Y ~ O 1.6
\?? ®I
T SVj O -I
38p)p Q ifj ? .? ' .1 $ \
NM?r ti bSv,b, tI _? Sby N ??Na /I
^I ?m Z wm
JO / LL
mY n ? ?I
Si,
b 1 y n ? ? •,x; ^ ? / • dye F-. ? - ` a_ ?I _ .
of
LLJ
fVpS?IM it x /.
A. no
/
CO °D
Oa0
•? N
. i
xw \ 1 m?m I
Izz
t •? ; tw? 1