HomeMy WebLinkAbout19981025 Ver 1_Complete File_19981119STATE OF NORTH CAROLINA
DEPARTMENT OF TP ANSPORTATION
JAMES B. HUNT) R. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 E. MORRIS TOLSON
GOVERNOR SECRETARY
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
Department of Environment and Natural Resources
Hestron Plaza II
151-B Highway 24 '
Morehead City, North G 4n- 2
15 -i
Dear Mr. Tyndall { , u(J. 4
Subject: Carte Replacement of Bridge No. 15 on SR 1152 over
Ae1?: State Project No. 5.2151.
r,.,,
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,,
j (k?a Yk
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP-1
APPLICATION
(ro be completed by all applicants)
b. City, town, community or landmark
1. APPLICANT Otway
C. Street address or secondary road number
a. Landowner: SR 1325 -
Name T.C. Dept of Transportation d. Is proposed work within city limits or planning
jurisdiction? Yes _ X _ No
Address p n Box 25201
e. Name of body of water nearest project (e.g.
City Raleigh State N river, creek sound, bay) Tributary of Ward -CL
Zip 27611 Day Phone (919)733-3141
Fax (919)733-9794
b. Authorized Agent:
Name
Address
City State
Zip Day Phone
Fax
C. Project name (if any) Carteret Bri dge
Note: Permit will be issued in name of landowner(s),
and/or project name.
2. LOCATION OF PROPOSED
PROJECT
a. County
Revised 0.
3. DESCRIPTION & PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
Replace existingdeteriorated timber bridge
with 1 (a) 50' cored slab (abutt Z=J-__
b. Is the proposed activity maintenance or an
existing project, new work, or both`? Both
C. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
methods of construction and daily operations
of proposed project. If more space is needed,
please attach additional pages. Proposed
12rQiect will be for public transportation.
Construction will utilize typical road
construction equipment such as track hoe,
dump truck. motor Qrader etc
FORM DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
d. Soil type(s) and texture(s) of tract
Sand
e. Vegetation on tract Distichis spicata.
Juncus roemerianus Baccharis halimifolia
in. Describe existing wastewater treatment facilities
N/A
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) eurf?^P n,,,^ff along eject
Describe existing drinking water supply source.
N/A
Man-made features now on tract
45 foot timbgLbri?gP
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
Conservation Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes X No
(Attach zoning compliance certificate, if applicable.)
j. Has a professional archaeological assessment
been done for the tract? Yes _ X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X No
Are there wetlands on the site? _2L Yes _ No
Coastal (marsh) X_ Other
If yes, has a delineation been conducted? No
(Attach documentation, if available)
In addition to the completed application form,. the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
FORM DCM-MP-1
site. Include highway or secondary road (SR)
number, landmarks, and the like.
* A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners.must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber & Rena Hall
Address 565 Firetower Road
Phone -Beaufort- NC 2U 1
Name Beverly & Donna Rimmer
Address P () Box 148
Phone Atlantic NC" 2U 11
Name Jerrv Lawrence, General Contractor
Address P O Box 598
Phone Beaufort, NC 2851 h
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am autkiorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the 6 day of 19
Print Name William D Gilmore- P.F. --
Signature _I)CA
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
R.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be
Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A
other sections of the Joint Application that relate to
this proposed project.
g. Length of proposed bridge 1 & 50'
1. BRIDGES
h.
Width of proposed bridge Clear roadway = 20'
a. Public _X- Private
i.
Height of proposed bridge above wetlands
b. Type of bridge (construction material) +/-2.0,
Cored slab concrete
j.
Will the proposed bridge affect existing water flow?
Yes X_ No
C. Water body to be crossed by bridge
Tributary to Ward Creek If yes, explain
d. Water depth at the proposed crossing at MLW or
NWL 2.0'
k.
Navigation clearance undern eath proposed bridge
e. Will proposed bridge replace an existing bridge?
X_ Yes No
1.
Will the proposed bridge affect navigation by
If yes,
(1) Length of existing bridge 45.8' reducing or increasing the existing navigable
(2) Width of existing bridge 19,2' opening? X Yes No ill
lace
d
(3) Navigation clearance underneath existing rep
ge w
If yes, explain A single sl2an bri
an bridge Navig a openine.
tin¢s
i
th
bridge +/- 2.4' p
s
e ex
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber
bridge (to be removed),
in.
Will the proposed bridge cross wetlands containing
no navigable waters? Yes X_ No
f. Will proposed bridge replace an existing culvert(s)? If yes, explain
Yes X_ No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above n.
Have you contacted the U. S. Coast Guard
the MHW or NWL concerning their approval?
Yes X_ No
If yes, please provide record of their action.
orm DCM-MIJ-5
Will the proposed culvert affect existing navigation
CULVERTS N/A potential? _
If yes, explain
L. Water body in which culvert is to be placed
?. Number of culverts proposed
Type of culvert (construction material, style)
3.
Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
Yes No
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X_ No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
_2L Coastal Wetlands _ SAVs - Other Wetlands
If yes,
(1) Length of area to be excavated 5-0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yards
c. Will the placement of the proposed bridge of culvert
require any highground excavation?
X Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated 1 5'.
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T r..t., A ?;rP to hP riPtrrmint-d
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
Revised 03/95
Form DCM-MP-5
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X_ No
If yes, give dimension if different from No. 2
above.
b. Will the proposed project require the
any existing utility lines? - Yes __2L No
If yes, explain in detail
Will the proposed project require the construction of
any temporary detour structures?
Yes X_ No
If yes, explain in detail None expected.
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X_ No
MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
£ Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upgrade
and stabilization
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X_ Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
4. GENERAL -
a. Will the proposed project involve any mitigation?
Yes __2?_ No
If yes, explain in detail
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
_ Management Erosion Control Measures
f. What type of construction equipment will be.used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction _
equip i ?^track hoe,dilmp truck. motor
grader etc.)
g. Will wetlands be crossed in transporting equipment
to project site? Yes . _ X No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X_ No
If yes, explain in detail
MOOT, Carteret 7ounly- Replace Bridge No. 15
Applicant or Project Name
Signature
all 1r
i
I
I
N
I
I
11
0
2
I
4
THE STRAITS i- -
CArig-ZTERET COUPsine 2 3 4
NORTH CAROLINA
t,S..,n Qu,rler Uu'1 n1n'(Is'°-Avilp Liao /U
C l\ 1 /)/r A ?? I \ r Avon
a , ruc 11., `'.
rt ACV I ?' `oRorr B°v t O 1
' t l _ Y P,mliCO Bea h 1 \ i 2
P°IW
`?sw N.?,.uia
Dll ? I - W
IoM 1 . NAM W"
GRE'r 1.
ti- you ? I O
creek lav M. (J t
Aid M.
?? Avr Dr, 17
R
oyil 3
? Notn,U?ln ? l
_ MS sic
? I1ollyv"le by n \ \
(1 (Cash Caner) '?anQem ere
llu R.
+ Manbelo 1 . \ ouacoke
anltbaO ,3,ybol0 Af,/ of . 1' 1/
on . F/t/ t 1.
1 1 A111.6ce
A M L I v
O
Merrill blh? rlon svJlC? Por lsmou lhr???r l1 ohr
55?m(co? R°n°n .. r1. I
lent al/ Buv Q,[.y / ,yids
?A?,lro• _ 1s':.f lleV t t._..?i---?- /?/ t?? I
I? h /,,/rr
1 I
II
tr•n11t? ''t„s _ fi
11 0?' nco 'I R
r'•
crrrnovsE ?. x
O
F"" ...
wild"
t n • -
LINO-PTH CARO
S ?0 - ZO JD SCA((OC 1rn(S 04C .hrH (QUALS APPROI 1 J 141LES
0 --- --
_ Ilk, C- .i .. u'.ra.S nS('-h LQU-t S APPROK :1111.0 mF fERS
t.c.p.0.r.
)IV. OF N[6UWAY5
ltrew-r COUNTY
3R. 4"15 ON SK 1 152
r nt TK 1,8 o F lit'RD CA
vR.1 L' 199'6
iFteer _t- of I
a?
D O/1/
?--_ ! 3 -7
G
0
C
V? f
:r
1!1 F
< o t.L
- Q
-i4 uj
a
Mp-
Q ?1 0?„
r? }::: ? J _.?
CIL
? r
.
0 3- , "ell
? N-
•? li I
? . ? r• t 7
....•.? .1 c of G.
f C1 _ ?.
3 • ? I•? ? •? v T
X
-4 A
ION. Z/
0
0
? J
N
-r
J?
<
L
d (?
1
Z
r
J ?
? j
v
M
hi
n
tN? Q
• \ Q1
4 ?
i
N
o ?qr,`l
!J r
1
C
Q !U
} ?
ro
C? J
u7
? J
IL 0
Lo
?u VN
W
j- r
W
Q w
Q
am-fere you wi t52.
QR. fc5 N S
orr - cB n e ?R
EOGE 0 r EDGE o r
1n1
WE T LAN05 6 rLA NOs
SO o ? `' .:. _ p G1
SEC j / v/,/ -/?
i
y9o?
S
so-? ScAL? ?o
u-6-0"NoQrz
/o' vi-97,
I
0 w,9DV1,I)1 r-11 L
I
P R A P. G R, --?
E o,E OF,
WCTLAIJ U-1
00 wErcaNOS
?;-
U)Q
r
-O- Sol
50.
l0' y?lZT.
??%% ?? ,•?i?j? it/? C?
FILL IgBO?E o N V/ 5-6, 5' C U, yD,5,
t
FILL w. = 7(-- u- Y DS• /-
T I L L S= / 3 c- `f S /-
C?P.fJ ? ??T.Z ? lQi?LK
C?,TP?R.? routiriY
gR? ? C ? ON SR:: ? t?
?i
* IV 11 iti 7? d O ` Ltj
-
I 1 ?
UI-? W ' h ?
Lo S 1Q,
v
I I
.
C :
N Z 7 %' ??! rL! V/
Ia?1
L
J
J I
0
A?
z
I
J
L
a?
Af`&D. o.`f
0
0
v
J
l?
c
c
-i
i
0R- ..#t ?N sR ? ??
,
J
DIVISION OF COASTAL MANAGEMENT
MEMO TO:
FROM:
Cyndi Bell
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
November 16, 1998
Doug Huggett
J?
SUBJECT: Proposed replacement of Bridge No. 15 on SR 1152 over a
Tributary of Wards Creek in Carteret County.
In September of 1996, the NC Department of Transportation applied for a CAMA
permit to replace the above referenced bridge with four pipe-arch culverts. The
subsequent application review resulted in numerous agencies objecting to the project
design due to the anticipated adverse environmental impacts to anadromous fish
movement. Your agency sent the applicant a letter on November 26, 1996 (DWQ
Project No. 961000) asking that they consider utilizing a bridge design as opposed to
the originally proposed culvert design. Based upon your letter, as well as
correspondence with this office, NCDOT voluntarily placed their project on hold while
alternative designs were considered. Ultimately, a revised application was submitted
that would utilize a cored-slab bridge design to replace the existing bridge. A small
amount of coastal wetland would be impacted along the two end embankments.
It,- K ate.
Enclosed please find for your review and action a copy of NCDOT's revised permit
application, as well as a field investigation report for the original project application.
It would be appreciated if you could forward to me a copy of your final action on this
matter. If you should have any questions or concerns on the revised application, please
feel free to give me a call.
P.O. BOX 27687, RALEIGH, NC 2761 1 -7687 / 2728 CAPITAL BLVD., RALEIGH, NC 27604
PHONE 919-733-2293 FAX 919-738-1495
AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST-CONSUMER PAPER
,?y..
JAMES B. HUNTJR }h?
?1. OVJERNOR
t ?.
VMw
r. g
1t
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH, N.C. 27611-5201
GOVERNOR
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
Department of Environment and Natural Resources
Hestron Plaza II
151-B Highway 24
Morehead City, North Carolina 28557
Dear Mr. Tyndall;
E. NoRU1s TOLSON
SECRETARY
RECEIVED
OCT 3 0 1998
COASTAL MANAGEMENT
Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over
Tributary of Ward Creek. State Project No. 5.2151.
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
6)
1WW I.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
P .
'FORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Name N.C. Dept. of Transportation
Address P. O. Box 25201
City Raleigh State NC
Zip 27611 Day Phone (919) 733-3141
Fax (919) 733-9794
b. Authorized Agent:
Name
Address
City State
Zip Day Phone
Fax
C. Project name (if any) Carteret Bridge # 15
Note: Permit will be issued in name of landowner(s),
and/or project name.
2.
a.
LOCATION OF PROPOSED
PROJECT
County Carteret
b. City, town, community or landmark
Otway
C. Street address or secondary road number
SR 1325
d. Is proposed work within city limits or planning
jurisdiction? Yes X_ No
e. Name of body of water nearest project (e.g.
river, creek sound, bay) Tributary of Ward C?
3. DESCRIPTION & PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
Replace existine deteriorated timber bridge
with 1 & 50' cored slab (abutt type)
b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
C. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
methods of construction and daily operations
of proposed project. If more space is needed,
please attach additional pages. Proposed
prQlect will be for public transportation
Construction will utilize typical road
construction equipment such as track hoe
dump truck, motor grader etc
Revised 03/95
FORM DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
a.
b
d.
f.
9.
h.
1.
k.
Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
Soil type(s) and texture(s) of tract
Sand and muck
Vegetation on tract Distichis spicata,
Juncus roemerianus. Baccharis halimifolia
Man-made features now on tract
45 foot timber bridge
What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
_ Conservation Transitional
Developed Community
X Rural Other
How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes X No
(Attach zoning compliance certificate, if applicable)
Has a professional archaeological assessment
been done for the tract? Yes _X No
If yes, by whom?
Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
_ Yes _X No
Are there wetlands on the site? Yes _ No
Coastal (marsh) X Other
If yes, has a delineation been conducted? No
(Attach documentation, if available)
M. Describe existing wastewater treatment facilities
N/A
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff along prq.ject
o. Describe existing drinking water supply source.
NIA
5 ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Revised 03/95
FORM DCM-MP-1
site. Include highway or secondary road (SR)
number, landmarks, and the like.
* A Stormwater Certification, if one is necessary.
* A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber & Elena Hall
Address 565 Firetower Road
Phone Beaufort. NC 28516
Name Beverly & Donna Rimmer
Address P. O. Box 148
Phone Atlantic, NC 28511
Name Jerry Lawrence Genera] Contractor
Address P. O. Box 598
Phone Beaufort. NC 28516
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
* A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of ?°?? 19 I
Print Name _ William D. Gilmore P
Signature D'` t
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Revised 03/95
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to
this proposed project.
Public X Private
b. Type of bridge (construction material)
Cored slab concrete
c. Water body to be crossed by bridge
Tributarv to Ward Creek
Water depth at the proposed crossing at MLW or
NWL +/- 2.0'
Will proposed bridge replace an existing bridge?
X_ Yes No
If yes,
(1) Length of existing bridge 45.8'
(2) Width of existing bridge 19.2'
(3) Navigation clearance underneath existing
bridge +/- 2.4'
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber
bridge (to be removed).
Will proposed bridge replace an existing culvert(s)?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain) N/A
g. Length of proposed bridge 1 @ 50'
h. Width of proposed bridge _ Clear roadway = 20'
Height of proposed bridge above wetlands
+/- 2.0'
j. Will the proposed bridge affect existing water flow?
Yes X_ No
If yes, explain
k. Navigation clearance underneath proposed bridge
+/- 2.4'
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? X Yes No
If yes, explain A single span bridge will replace
the existing 3-span brie. Navigable opening.
in. Will the proposed bridge cross wetlands containing
no navigable waters? Yes _Y? No
If yes, explain
n. Have you contacted the U. S. Coast Guard
concerning their approval?
Yes XNo
If yes, please provide record of their action.
Revised 03/95
. Form DCM-MP-5
j. Will the proposed culvert affect existing navigation
Z CULVERT N/A potential? Yes No
If yes, explain
a. Water body in which culvert is to be placed
b. Number of culverts proposed
3. EXCAVATION AND FILL
C. Type of culvert (construction material, style)
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X_ No
d. Will proposed culvert replace an existing bridge? If yes,
Yes No (1) Length of area to be excavated
If yes, (2) Width of area to be excavated
(1) Length of existing bridge (3) Depth of area to be excavated
(2) Width of existing bridge (4) Amount of material to be excavated in cubic
(3) Navigation clearance underneath existing yards
bridge
(4) Will all, or a part of, the existing bridge be b. Will the placement of the proposed bridge or culvert
removed? (Explain) require any excavation within:
.X Coastal Wetlands _ SAVs - Other Wetlands
If yes,
(1) Length of area to be excavated 5.0'
e. Will proposed culvert replace an existing culvert? (2) Width of area to be excavated 27
0'
Yes No .
(3) Amount of material to be excavated in cubic
If yes, yards 20 cubic yards
(1) Length of existing culvert
(2) Width of existing culvert c. Will the placement of the proposed bridge of culvert
(3) Height of the top of the existing culvert above require any highground excavation?
the MHW or NWL X Yes No
(4) Will all, or a part of, the existing culvert be If yes, (For Bent Supports)
removed? (Explain) (1) Length of area to be excavated 20'
(2) Width of area to be excavated 1.5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic vard
f. Length of proposed culvert
d. If the placement of the bridge or culvert involves
g. Width of proposed culvert any excavation, please complete the following:
(1) Location of the spoil disposal area
h. Height of the top of the proposed culvert above the *Upland site to be determined
MHW or NWL (2) Dimensions of spoil disposal area
Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
Revised 03/95
* NOTE: Any suitable material will be used as
as backfill for the project.
Form DCM-MP-S
(4) Will the disposal area be available for future b.
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X_ No
If yes, give dimension if different from No. 2
above.
Will the proposed project require the
any existing utility lines? _ Yes X No
If yes, explain in detail
Will the proposed project require the construction of
any temporary detour structures?
Yes _X No
If yes, explain in detail None expected.
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X_ No
MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled.
(3) Purpose of fill
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upgrade
and stabilization
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X_ Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X_ No
If yes, explain in detail
How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
Management Erosion Control Measure
What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipment (i.e., track hoe. dump truck, motor
grader- etc.)
g. Will wetlands be crossed in transporting equipment
to project site? Yes . _X No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X_ No
If yes, explain in detail _
NCDOT Carteret County. Replace ridge No 15
Applicant or Project Name
Signature
1 21 ??
Date
Revised 03/95
?aq r?ur' .tir.•? - '"J \ ,r (??? ,m Iv vv `t /fi -
Pow Pamlico Bea h, ?' Ro..• Bov 1J /
Avon
IOM _ •r.r.`A[IL[ 1 \ ?'
III
'`9 I ti
Sou
-12 z
Royal
G
Holly,dle
(Cash Corner) I and\.m ere t'r ~ / ' ` \ ` I ?tte? ?•?o
} Mabel \?LvR. -n. /? \\ r[??t /Atd
- ? r•,y
i?[a,oro ;sarboro ?lr?? ?/?re`ncfe? /' `\.\ Guacoke?-??L11 u?t?CQ
A:IlenCe // -
Merrrll? G >YP-hrlons".11e ••?r? jti -?\? "r_•_ Z"r"
11 $$? mfco/ Rallan O /nS(.AT?K//?,?. Por lsmov ln? grincoAr /nfrl _. •'• ••?. -
J ? • C ienl a?/ ? Bav 'v ?``?.rr`q-1-' / 5 /p?`r? I ?..+. ? _- .r ?r rt`'•rs- _
I ?A([; anc• ?.• / ? _ tt': f Lluv \ .I / ?- ??tif -1 -
\r l U r
edar Islaria"1-\?
1 \ yf? la fn r toJr \` \ $u ash /nL•I
Spuln R?.er -t'] / I 4 ;
+ f?t• MTnesoll/
Cosa
?1:1_V '.w Y.7 r G_\??y "` ' \ r C tilt !•V y` i .- $•
in,, F r
't 'Norlh ? talerr
NORTH CAROLINA
. ?? ?(f?,1, (_ i \ J ) f • \.L-An ?ual:er? t. u.: n:x•l lt. A, L.
70
` / / ? ? 1_? ? ?,?^ = \ ?•'o `. , ? 1l.
?~ 19 Tk-
uzfi
Dil.
/ p ( (. n:' 6wvlor• Mw .oa [ ' u+E Z ?? ••...'/•4 1?
Z?REA (h , \ ( ? ? •;. I ? ? r`F ? ? ?>\ ? 11]2 / A •r
%:?`, ! \?
CITY HE
._? '_'?i I'? I[ __ '`" J`^?'; ? •?'?'? .s?s.e ? `'/.n` ,? \ ?_;/ - T11E STRAITSJ?? ?-
C A TrZ T E R, E- T coul SCALE
? -. - 3 -- - - EAU:[
„„ o M1 - ? ~1!1 °? to \\,{ '/ , i_I 1.S Ul . ? 1 j. ?) ? L?? ?
111E-
19-L I
' a?lock-_'Harlo.e )0 (Stacy
11ff II ?y
Hal10.e ?..?! IJT) (\ \ l `?
s Ot-a r<fVlll?Ion
J'M°C C?`yaP1
r_?=_? ly y •?
I"l) 1Mushal er r•` ^'c° rw.r• ,?.
ais}'NQ?t?t?., •". eialw• WolicCiler i+!- :J?•. f"t'•.ya.,nh4+.: - a
a
Inds a:.ld r?" •+sws••
I Ra`.n' NOPTH CAROLI `IA belt l
?•?•.av? d SCALE C( MACS CrC,hiH C^UAIS APPRO[ 13 YI[CS
SCAIC Of $1t0-'IRS 01( K)I[CUA($ APPROI 111110++ I
0 JO [0 ra C CR$
' _ .'I SIC IS ;, x.1101'-:9 "10?R(R$
1
rr. c.1).6''r
pcIV. QF N[?[Ca{jIJRYS
/?QTGRI;I uNiY
SR• #15MSK 1152
Q Af Z"R I9 0 F W*0 ?R
APR L 19(C?
.s Ftetr
4 ? JI ? ?_ ?1 ? .o
1 LL "
oAT.
v J /
2. r ? Vim` :•I•:•:•:•:?`c?/
r_ ?'?^ i I ? I \ ¢ J
C? I I I .Y- ? 1 i?
cl,
fob
qz-l
ayoX: .::.
. o
C
Ll
Lc
U
M
M
. 4r
Qr
L J
L Q
r
?l W
4 ?
N
6
r
1?
? j
w Its -,
...t
no I?
1
i
J
v J r
IL c
L9
lu N
W
W Lu
wre'Re< COUNTY #15' 00 ,OR. T?, t,8 n r7 Wit cR
?.Tyg
n
II
CN ..T,
G J
gt ? o ?
0 0( 1
?¢
I j
a QL >1
Q_
a
\?1
0
V
z
0
L
V
J
J
J
Z
0
. f'
a ? o
0 0-
'n V
C C
C N
?- V
i?
nf. D o.-T' j
cAg-r m- - r Co uOy
8R, ?? oN sR 1.12 i
ev ?/V Z, rgle j
A
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: NC Department of Transportation (tributary off Wards Creek)
2. LOCATION OF PROJECT SITE: on SR 1152 and on a tributary off Wards Creek, near the
community of Otway, Carteret County
Photo Index - 1995: 52-608, T-11 1989: 152-1,1-14
State Plane Coordinates - X: 2732300 Y: 349000
3. INVESTIGATION TYPE: CAMA/D&F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7-9-96
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 9-30-96
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Carteret
Land Classification From LUP - Rural & Conservation (Primary Nursery Area)
(B) AEC(s) Involved: CW,EW,PTA,ES
(C) Water Dependent: Yes/No
(D) Intended Use: Public
(E) Wastewater Treatment: Existing - N.A.
Planned -N.A.
(F) Type of Structures: Existing - Bridge
Planned - Culverts
(G) Estimated Annual Rate of Erosion: 0'
Source - Personal observation
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands ± 400 ft.2 ± 225 ft.2
spartina alterniflora, juncus
roemerianus,distichlis spicata
(B) Non-Vegetated Wetlands ± 2,700 ft.2 ± 1800 ft.2
Shallow Water bottom areas
(C) Other ± 15,500 ft.2
High ground
up 'r
(D) Total Area Disturbed: ± 18,200 ft.2 ?-. a d?? 1a
(E) Primary Nursery Area: Yes
(F) Water Classification: SA Open: Yes
8. PROJECT SUMMARY: The NC DOT is proposing to replace an existing bridge with culverts at a
site on SR1152 and over a tributary to Wards Creek, near the community of Otway, Carteret County.
4
FIELD INVESTIGATION REPORT:
NC DOT
PAGE #2
9. NARRATIVE DESCRIPTION: The NC Department of Transportation (DOT) is
requesting a permit to replace an existing bridge with culverts at a site located on SR
1152 and on a tidal tributary of Wards Creek, near the community of Otway, Carteret
County. The existing bridge is ± 46' long x 19' wide and has a vertical clearance
above the mean high water line of ± 2'. On either side of the bridge a border of
coastal wetlands exist which is vegetated primarily by spartina alterniflora, juncus
roemerianus, distichlis spicata. The width of the tributary is ± 45' wide except
directly underneath the bridge where the headwalls have narrowed the Creek to f 35'
wide. Beyond the bridge, the tributary and its adjacent coastal wetlands continues
inland for ± 1400' before ending. This tributary and the adjoining Wards Creek has
been designated a primary nursery area by the Division of Marine Fisheries. The
Creek is also designated as SA and is open to the harvesting of shellfish.
DOT is proposing to remove the bridge and replace it with 4 lines of culverts. The
culverts will be ± 40 in length, each having a width of ± 8.5' and a height of ± 5.9'.
Four feet of fill material will be provided between the culverts which will result in a
total crossing width of f 46.3'. To facilitate the installation of the culverts, f 2,700
ft.2 of Creek bottom would be excavated with f 575 ft.2 of Coastal Wetlands being
either excavated or filled. Approximately 400 ft.2 of high ground would also be
excavated to provide a sufficient opening for culvert installation. The culverts and
associated fill would result in a permanent filling of ± 1800 ft.2 of estuarine resources.
The construction of the roadway embankment and the raising of the road grade will
result in f 50 ft.2 of coastal wetlands and ± 15,500 ft.2 of high ground within the
existing road right of way being filled.
10. ANTICIPATED IMPACTS: The project as proposed will result in the excavation of
± 2,700' of shallow water bottom and ± 400 ft.2 of high ground, the excavation and
filling of f 625 ft.2 of Coastal Wetlands and the filling of ± 15,500 ft.2 of highground
within the existing road right of way. Approx. 45 yds.' of material would be placed
below the mean high water line and f 275 yds.' of material would be excavated and
trucked off site. Turbidity levels in the immediate area will increase significantly
during excavation activities. The negative effects of this increase can be lessened if
excavation is timed to periods of least biological activities or turbidity curtains are
deployed during construction. Proper erosion control techniques will also need to be
undertaken along all disturbed areas during construction in order to prevent sediment
runoff from entering adjacent wetland and water areas. There has been various
concerns expressed by some federal and state agencies over the years concerning the
potential negative impacts of culverts to fisheries resources. These concerns may be
amplified since this work is occurring within a designed primary nursery area.
PREPARED BY: Charles Jones
DATE: October 21, 1996
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. William Gilmore
NC DOT
PO Box 25201
Raleigh, NC 27611-5201
Dear Mr. Gilmore:
NC ENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
October 19, 1998
Re: Bridge maintenance over Ward's Creek
Carteret County
DWQ # 981025
The Division of Water Quality has reviewed your submittal for a CAMA
permit replacement of bridge 15 on SR 1152 in Carteret County. Your application was
not complete since our processing time will not begin until the CAMA Permit application
is received in the Central Office.
I can be reached at 919-733-1786 if you have any questions. Until this
information is received, I will request (by copy of this letter) that the Corps of Engineers
place this project on hold. Also, the project will be placed on hold for our processing due
to incomplete information (15A NCAC 2H.0507(a)(4)).
Sincerely,
J n R. Dorney
'i ?f
ater Quality Certi Yiation Program
Attachment
cc: Wilmington DWQ Regional Office
Wilmington District of Corps of Engineers
Wilmington Field Office Corps of Engineers
John Dorney
Central Files
981025.hld
Division of Water Duality • Non-Discharge Branch
4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper
SrAn
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH. N.C. 27611-5201 E. NORRis TOLSON
GOVERNOR SECRETARY
September 30, 1998
Mr. Ted Tyndall _
Division of Coastal Management
Department of Environment and Natural Resources
Hestron Plaza II ?!? U1:1 P tfi 13
151-B Highway 24
Morehead City, North Carolina 28557 NIEMNDS GRt;Ci
Dear Mr. Tyndall;
Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over
Tributary of Ward Creek. State Project No. 5.2151.
The North Carolina Department of Transportation proposes to replace Bridge
No., 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit Enclosed is a permit application for a
CAMA Major Development Per?it including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
?ORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
b. City, town, community or landmark
1. APPLICANT Otway
C. Street address or secondary road number
3. Landowner: SR 1325
rtation
s
f T d. Is proposed work within city limits or planning
po
ran
Name N.C. Dept o jurisdiction? Yes _X_ No
Address n n Box 25201
e. Name of body of water nearest project (e.g.
City Raleigh State N river, creek sound, bay) Tributary of Ward Cr
1 Day Phone (919) 733-3141
Zip
2ZSi1 '
_
_ 3. DESCRIPTION & PLANNED USE
Fax (919) 733-9794_ OF PROPOSED PROJEC I
b. Authorized Agent:
Namc
Address
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
t1TT1}f .r ltridEe
Replace exist'nO rlPtPr,nrnteti
with 1 na 50' cored slab (abutt tvnng) City State
Zip Day Phone b. Is the proposed activity maintenance or an
existing project, new work, or both? . Both
Fax
C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
Note: Permit will be issued in name of landowner(s), methods of construction and daily operations
and/or project name. of proposed project. If more space is needed,
please attach additional pages. Proposed
?tp. ct will be for public transportation.
Construction will utilize typical road
2. LOCATION OF PROPOSED constriction Poi . ment each as track hoe.
PROJECT dump truck motor gT er, P+c -
a. County Carteret
FORM DCM-MP-1
4. LAND AND WATER
a.
C.
d.
e.
E.
9.
h.
Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
Soil type(s) and texture(s) of tract
Sand and muc?
Vegetation on tract Dist chis spi a a
Juncus roemerianus Baccharis halimifolia
M. Describe existing wastewater treatment facilities
N/A
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff along project
Describe existing drinking water supply source.
N/A
Man-made features now on tract
45 foot timb?r?1?SP
What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
Conservation Transitional
Developed Community
Rural Other
How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes __X_ No
(Attach zoning compliance certificate, if applicable.)
Has a professional archaeological assessment
been done for the tract? Yes X_ No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X_ No
Are there wetlands on the site? X Yes - No
Coastal (marsh) _2?_ Other
If yes, has a delineation been conducted? -ND-
(Attach documentation, if available)
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
FORM DCM-MP-1
;ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners.must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber & Elena Hall
Address 565 Fire+^wer Road
Phone -Beaufort, NC 28516
Name BeverlL& T?nnna mer
Address P O Box 148
Phone Atlantic NC 28511
Name Jetty Lawrence General Contractor
Address P O Box 598
Phone Beaufort. NC 28516
A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
* A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of 19
Print Name William D Gilmore p R
6C,
Signature
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
_ DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to
this proposed project.
1. BRIDGES
a. Public _X_ Private
b. Type of bridge (construction material)
Cored slab concrete
Water body to be crossed by bridge
Tributal:y to Ward Creek
d. Water depth at the proposed crossing at MLW or
NWL +/ 2.2
e. Will proposed bridge replace an existing bridge?
X_ Yes No
If yes,
(1) Length of existing bridge 45.6'
(2) Width of existing bridge 19.2'
(3) Navigation clearance underneath existing
bridge +/- 2A
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber-
bridge (to be removed)
Will the proposed bridge cross wetlands containing
in.
no navigable waters?
Will proposed bridge replace an existing culvert(s)?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above n.
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain) N/A
g. Length of proposed bridge 1 na 50'
h. Width of proposed bridge Clear roadway = 20'
Height of proposed bridge above wetlands
+/-20'
j. Will the proposed bridge affect existing water flow'?
Yes X_ No
If yes, explain
k. Navigation clearance underneath proposed bridge
+/ 2A
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? X_ Yes No
If yes, explain A single span brid.Le will replace
the exist ingpan bridge Navigableable onenine.
If yes, explain
Yes _ X No
Have you contacted the U. S. Coast Guard
concerning their approval?
Yes X _ No
If yes, please provide record of their action.
orm DCM-MP-S
Will the proposed culvert affect existing navigation
CULVERTS N/A
1. Water body in which culvert is to be placed
?. Number of culverts proposed
Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
i. Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
potential? Yes
If yes, explain
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
Coastal Wetlands - SAVs - Other Wetland,
If yes,
(1) Length of area to be excavated 5.0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yards
Will the placement of the proposed bridge of culvert
require any highground excavation?
X_ Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated 1 5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T T..I., A ai*a fn ha r'i?tim.. ine..&
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
No
Form DCM-MP-S
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes _X No
If yes, give dimension if different from No. 2
above.
b. Will the proposed project require the
any existing utility lines? _ Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X_ No
If yes, explain in detail None expecte -
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X_ No
MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for "gee
and stabi ization -
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on h.
highground? X Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
Management Erosion Control Measures
What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
eauipment?i,?? oe. dump truck. motor
grader etc ?
Will wetlands be crossed in transporting equipment
to project site? Yes . X_ No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X No
If yes, explain in detail _
NCDOT Carteret County. Repla ce Bridge Nn_ I
Applicant or Project Name
Will the proposed project involve any mitigation?
Yes X_ No
If yes, explain in detail
Signature
1 "19
CARTERET COUN11
1 NORTH CAROLINA
- `J \J C '-n Qua, ter uwi n•j, s'usniknp vvv
J s• I[tcr r PtmlicO g h ?' ?Ko<.•?Bov (r - /f
Pow, 1 t r ??N+wrs`ta+r(e? 1[\j-
fOM t - NAr't witDoft `[ewe I l
.----_\;\ rl.ll. I.
Z) eeu r i. ,
4, soy ? ? G?
Geek I ? '+Iia \ ?
t 4 l`
Ar'•o'a OR
oyal
HoWCFm \
i Mesic ` \ \.c
(Cash Comer') ? 1lollynlle \ / '
?enSlemere \
U ck
F/t/orr; 13
IfLeo o '37rboro on
Merrell _.-?-v tonsnlle C T "r(? ?? Portsmo Ih_r???lYna oAr
P In 10 J
55 / Rullen r• 1'
? da I
01 ent*
w+Pine I.?ILa ho?^r
S
\ ?It•n?
?t ? l7rvm lnlA
ciler?
icy //..
•rt)iriS,
m rni
J ~ q
I * r y
MirsMl erQ e aula /
Inrlua?
IPcacn
. \TnPT H. (' A R
L1N?
r
\t
\t
rrr[ rfrr\t
L' u
III
I Aron
y
''o
0 f
0
o
Z
USE
O I
belt
t?.
r
PIV. OF 141614WAYS
M rexrf COUP! TY
apt. 4H5 ON s K 1 152
Ll hf TR 1,8 o F WARD ?A
APR L 196
,t?o.oj' P . s 4
i
N
I
II
r
0
i
w ?.
4.
I
4
SCAtF
Q,
C,
72
0 = in
< 4 LL M
pia CL N `J llyi
L?
AT'
4 o v?' cY h
Q u?? ° ! r:::•:' j
t
?l
f
0
I '
04
41.
P? ti,?il _ Q .I.,-
? E..I •.•.. r !? 1
Lo V)
glee Co
- - QR- *(5 00 S 1 i5
?
,,mss, 01,
c8nrWARP
EDGE U r EDGE 0 r
WETLANpS 1nJ`:'L./aNDS
SEC%101,1 -?
X90!
'
so'
So' ?I ScAL ? ? ?? 5o'?oR rz
1 ?= /0' VEJZ7,
I
?o,9Dw.9y r- L L
i
PROP. Gal I
c
WE tc.aNOS ? ??_?
?- OGE c F
WCTLAN L.1
SI L L q 30?E- 0, N U/ SG5 C !!. yvS,
t
BE le, O',q U, Y P5.
r o
J 1V 11 f 1.?L l/ vy
b Cn - - 1
:zl
ICJ c? ? ? ? I
I I J ?
0 - I LJ y '?
7 I ?t
I
Q o 4
i
J
a
Q
.a
lt?
Z
?
o
`?
FC V
i
I 1
\ J
J
J
f a
J I
z
I?
0
0
-t
C'
wiwr? s 2
_? ? SL1TT
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201
GOVERNOR
...September 30, 1998
si UC_J_ 141.
Mr. Ted T dall
Division of ?geme t
Department 1 i N tural Resources
Hestron Plaza II
151-B Highway 24
Morehead City, North Carolina 28557
Dear Mr. Tyndall;
E. NoR1us TOLSON
SECRETARY
Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over
Tributary of Ward Creek. State Project No. 5.2151.
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of.Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
j (41 & wl,-- -
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
.Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
b. City, town, community or landmark
L. APPLICANT Otw.ay
C. Street address or secondary road number
3. Landowner: SR 1325
tation
f T d. Is proposed work within city limits or planning
ranspor
_
Name N.C. Dent o jurisdiction? Yes X_ No
Address n Box 75701
e. Name of body of water nearest project (e.g.
Raleigh State NC -
City
river, creek sound, bay) Tributary of Ward Cr
Zip 27611 Day Phone (919) 733-3141
3. DESCRIPTION & PLANNED USE
Fax (919) 733-9794 OF PROPOSED PROJECT
Authorized Agent:
b a. List all development activities you propose e.g.
. building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
Name Replace existing deteriorated timber bridge
Address with 1 & 50' cored slab (abutt typ _
City State
Zip Day Phone b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
Fax
C. Project name (if any) ('arteret Bridge # 15 c. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
Note: Permit will be issued in name of landowner(s), methods of construction and daily operations
and/or project name. of proposed project. If more space is needed,
please attach additional pages. Proposed
project will be for public transportation.
`onstraction will utilize 1 ipical road
n PQ,w ^.nant c„rh ac track h_oe.
2. LOCATION OF PROPOSED construgli
PROJECT imp truck motor grader, etc -
a. County Carteret -
FORM DCM-MP-1
4. LAND AND WATER
a.
b.
C.
d.
e.
E.
Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
Soil type(s) and texture(s) of tract
Vegetation on tract Distic is Sptcaca.
Juncus roemerianuS Baccharis halimifolia
Man-made features now on tract
45 foot timber bridge
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan.)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes __X_ No
(Attach zoning compliance certificate, if applicable)
Has a professional archaeological assessment
been done for the tract? Yes X_ No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X_ No
Are there wetlands on the site? X Yes - No
Coastal (marsh) X_ Other
If yes, has a delineation been conducted? N _
(Attach documentation, if available)
in.
n.
0
Describe existing wastewater treatment facilities
N/A
Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff along project
Describe existing drinking water supply source.
N/A
In addition to the completed application form, the
following items must be submitted: .
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
FORM DCM-MP-1
;ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners.must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber R. FlPna Nall
Address 565 Firetower Road
Phone Beaufort. NC 28516
Name Beverly R Donna Rimmer
Address P O Box 148
Phone Atlantic NC 2851 1
Name Jerry Lawrence General Contractor
Address P n Box 598
Phone Beaufort NC 28516
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
* A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of 19
Print Name William D Gilmore P E
')?Ati
Signature
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
_ DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
_ DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
I<:.. , ?sca
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to
this proposed project.
(4) Will all, or a part of, the existing culvert be
removed? (Explain) N/A
g. Length of proposed bridge i. 50'
1. BRAS
h.
a. Public X Private
i.
b. Type of bridge (construction material)
Cored slab concrete
j•
Water body to be crossed by bridge
Tribut= to Ward 'reek
d. Water depth at the proposed crossing at MLW or
NWL 2.0'
k.
Will proposed bridge replace an existing bridge?
X Yes No
If yes,
(1) Length of existing bridge 45.8'
(2) Width of existing bridge 19.21
(3) Navigation clearance. underneath existing
bridge +/-2.4-
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber
bridge (to be removed).
m.
Will proposed bridge replace an existing culvert(s)?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above n.
the MHW or NWL
Width of proposed bridge Clear roadway = 20
Height of proposed bridge above wetlands
-
+/ 2.0'
Will the proposed bridge affect existing water flow?
Yes X_ No
If yes, explain
Navigation clearance underneath proposed bridge
+/ 2.4'
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? X_ Yes No
If yes, explain A singIg apan bridge will replace
the existine 3-span bridge Tav.gable opening.
Will the proposed bridge cross wetlands containing
no navigable waters? Yes _X No
If yes, explain
Have you contacted the U. S. Coast Guard
concerning their approval?
Yes X No
If yes, please provide record of their action.
Rcvi'sC 1 01/05
Form DiCM-MP-5
Will the proposed culvert affect existing navigation
t CULVERTS N/A
3. Water body in which culvert is to be placed
b. Number of culverts proposed
c. Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If Yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW` or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
i. Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
potential? Yes
If yes, explain
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
_X_ Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be excavated 5.0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubiC??ards
c. Will the placement of the proposed bridge of culvert
require any highground excavation?
X_ Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated 1.5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T T-I.-A cite to hP AptPrminP.(I_
2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
No
* NOTE: Any suitable material will be used as
as backfill for the project.
Form DCM-MP-S
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL7 Yes ?X No
If yes, give dimension if different from No. 2
above.
b
Will the proposed project require the
any existing utility lines? _ Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail None expected
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X _ No
MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled.
(3) Purpose of fill
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
sY Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upgrade
and stabilization -
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X_ Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
4, GENERAL -
a. Will the proposed project involve any mitigation?
Yes X_ No
If yes, explain in detail
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NC'DOT Best
Management Control Measures
What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipment (i.e.. track hoe, dump truck, motor
grader etc )
Will wetlands be crossed in transporting equipment
to project site? Yes , X_ No
if yes, explain steps that will be taken to lessen
environmental impacts. Existing road
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes ?X_ No
If yes, explain in detail
NCDOT Carteret County. Rep] ace Bridgt No. 15
Applicant or Project Name
Signature
n.l}n
S Z Tr'
N I
LL
Ot-Y
'r 1711
M
rl '
V]I
4
?- •- r _I ? ? -- - a?,,.?.i,-'•:--`?1 ?`\°a i. __-` Jam`. ---?..'_'J?- _. .. _
SCALE
A MILES
CARTERET COUNTY
NORTH CAROLINA
?`? ?? ) I \t„ an Ouulc( owl nu?• R'u.nrAliV buy \ fl
?r\ lrr( `, \,\ 1 N Avon
J ?O1 ?. Nccr ? t ?' Ro..?Bav t o 2 ?
Poln• 1 1 P.mlico Bea h ? - 1 \
IOM !? - , NA r'L wll Otl?lTWf? "'
$ou ? Q
o l ?.re pia f??l:<on , \ <,I_ LW
. A l •?
? Irtb° o?
T A
?1 .
?A(t: slPl
\?? f
lad(ock 't{.rlowr?I 1G SucY ti
I (1 i l?
fij.? N• R
S m rn.
? o dad; s,
3,1s
1
ma'sh4i ell
I'Thel
1 n?l.nl?
<Kh
PNnTRT
a
1
ti u?a?h ln(rl ,
1
I ?.
I.
11(( IfrrYl /
rl
S I V?O
cnrHousf z
LINA7,
piv. of 14 [614WAYs
3R• 415 ON SK 5152
pi TK t B OF LAU Cie
MPPUL,
196
a?
6-
r7 0
a
.,? r! ? ;lam ?3
a }
1? Nel
-
4 ll
O ? r
,
J }-
/
4r o
O?
.;::.. ?
`
?- v v <
r• • '. • ? "J I? Vol
04-
n:{• • T `
'?l LAY L? :;:a ; •..i•'., .: , ??-. '? Q (J
IjI)
i? If)
0?1 S 1 t5z
••` r - - #t5'
G..:. Ott
U
M
ni
rl
(r
r
n
4 ?
N ?
0 Cr'1
2
I, 'ul ,,L1 C
ro J
Z V?
J J
v = Q^
iL LL
IQ W
w w
q Q
f OG E 0 r ---
WErLANOS
FILL 1?30VE (),y Vi. SG5 c ?, yes.
0 .N. w, = 7C" y Ds.
i
i
O
r t ?ju rL W Q
.v?? W 11" ? h o
spa ? ' E-
;<I
Z
E
I I ?` I i {
a?
I,
a
L
III
? f
J
0 1i
Z
z
0
l;
J
J
0
0
- t-
C,
N
N'l fiP. O.-C t
0R- # ? 5 ON sR ? l?2
SUi(
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH. N.C. 27611-5201
GOVERNOR
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
Department of Er?yironment and Natural Resources
Hestron Plaza II:" r ' - -
151-B Highway 24, '
Morehead City, Ngi-th Car 2#b5
Dear Mr. Tyndall;,,.. 4?
9810
E. Noms TOLSON
SECRETARY
Subject: Carte ree', o µ eplaceltnent of Bridge No. 15 on SR 1152 over
Tributa o 1,Creell. State Project No. 5.2151.
ry
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
William D. Gilmore, P.E., Manager
Planning and'Wtivironmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
1. APPLICANT
b. City, town, community or landmark
Otway
C. Street address or secondary road number
-
a. Landowner: SR 1325
Name N.C. Drpt of Transportation d. Is proposed work within city limits or planning
jurisdiction? Yes ---2L- No
Address p n Roc 25291
e. Name of body of water nearest project (e.g.
City _EgLdgh _ State NC river, creek sound, bay) Tributary of Ward Cr
Zip 27611 Day Phone (919) 733-3141
3. DESCRIPTION & PLANNED USE
Fax (,919) 733-9794 OF PROPOSED PROJECT
b. Authorized Agent:
Namc
Address
City State
Zip Day Phone
Fax
c.
2.
Project name (if any) Carteret Bridge # 15
Note: Permit will be issued in name of landowner(s),
and/or project name.
LOCATION OF PROPOSED
PROJECT
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
Replace existing deteriorated timber bridge
with 1 na 5 'cored slab (abutt ?tvpe-
b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
C. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
methods of construction and daily operations
of proposed project. If more space is needed,
please attach additional pages. Proposed
. ct will be for public transportation.
Construction will utilize Wical road
constr„rtiQn equipment such as track hoe.
dump true motor rate. et[
a. County Carteret- -
FORM DCM-MP-1
4. LAND AND WATER
in. Describe existing wastewater treatment facilities
N/A
a.
b
d.
e.
f..
Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +1-5.01
Soil type(s) and texture(s) of tract
Sand and muck
Vegetation on tract Distichis spicata.
Juncus roemerianus Baccharis halimifolia
Man-made features now on tract
45 foot timber bridaP
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff long project
o. Describe existing drinking water supply source.
N/A
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes X No
(Attach zoning compliance certificate, if applicable.)
Has a professional archaeological assessment
been done for the tract? Yes X_ No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X_ No
1. Are there wetlands on the site? _2L Yes _ No
Coastal (marsh) _X Other
If yes, has a delineation been conducted? No
(Attach documentation, if available)
In addition to the completed application form,. the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 710203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
FORM DCM-MP-1
;ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners.must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber R. >4tP^a uall
Address 565 Firetower Road
Phone BeaufoftNr 128516
Name Beverly Donna u immer
Address P 0Box 148
Phone Atlantic N(` ?R51 1
Name Jerrv La?x^ P^ce General Contractor.
Address P n Box 598
Phone Beaufort, NC 2851 Fj
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of 19 q
Print Name William D Gilmore P E
I
CAI?
Signature
Landowner or..-..,-. ize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be
Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A
other sections of the Joint Application that relate to
this proposed project.
g. Length of proposed bridge 1 Q 50'
1 BRIDGES
h. Width of proposed bridge Clear roadway = 20'
a. Public X Private
i. Height of proposed bridge above wetlands
b. Type of bridge (construction material) +/- 2.0'
Cored slab concrete
j. Will the proposed bridge affect existing water flow'?
Yes _ X No
C. Water body to be crossed by bridge
Tributary to Ward Creek - If yes, explain
d. Water depth at the proposed crossing at MLW or
NWL +/- 2.0'
-
k. Navigation clearance undern eath proposed bridge
e. Will proposed bridge replace an existing bridge? 2
X_ Yes No
Will the proposed bridge affect navigation by
1
If yes,
(1) Length of existing-bridge 45.8' .
reducing or increasing the existing navigable
(2) Width of existing bridge 19 2' opening? X_ Yes No
l
ll
(3) Navigation clearance underneath existing ace
rep
If yes, explain A single span bridge wi
able opening.
e Navi
brid
3
i
i
bridge +/- 2A g
-span
ng
g
the ex
st
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing limb r
bridge (to be removed),
in. Will the proposed bridge cross wetlands containing
no navigable waters? Yes X_ No
Will proposed bridge replace an existing culvert(s)?
Yes X_ No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above n.
the MHW or NWL
If yes, explain
Have you contacted the U. S. Coast Guard
concerning their approval?
Yes X_ No
if yes, please provide record of their action.
Form DCNI-MIP-5
i. Water body in which culvert is to be placed
Number of culverts proposed
Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f.
h.
Length of proposed culvert
Width of proposed culvert
Height of the top of the proposed culvert above the
MHW or NWL
Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
j. Will the proposed culvert affect existing navigation
potential? Yes No
If yes, explain
3 EXCAVATION AND FILL
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X_ No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be excavated 5.0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yards
c. Will the placement of the proposed bridge of culvert
require any highground excavation?
_X_ Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated If
(3) Amount of material to be excavated in cubic
yards < I cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T T-1- A cite 4n 1-%P r1PtPrmined- _
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
Form DCM-MP-S
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes _X_ No
If yes, give dimension if different from No. 2
b. Will the proposed project require the
any existing utility lines? .- Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X_ No
If yes, explain in detail None expecte .
above.
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X No
MHW or NWL? Yes X No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_2? Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upy-Lade
and stabilization
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X_ Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
4 GENERAL
a. Will the proposed project, involve any mitigation?
Yes X_ No
If yes, explain in detail
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
Management Erosion Control Measures
f. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipment (i.e.. track hoe dump tniclc, motor
grader etc,)
g. Will wetlands be crossed in transporting equipment
to project site`? Yes , X_ No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X No
If yes, explain in detail
NCDOT Carteret County. R=b &-rl e No 15
Applicant or Project Name
Signature
I2???'
N I
I
'I
ry
ro
2
I
4
h
.jr.,; IIaO j
THE STRA1 TS /
COUNT)? I 0 t-SCALE _ - i
NORTH CAROLINA
\? a ) /; \t S..+ri Qwrler` bwi rtu?. `lVulnrkr alp U.IV
\\ , U • \`J ( i Avon
?? Rrt r1 7 Jc
rtacrl ?Ro.rv.Bav\ - t
Poin' 1, 1 Psmlico Bea n - ?1?JJJ `(\ I \ g 2
?I/??? 5 ?µ?atfLR ,? \ I
IOM t ,F?? • NAr'L WrlDll!(R ???---?? 1 I W ?
' ?- 1
?' Avr+ N
Mc
1 r -or
? A
?I
Hulov.e , --b Y-
\ r. r?0,ris J
(tr..
.. ,.+ H• ytrl '.? 1 OI t ll ton 11 '?I?„t?'
.•?? -'C UFwr, 1f,a,li? Vrn, ?. Y
?"^r
\ ' City ? t? c,,?M+I:Aaf er¢ w?, !..
Pint K.vILShnr+ ' Por:-/.• pry^. r:.,:
I sett eERRr?( I
i
i
I IL
\ `' 2 or c ti
vcoke?-? ,p - -
ticHrnousf
Sumh Lr MI I
i
I I
I
INA
CA P\01
IPe+`h 1. NOR? -
I I0. . ?0 i il. M.4 ?.1 ?.IItS
ct.cr?.o.r
DIV. pF H1 64WAY-S
CR-reW COUNTY
SR. *15ONSK 1152
or 9 T-K 1,8 o f GARS Ce
belt l APKI ,1,,/ 106
._. =_i r•,:.to,o.l 1 of ?'
6-
X37?»0
72
S w ,?
j no
„J CL ? ;lam ??,
} 3
o _
i-n
f r QC
V) ` CL ? N
• 4 O Q
l- ?
P h - E- J
••nn ^ r
rv
?J ?"? ? y :'I•:•:` C1 i ? ? (?,? 1.
-We-e( cowry
?.......•....:..• o IARD
U
M
M
?I
40
tL
T
J
L4
Q C[
1 N.
(?.C
0 C r'
o tZ
f _
)lj
ro
? J
2 L7
J
IL i
?
LL
w N
w
w
Q w
Cl
.
EWE O F" EDGE O r
WETLANO:5 W?r?- NOS
SFci/o/,/ -/?
i
y9o?
So'
-o" 5c-AL?5 S1or/-50"goQsz
I
PRoP. GR,
E?cE cr
00 WEtcaNDS
- - -
L/1a
S
50?
SCALE _ % ??= SO ?,'Y?tzfZ,
F-IL L 1-?130VE O • N V/. = 565 C Cl, yv.5,
FILL 3,-lGvk/ o•N• w = 7GU. Y D5.
r I LL i 1"'N DS = / 3 cc(, VD-S /-
Tied n , l YXx
gR? ? c 5 ON 5R t ??
Cfl 03 _ O
t
11 ?rV W Q O
tj) W 1 ?? "1
LO
s?
1.
i
J I o- _a c
0. ?
y
.q
ti
LQ
J
!til
t-?
t
z
z
t
o?
v
J
J
c
IT
Its c
0
cR-f?2^e? Co uxPr`
0R- X15 QN sR ?1?, ?
d FSU7Z
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201
GOVERNOR
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
Department of Environment and Natural Resources
Hestron Plaza II
151-B Highwy24--:-
Morehead City, taf iga
Dear Mr. Tyndall; /94%
E. NORRIS TOLSON
SECRETARY
Subject: Cartes , Replacement of Bridge No. 15 on SR 1152 over
Tribi t-ft';f V Vd Creek. State Project No. 5.2151.
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
NV
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
b. City, town, community or landmark
1. APPLICANT Otway
C. Street address or secondary road number
a. Landowner: SR 1325
Name N C Dept of Transportation d. Is proposed work within city limits or planning
jurisdiction? Yes X_ No
Address n n Roar 25201
e. Name of body of water nearest project (e.g.
City Raleigh State NC river, creek sound, bay) Tribut= of Ward Cr
Zip 27611 Day Phone (919).7
3. DESCRIPTION & PLANNED USE
Fax (911) 733-9794 OF PROPOSED PROJECT
b. Authorized Agent: a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier.
Name and excavation and/or filling activities.
Replace eructing detra oratedl timber brid=e
Address with 1 & 50' cored slab (.abutt tyng?_
City State
Zip Day Phone b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
Fax
C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
Note: Permit will be issued in name of landowner(s), methods of construction and daily operations
and/or project name. of proposed project. If more space is needed,
please attach additional pages. Proposed
- -. ct will be for public transportation.
Constriction will utilize typical road
2. LOCATION OF PROPOSED construction ?g'?InmPnt e„rh ac tTask hoe.
PROJECT dump truck motor grader, etc -
a. County Carteret.
FORM DCM-MP-1
4. LAND AND WATER
M. Describe existing wastewater treatment facilities
N/A
a.
b.
C.
d.
Size of entire tract N/A
Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
Soil type(s) and texture(s) of tract
Sand and muck
Vegetation on tract Digichis spicata.
Juncus roemerianus Baccharis halimifolia
f..
9.
h.
J-
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff along project
o. Describe existing drinking water supply source.
N/A
Man-made features now on tract
45 foot timber-bri?gP
What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
Conservation Transitional
Developed Community
X Rural Other
How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes __X_ No
(Attach zoning compliance certificate, if applicable.)
Has a professional archaeological assessment
been done for the tract? Yes X_ No
If yes, by whom?
Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes _ X No
In addition to the completed application form,. the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
-and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
1. Are there wetlands on the site? X Yes - No
Coastal (marsh) X_ Other
If yes, has a delineation been conducted? N _
(Attach documentation, if available)
ORM DCM-MP-1
ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
e A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners.must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber R, Elena Hall
Address 565 Firet,,.Yer Road
Phone Beaufort Nr ?R5t6
Name Beverly & Donna Rimmer
Address P ).Box 148
Phone Atlantic NC 28511
Name Jerry??Pneral Contractor
Address P 0 Box 598
Phone Beaufort Nr'IKU)
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
* A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of kr, 19 '
Print Name William D Gilmore P F
,()r-A V_4?
L-_ z4t ..-
Signature
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
_ DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Form DCM-VIP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be
Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A
other sections of the Joint Application that relate to
this proposed project.
g. Length of proposed bridge 19 50'
1 BRIDGES
h.
Width of proposed bridge Clear roadway = 20'
a. Public X_ Private
i.
Height of proposed bridge above wetlands
b. Type of bridge (construction material) +/- 2.0'
Cored slab concrete -
j.
Will the proposed bridge affect existing water flow?
Yes X_ No
C. Water body to be crossed by bridge
Tributary to ward Creek If yes, explain
d. Water depth at the proposed crossing at MLW or
NWL +/- 2.0'
-
k.
Navigation clearance underneath proposed bridge
e. Will proposed bridge replace an existing bridge? + - 2
X_ Yes No
If yes,
1.
Will the proposed bridge affect navigation by
(1) Length of existing bridge 45.8' reducing or increasing the existing navigable
(2) Width of existing bridge 19.2' opening? X Yes No
(3) Navigation clearance underneath existing If yes, explain A single sl2an bridge will replace
bridge +/-2.4- the existing 3-span bridge- Nayigal21e.9?
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber
bridge (to be removed)
in.
Will the proposed bridge cross wetlands containing
no navigable waters? Yes _X_ No
f. Will proposed bridge replace an existing culvert(s)? If yes, explain
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
n.
Have you contacted the U. S. Coast Guard
the MHW or NWL concerning their approval?
Yes X_ No
If yes, please provide record of their action.
+orm DCNI-IMP-5
CULVERTS N/A
!. Water body in which culvert is to be placed
I Number of culverts proposed
Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
i. Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
j. Will the proposed culvert affect existing navigation
potential? Yes No
If yes, explain
3 EXCAVATION AND FILL.
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes _X- No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
-2L Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be excavated 5.0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yids
Will the placement of the proposed bridge of culvert
require any highground excavation?
X Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated 1 5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T T..t., A a4tr% hP A-tPrmined-
2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
Form DCM-MP-S
(4) Will the disposal area be available for future b.
relocation of maintenance? Yes _2L No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes Y No
If yes, give dimensions if different from (2)
above. C.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X No
If yes, give dimension if different from No. 2
above.
Will the proposed project require the
any existing utility lines? - Yes X No
If yes, explain in detail
Will the proposed project require the construction of
any temporary detour structures?
Yes _ X No
If yes, explain in detail None expecte d,
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X No
MHW or NWL? Yes X No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled e. How will excavated or fill material be kept on site
(2) Width of area to be filled and erosion controlled? Standard NCDOT Best
(3) Purpose of fill _ Management Erosion Control Measures
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway- fill for 1 pg ade
and stabilization
£ What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipment i,e..track hoe,sltl??p truck motor
erader-etc 1
g, Will wetlands be crossed in transporting equipment
to project site? Yes , X_ No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
a. Will the proposed project involve any mitigation?
Yes __2?- No
If yes, explain in detail
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes _X_ No
if yes, explain in detail _
iNCDOT Carteret County, Replace Bridge No. 15
Applicant or Project Name
Signature
I ? :?. f ?? t_- ? \ I rte; i?`.:- ??? `\`F o: - _ _ J __? ? ??•?_ r ?. ?,
H ?
I
,I
I
O
4
srRa?rs ?? .?-_
T ti7 SGIE
COUNTS ° 6- -4
NORTH CAROLINA
I a (,", '•n Qu?Iltr-
or P'u,ni Alnv B.rV
?q Itccr t/rrr ?• ?Rm Ba
L I p>Imhco B?h
IpM l? - -? < NAr'[ ?v,lDll/E TTrTr?vvtttttt I I
Z) GRE r F.
I G0
ti Creek rlto \
Awora Royal Ir 3 ,?. 1 `JC\' ` \ \ ?? '
Hotnchm \
• ? Wesle ` / \ \
? Hollyvdle 5 / ' ? \ ter
'I (C+shCorner) ?•nd•mV. A.rn. \\
manbef
7 Doro ;3arboro Oauohe?,aJ
A:li•Ace on ?' Y l
Mernlt G rlon svJle C T 'rj? /? Porlsme Ih??0, r,l<odr
7O J
55? w/ Xonan .412`.f A? I
8uv n
I Reacr+1.
/ t
ti u?a<h Infrl ? i
I
I 1I
CAROLIN,,V6,
L\
30
(CAL(CE uIIES 0r[ NCH EQUALS ArVROt 13 ItIIES
;°
r i. {,ray
\1
IcfE Ife \/)
i
r•S 1v' ?°
LF! 4E,yJ
' 13
Avon
I
X12
i
• I
O
o`Frc _ ••?
r
AIV. pF N[WWAYS
CARTER i COUNTY
13R. x'15 ON SK 1 152
Q K TR 1,8 o F GAO Ge
MPKI1, 1r06
4
-L Y7 0 L2111
G
a
0
v `
a?
3
Q
cY
x o
< o L1
- Q
,l L o
? J
l/
04
A Q
P Q [11 --
61
/
.. r•:•
W
N
w
-a
0
0
n
?J
I?
^! v
'J
7
J
d
L
^ r
? J
UI L`\1
V)
U
M
hi
tL
+r Q
?1C ?-
4 ?
N
o Cr;
v o '.
r?
J
ro J
o } d '
cr ? .
J J
J 1?I 1
IL K
? N
41 W
Z
w w
o n
r,Po.pfe? o0 CoSP, 1 '15z
dR- ?c5
orr - cB o MW CR
EpGE U r EDGE Or"'
AN05 W?:'c.?NOs
?WEnTL U. O
SEC % / oh/ -?
I
X90_'
I
So'
/o, {/FQT,
I
Q ?vADwly ?=/? L.
r
PROP.
LOGE b F "1c TL AlJL?3 S6Q
00 WE rLANOS_ "
S/_=ci/o/I is _6
Ll?
50,
r /
P/L L r?130 ?E O , N W, 5 G5 C c!• YDs,
FILL 0,,q. v` , = 7C u- Y PS.
-ILL 1AlcT% I?NDS= 13
ro ?L CfL L 5g5-???.
C?.TP.?R.? ,ouN-i?
8A, 5- olu SK
d
T ri, 0
?t 'j? 2 I D
L
a
J
lli
v1 O
n
?J
J
Irl
a1
? z
i
a
z
V
`I
J 'ua?
J
0
Z I
7
IIA
I
I
I
I
1
E'
?I 0?1 11
Ar. C P. o.`f
~e?opt Co u
p! N?r'Y 2
0R- .. 5 SR ??
SUT[
0 w ?A
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. 60X25201. RALEIGH. N.C. 27611-5201
GOVERNOR
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
Department of Environment and Natural Resources
Hestron Plaza 11
151-B Highway 24 _
Morehead City, North Carolin 0 (? .
Dear Mr. Tyndall; ;.4 OCT 14 ft
,8.1()1
E. Nowus TOLSON
S F.C RETA RY
t of Bridge No. 15 on SR 1152 over
Subject: Carteret Co
oject No. 5.2151.
Tributa?,of.t'p Pr
I'll ?gxvwel
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
William D. Gilmore, P.E., Manager
Pla*ng and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P.E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP-1
APPLICATION
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Name N.C. Dept of Transportation
Address v n Bo 25?01
City Raleigh State
Zip 27611 Day Phone (9191733-3141
Fax (419) 733-9794
b. Authorized Agent:
Name
Address
b.
C.
d
e
City, town, community or landmark
Otway
Street address or secondary road number
SR 1325
Is proposed work within city limits or planning
jurisdiction? Yes -X- No
Name of body of water nearest project (e.g.
river, creek sound, bay) Tributary of Ward Cr
3. DESCRIPTION & PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
Replace existing d r;nratPrl t;mher bridge
with 1 I cored slab (abutt Za2o-
City State
Zip Day Phone b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
Fax
C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
Note: Permit will be issued in name of landowner(s), methods of construction and daily operations
and/or project name. of proposed project. If more space is needed,
please attach additional pages. Proposed
_pLpjert will be for public transportation.
Construction will utilize typical read
2. LOCATION OF PROPOSED construction equipment such as track hoe.
PROJECT imp truck motor grader etc
a. County Carteret
ReviseO 01/9'
FORM DCM-MP-1
in. Describe existing wastewater treatment facilities
4. LAND AND WATER N/A
CHARACTERISTIC
a. Size of entire tract N/A
n. Describe location and type of discharges to
b. Size of individual lot(s) N/A waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
c. Approximate elevation of tract above MHW effluent, "wash down", and residential
discharges.) Surface runoff along project
or NWL
d. Soil type(s) and texture(s) of tract.
Sand and muck
o. Describe existing drinking water supply source.
e. Vegetation on tract Distichis spicata. N/A
Juncus roemerianus Baccharis halimifolia
Man-made features now on tract
45 foot timber bridge -
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan)
Conservation Transitional
Developed Community
_X_ Rural Other
h. How is the tract zoned by local government?
Not zoned
i. Is the proposed project consistent with the
applicable zoning? Yes X No
(Attach zoning compliance certificate, if applicable.)
j. Has a professional archaeological assessment
been done for the tract? Yes _ X No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes X_ No
Are there wetlands on the site? IL Yes - No
Coastal (marsh) X Other
if yes, has a delineation been conducted? No
(Attach documentation, if available)
In addition to the completed application form,. the
following items must be submitted: .
* A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
?ORM DCM-MP-1
ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners. must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber R• Elena Hall
Address 565 Firelgwer Road
Phone Beaufort NC 28516
Name Beverly & Donna Rimmer
Address P O Box 148
Phone Atlantic, NC 28511
Name Jerry r amience General Contractor
Address P O Box 598
Phone Beaufort NC 285 16
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
* A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
* A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day of selp+C? 19 r
Print Name William D Gilmore P F
Signature J)CA
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
- DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to
this proposed project.
(4) Will all, or a part of, the existing culvert be
removed? (Explain) N/A
g. Length of proposed bridge 1 Q 50'
1 BRIDGES
h.
a. Public X_ Private
i.
b. Type of bridge (construction material)
Cored slab concrete
J•
C. Water body to be crossed by bridge
Tributary to Ward Creek
d. Water depth at the proposed crossing at MLW or
NWL +1- 2 0'
Will proposed bridge replace an existing bridge?
X_ Yes No
If yes,
(1) Length of existing bridge 45.8'
(2) Width of existing bridge 19.2'
(3) Navigation clearance underneath existing
bridge +/- 2A
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing imber
bridge (to be removed)
f. Will proposed bridge replace an existing culvert(s)?
Yes X_ No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
Width of proposed bridge (Tear roadway = 20'
Height of proposed bridge above wetlands
+/- 21
Will the proposed bridge affect existing water flow"
Yes _ X No
If yes, explaiii
k. Navigation clearance underneath proposed bridge
+/-24'
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? X_ Yes No
If yes, explain A single span bridge will replace
the existing 3-span bridge Navigable opening.
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes X_ No
If yes, explain
n. Have you contacted the U. S. Coast Guard
concerning their approval?
Yes _ X No
If yes, please provide record of their action.
orm DCM-MP-S
Will the proposed culvert affect existing navigation
! CULVERTS N/A
Water body in which culvert is to be placed
Number of culverts proposed
Type of culvert (construction material, style)
d.
Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
Will the proposed culvert affect existing water flow?
Yes No
if yes, explain
potential? _
If yes, explain
Yes No
Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X_ No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
X Coastal Wetlands _ SAVs - Other Wetlands
If yes,
(1) Length of area to be excavated 5.0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yes
c. Will the placement of the proposed bridge of culvert
require any highground excavation?
X_ Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of area to be excavated 1.5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*TT-1-A c4+ +n 6- /lPtPrmined.
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
if no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
Re,. )3/9-
Form DCM-MP-S
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes -X- No
If yes, give dimension if different from No. 2
above.
b
Will the proposed project require the
any existing utility lines? _ Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes _X- No
If yes, explain in detail None expected. -
Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X No
MHW or NWL? Yes X No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upgrade
and stabilization -
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on h.
highground? X Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
Manasement Erosion Control Measures
What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipment i,e..track hoe. dump truck. motor
grader. etc.)
g. Will wetlands be crossed in transporting equipment
to project site? Yes , X_ No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X_ No
If yes, explain in detail _
NCDQL, Carteret County Replao Nn. 15
Applicant or Project Name
a. Will the proposed project involve any mitigation?
Yes X_ No
If yes, explain in detail
Signature
1 2? ? ?
N f
r
O
S ?
4
Y _ r EAUFORT ' 711E srNAIrS , - -
?/j,G? ?f
_? emery G < M? 1 ne 3. 26
I - <-s-51 I
sG«
. M::E,
CARTERET COUNT)' _
I NORTH CAROLINA
l laU?l nVl,? \
\ ?? ( (Swan r)wrler Is'usncMnv Uev ,IU
Aron
` fart
rtssr, r?''?r ?N°rr vv o
a h I \ Y 2
Poin;(?s_ I Pamlico Be B
<?4ar(R
IOM ef7? - -? Y. NAt'r YVrlOlllt a r I W
Sou
?IanS?
ud 7 creek , ? I??GD ?
Royal
1 ' Hobuc.F,n ` \ \ 4 I rut rteerl
Hol lyrdle
(Cash Corner) ?andamere \ VI r f'•
? Manbel >r;??. ocr coke -??' - ..
A ur .
an?sbo< •3ayboro ` ? Fore qce
Hlance 1 S on G? /' rs`s+/ t ueraovst r r•-
A M L I O = -
Merritl 1?hPrton sville T -r44 i? Pa;srnouth??7f) ncoFr lrrlrf "'^ ??e <e
1Z ?
m ,w/ H°rr°n " -a::.f ?r - .`r\ _ '•'.: a/ er nsr?
w"I 2J.,
1---.
._------?- C<a,r laland' y,,.e,n frrrrf ,
Mne lanj?r g4wln R?ra `'o t'?' lo?a /?? l li
Frtr? soll \ S', o'•S i ?? _
-4 Q'
u +`
f s ' u,n
?. S SI i d * eal<r*f
North ?! ' I .
a l arlowell r? $Ia[y ti
n Hulowe ?I 1T
1.
In Al art
ONC INCH CQUAI S AP I•Ro I N.c.D.o.t
TCAROLINA 7t,,,7i
NO,A-\` ` 5 10 2? 30 $CAIC Ur V4E5 i J (ls
ViV. OF wGRWAYs
CACre?-F7r COUNTY
SR' 415 ON sR 1 152
vntT-K c90 FGARD ?R
APR? E, I9'76
-?
sFte.tr _? Of
a?
Z u) a
3 3
0
1 ?
G
rar
9 U
- Q
'1 ? 0 W
0
}.
ate- a a
0+
J
\ 1 7
P? h>. Q I.,, E --
p` I :•::::;?
J _ a :'•':'•'•' p
J) .. ?.•.
J V :.,.
0
0
? J
N
,i
1 JJ
1
r
7 ?
X11 f\' /;
L11
U
M
Ni
40
nc ra
?i a
4 ?
N
0 Cr•I
?
O p `II
c
cl
?
ro
cr
Z J
u? E
J J
J ?
Lo N
LO iu
I? N
w w
Q Cl
m
wfGle DCo J??
BR. #(5 0 R t
oK c8 or WARP q
u: it
EOGE u r EDGE o r
'A ET! pk C"5 W`rLANOs
Soo `? R _
SECT10H -?
X90!
i
So'
ScAL LC / u= So'poasz l
I
0 ?vADwr9y I=/L L i
i
I PROP. GR,
? ? LOGE G?'
wcTLA11L's
60
00 w t r LA N 0
y1a
50.
/I /0' y?T
FIL L ,?Bo?E- o. N. V/. = -s'65 c r1. yJS,
Gu- .
SILL o.N.w, = 7 D5
r I LL i 3 G!- ' VDS.
To%?L c/?L = 585c?l.Y Ds
,12`tls
?J J44 /1 ,2
?C?,TP•?Q.? ? ?unr£Y
gR, ? c 5 ON 5R' ? ??
o
W Q
Iti pcrL
.V F-? W 11. ? h o
0 -? J Q\?yll
?l z
ri
:. l t
t w
Nr?
GI
V r1 1
M J
a
cftR?e?^e? Co Wry I
LQ -+ 0R- #?5 ON SR LU?2
F
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201
GOVERNOR
September 30, 1998
Mr. Ted Tyndall
Division of Coastal Management
E. NORRIS TOLSON
SECRETARY
Department of Environment and Natural Resources
Hestron Plaza II
151-B Highway 24
Morehead City, North C 557
a,D
Dear Mr. Tyndall;
oCr qp?
Subject: Carte ounty, ReprXement of Bridge No. 15 on SR 1152 over
Tri but ek. State Project No. 5.2151.
?n,I?l%q(1TV fr,lir
The North Carolina Department of Transportation proposes to replace Bridge
No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An
application for replacement of this bridge with a culvert was submitted in September
1996. In response to the concerns of the agencies we have redesigned the project to
conform to their requests. The proposed action will involve replacing the existing 45.8
foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab
bridge. The replacement structure will be 50 feet long and approximately 27 feet wide
(roadway width). This replacement will take place on existing alignment and local traffic
will be detoured along existing roadways.
The new structure is wider than the existing bridge. To facilitate the wider
structure we propose to excavate about 20 cubic yards of material from the coastal
wetland adjacent to the present structure. The construction of the roadway embankment
and the raising of the road grade will result in fill in coastal wetlands and on highground
(see sheet 3 of 4).
We therefore request that the proposed work be authorized under the appropriate
Coastal Area Management Act (LAMA) permit. Enclosed is a permit application for a
CAMA Major Development Permit including permit drawings and a copy of the fee
application check for $250.00 that was submitted with the original application.
2
By copy of this letter, we are also requesting issuance of a 401 Water Quality
Certification from the North Carolina Division of Water Quality.
We do not anticipate requesting an individual permit from the Corps of Engineers
for discharge of dredge or fill material in waters of the United States. We propose to
proceed under General Permit 31 in compliance with Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act
(33 U.S.C. 1344).
If you have any questions or need additional information please call Ms.
Alice N. Gordon at (919) 733-7844 Ext. 307.
Sincerely,
Yti'l/Vt/?"?
William D. Gilmore, P.E., Manager
Planning and Environmental Branch
WDG/ag
Attachments
cc: Mr. David Franklin, COE Wilmington Field Office
Mr. John Dorney, NCDENR, Division of Water Quality
Mr. John Parker, NCDENR, Division of Coastal Management
Mr. Whit Webb, P.E. Program Development Branch
Mr. R. L. Hill, P.E., Highway Design Branch
Mr. A. L. Hankins, P,E., Hydraulics Unit
Mr. William J. Rogers, P.E., Structure Design Unit
Mr. Tom Shearin, P.E., Roadway Design Unit
Mr. C. E. Lassiter, P.E., Division 2 Engineer
Mr. Jimmy Lee, P.E. Bridge Maintenance
FORM DCM-MP- t
1. APPLICANT
a. Landowner:
APPLICATION
(ro be completed by all applicants)
Name N.C. Dept of Transportation
Address n Box 25201
City Raleigh State NC
Zip 27511 Day Phone (912) 733-3141
Fax X912) 733-9794
b. Authorized Agent:
Name
Address
b. City, town, community or landmark
Otway
C. Street address or secondary road number
SR 1325 -
d. Is proposed work within city limits or planning
jurisdiction? Yes X No
e. Name of body of water nearest project (e.g.
river, creek sound, bay) Tributary of Ward Cr
3. DESCRIPTION & PLANNED USE
OF PROPOS D PROJECT
a. List all development activities you propose e.g.
building a home, motel, marina, bulkhead, pier,
and excavation and/or filling activities.
orated timber bridee
Replace existing deteri
with 1 na I cored slab (abutt =e)
City State
Zip Day Phone b. Is the proposed activity maintenance or an
existing project, new work, or both? Both
Fax
C. Project name (if any) Carteret Bridge # I S C. Will the project be for public, private or
commercial use? Public transportation
d. Give a brief description of purpose, use,
Note: Permit will be issued in name of landowner(s), methods of construction and daily operations
and/or project name. of proposed project. If more space is needed,
please attach additional pages. Proposed --
12rQject will be for public transportation.
onstruction will utilize typical road
2. LOCATION OF PROPOSED , onst.,,cti..n Poi W=ent such as track hoe.
PROJECT dump truck, motor grader. etc,
a. County Carteret
I:. l 03/1):
FORM DCM-MP-1
4. LAND AND WATER
a. Size of entire tract N/A
b. Size of individual lot(s) N/A
Approximate elevation of tract above MHW
or NWL +/- 5.0'
d. Soil type(s) and texture(s) of tract
Sand and muck
e. Vegetation on tract Distinhis spicata.
Juncus roemeriamis. Baccharis halimifolia
f.. Man-made features now on tract
45 foot tlmhar hridge
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land
use plan.)
Conservation Transitional
Developed Community
X Rural Other
h. How is the tract zoned by local government?
Not zoned
Is the proposed project consistent with the
applicable zoning? Yes __X_ No
(Attach zoning compliance certificate, if applicable.)
j. Has a professional archaeological assessment
been done for the tract? Yes X_ No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes -X_ No
1. Are there wetlands on the site? _X_ Yes - No
Coastal (marsh) X_ Other
If yes, has a delineation been conducted? No
(Attach documentation, if available)
in. Describe existing wastewater treatment facilities
N/A
n. Describe location and type of discharges to
waters of the state. (For example, surface runoff
sanitary wastewater, industrial/commercial
effluent, "wash down", and residential
discharges.) Surface runoff ong project
o. Describe existing drinking water supply source.
N/A
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
* An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 710203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U. S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
?ORM DCM-MP-1
;ite. Include highway or secondary road (SR)
lumber, landmarks, and the like.
A Stormwater Certification, if one is necessary
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners. must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Wilber & EiP„a uall
Address «? R,rrarnxx?ar Rnad
Phone Beaufort rrr ?u5 t 6
Name Beverly R' n^^^? u immer
Address P. O. Box 148
Phone Atlantic NC 28511
Name Jerry LaxxrrPnra CiPnPral (,OntTlctor
Address P O Box 598
Phone Beaufort u? ?R516
* A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
A check for $250 made payable to the Department
of Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
* A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N. C.
Environmental Policy Act (N.C.G.S. 113A-1 to
10) If the project involves the expenditure of
public funds or use of public lands, attach a
statement documenting compliance with the
North Carolina Environmental Policy Act.
6. CERTIFICATION AND
PERMISSION TO ENTER ON
LAND -
I understand that any permit issued in response to this
application will allow only the development described
in the application. The project will be subject to
conditions and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the day. of 19 Ur
Print Name William D Gi?mnrP P_F
Signature 4?4
Landowner or Authorize Agent
Please indicate attachments pertaining to your proposed
project.
DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to
this proposed project.
(4) Will all, or a part of, the existing culvert be
removed? (Explain) N/A
g. Length of proposed bridge 1 Q 50'
1, BRIDGES
h.
a. Public X- Private
i.
b. Type of bridge (construction material)
Cored slab concrete -
j
Water body to be crossed by bridge
Tributary to Waal (reek
d. Water depth at the proposed crossing at MLW or
NWL +/- 02 ' -
Will proposed bridge replace an existing bridge?
X_ Yes No
If yes,
(1) Length of existing bridge 45.8'
(2) Width of existing bridge 19.2'
(3) Navigation clearance underneath existing
bridge +/- 2 4'
(4) Will all, or a part of, the existing bridge be
removed? (Explain) All of existing timber
bridge (to be removed)Will proposed bridge replace an existing culvert(s)?
Yes 1_ No
Width of proposed bridge (Tear roadway = 20'
Height of proposed bridge above wetlands
+/- 2.0'
Will the proposed bridge affect existing water flow?
Yes 1_ No
If yes, explain
k. Navigation clearance underneath proposed bridge
+/ 4' -
Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? X_ Yes No
If yes, explain A single span bridge will replace
the existing 3-span bridge Nav*-j le opening.
in. Will the proposed bridge cross wetlands containing
no navigable waters? Yes X_ No
If yes, explain
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above n.
the MHW or NWL
Have you contacted the U. S. Coast Guard
concerning their approval?
Yes _X_ No
if yes, please provide record of their action.
orm DCM-IIP-5
N/A
Z CULVERTS
1. Water body in which culvert is to be placed
b. Number of culverts proposed
c. Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert
g. Width of proposed culvert
h. Height of the top of the proposed culvert above the
MHW or NWL
i. Will the proposed culvert affect existing water flow?
Yes No
If yes, explain
Will the proposed culvert affect existing navigation
potential? Yes No
if yes, explain
3 EXCAVATION AND TILT.
a. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
Yes X_ No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
X Coastal Wetlands - SAVs - Other Wetlands
If yes.
(1) Length of area to be excavated 5 0'
(2) Width of area to be excavated 27.0'
(3) Amount of material to be excavated in cubic
yards 20 cubic yards
c. Will the placement of the proposed bridge of culvert
require any highground excavation?
X Yes No
If yes, (For Bent Supports)
(1) Length of area to be excavated 20'
(2) Width of-area to be excavated 1.5'
(3) Amount of material to be excavated in cubic
yards < 1 cubic yard
d. If the placement of the bridge or culvert involves
any excavation, please complete the following:
(1) Location of the spoil disposal area
*T T..1-A c;*P to NP jgptprMjnP.Ci_
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
If no, attach a letter granting permission from
the owner.
* NOTE: Any suitable material will be used as
as backfill for the project.
Revised 03/95
Form DCM-MP-S
(4) Will the disposal area be available for future
relocation of maintenance? Yes X No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes _X_ No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL7 Yes _X _ No
If yes, give dimension if different from No. 2
above.
b. Will the proposed project require the
any existing utility lines? - Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail None expecte -
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material d. Will the proposed project require any work
described in Item d. above) to be placed below channels? Yes X No
MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2
If yes,
(1) Length of area to be filled
(2) Width of area to be filled.
(3) Purpose of fill
Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
_X Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be filled +/- 90'
(2) Width of area to be filled +/- 5'
(3) Purpose of fill Roadway fill for upgt,_
and stabilization
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? X Yes No
If yes,
(1) Length of area to be filled +/- 385'
(2) Width of area to be filled +/- 40'
(3) Purpose of fill Increase level of service
4 L=Ely lLRAL
Will the proposed project involve any mitigation?
Yes X_ No
if yes, explain in detail
e. How will excavated or fill material be kept on site
and erosion controlled? Standard NCDOT Best
Management Erosion Control Measures
What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? Standard roadway construction
equipme (i.e.. track hoe. dump truck, motor
grader etc.)
g. Will wetlands be crossed in transporting equipment
to project site? Yes . X_ No
If yes, explain steps that will be taken to lessen
environmental impacts. Existing road
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
Yes X_ No
If yes, explain in detail _
NCDOT Carteret County- Repl--- DL1,LP Nn. 15
Applicant or Project Name
Signature
IZ???
i
u" t
rrsf? ? llli y2, \
up,
,? ° it • t??' ? t ?'e.lta. o. r i
j, I
Lin
70
ulp
LUX
d u+e Z , ice} S:%r; n._ v •,
' ? ?l' 6w lort• Ma •o .'map a /?- . 1 ? \
Jt` f •?\ \ ?/ `? I ? ? - r?lr y<ois. _ emu-- ° J
µACUHEA ( \C ti ?„ 1 '' ?Z '1? \
CITY ro.-•? a: l `? i .(??r a
Irv e r, i i TIfE STRAITS 4bry 3.926
CO l SCALE
CARTERPT
NORTH CAROLINA
( Quarter- i
S.an B-P
ff Aron
JCor? rate 'I r,,,.
../Polo' ftarr' Pamlico Bca h X `Bov t' t\ 2
tonn 1 . NA7'l -11 lift r ' r I , r
so.
ar?t Creek G (\
Ar o,+ Royal 17 ? \ \ sj s i
' \` Nobix}en \ ? ? rattnrr
` i ..Me sit \ \i?h h5. i? i0
NollyvJle
(Cash Cornell `tan errtere \ ''' ? • ''
CFA .y
Mar?btl 2
aoy 3syboro Itorence / `\ Ouuohe?-?.p 0 _ i
.r uGlr rltoutE
A:haricc on A M L I /' fti'/ ; r: 1
Memtj 1,r187rlon sedle C •]? ?`! /? Por!smoulhf\nroA,/,,/,I
f/ O J
55 P m Icon Rutran K _ r\ 7 .a n••'
tf-v
C itnu \
dar Island
\ Ff l+n//. r 5fp?u tJo?R,`.er 1° Lo's
r R„ i?epch ? M<f.rtwn?s
Q t (- f
n- Inf,Y ? ..
???!!! !? ?V7 ,
- North
t ' arlo..t 11 v f? I Stacy y
av?lock
n,..r ,, Narlowe? IO1 Oaris s? tJI
L N: R rt l? ?? D1 a?lSton
\ y a mylna `* aa'? ? MyT
I_ I (,ILY s
1 '? y I x? ?7 1 Marshal erg
/`/'1 ?_v a\nsfrel • r?la Gl Otictsler
ue,-^ Pint 9,.'t!LSnprt
?'r
I In41,a. ??.
1
UNA belt l
`T CARO
,_ Jl H
"J 3 11 A1 ( OF -It (`. GtiE ?Ir it F !II AI ; APPROC I ];41 ES
of 14(614WAYS
cA rew COUNTY
3R. 415 ON S K 1 152
QKT-K18ofLAO
?
.?
.SFte,et' _[- o-f
• ? ••J -= CSC J 0
4ad / moo/ X CY, ?.?
? < i• 9 ? M
M
3 7-L r7 o n
?. y us ? 1
L
40
.::::;::.?.• . :.:.:..:::::::::: :::•. r Dd
a ri Qt
;;:
?I \ ° a
J t- ?
C,4 7
r
...
V Gam' U ^4 .::::?::: i:.: .• J ? 11 ? 1
t
?
'- -
? .....::.:.:.:
.: ? -- -
•.•:..• o?I S t t5z
rR
ON or
N I
0 Or:
y v ) Ln I '
Its ?
u1 _j ?'.
o } Q I`
ro J +1
c Z 0
1 j
v 1 Q
U_
L/) V-%
w w
Z Z
W W
Q CD
EOGE U F EDGE 0 r
WETLANDS W?rLA DZ
SO O
SECTIO,V
i
X90!
x(90 - -
So
se ? ScAL? ?,i= 50'Nua;z?
/0' vF-z7,
I
1?oADW91 r-/L L '
` PROP. CA,
--? \
I \ EOGE Cr
5
WE tLANOS
S?ci/v,i iJ- /
y/0
-O- 5-0.
50"
FILL 31=IeVk/ 0,N. w, = 7CU, Y Ps
•?j _ ON 5R El
L L vii C' T t} N O's 3 C !- , D, g
rl 7 L GILL l 585 C?i. YDS
tt
ICN
11 t(uRW ? ? Q ??
? ?cr
I
t I
h ?.1 ? ?' i ? r? I OI
r-J
144
??
Cl-
o
Z
V ?I c
N'. C, D o.rt' I
a (? c- f.- ?o uN?r !
? ? ? eR, ?t?N SR 1.12
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
1 ? •
NC ENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
November 24, 1998
Carteret County
DWQ Project # 981025
APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS
Mr. Bill Gilmore
NC DOT
PO Box 25201
Raleigh, NC 27611-5201
Dear Mr. Gilmore:
You have our approval, in accordance with the attached conditions and those listed below, for the purpose of replacing
bridge 15 over Wards Creek, as you described in your application dated November 19, 1998. After reviewing your application,
we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition, you should get any
other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion
Control, Coastal Stormwater, Non-Discharge and Water Supply Water shed regulations. This approval will expire when the
accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application except as modified below. If
you change your project, you must notify us and you may be required to send us a new application.. If the property is sold, the
new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all
conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required
as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the
attached certification and any additional conditions listed below.
1. Sediment and erosion control measures shall adhere to the design standards for sensitive watersheds
(T 15A:04B.0024).
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter
150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-
7447. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone John Domey at 919-733-1786.
F?onn y
Poward, P.E.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Wilmington Field Office
Wilmington DWQ Regional Office
John Domey
Central Files
981025. ltr
Division of Water Duality - Non-Discharge Branch
4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer - 50% recycled/10% post consumer paper