HomeMy WebLinkAbout19981025 Ver 1_Complete File_19981119STATE OF NORTH CAROLINA DEPARTMENT OF TP ANSPORTATION JAMES B. HUNT) R. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 E. MORRIS TOLSON GOVERNOR SECRETARY September 30, 1998 Mr. Ted Tyndall Division of Coastal Management Department of Environment and Natural Resources Hestron Plaza II 151-B Highway 24 ' Morehead City, North G 4n- 2 15 -i Dear Mr. Tyndall { , u(J. 4 Subject: Carte Replacement of Bridge No. 15 on SR 1152 over Ae1?: State Project No. 5.2151. r,.,, The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely,, j (k?a Yk William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP-1 APPLICATION (ro be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Otway C. Street address or secondary road number a. Landowner: SR 1325 - Name T.C. Dept of Transportation d. Is proposed work within city limits or planning jurisdiction? Yes _ X _ No Address p n Box 25201 e. Name of body of water nearest project (e.g. City Raleigh State N river, creek sound, bay) Tributary of Ward -CL Zip 27611 Day Phone (919)733-3141 Fax (919)733-9794 b. Authorized Agent: Name Address City State Zip Day Phone Fax C. Project name (if any) Carteret Bri dge Note: Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Revised 0. 3. DESCRIPTION & PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existingdeteriorated timber bridge with 1 (a) 50' cored slab (abutt Z=J-__ b. Is the proposed activity maintenance or an existing project, new work, or both`? Both C. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Proposed 12rQiect will be for public transportation. Construction will utilize typical road construction equipment such as track hoe, dump truck. motor Qrader etc FORM DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' d. Soil type(s) and texture(s) of tract Sand e. Vegetation on tract Distichis spicata. Juncus roemerianus Baccharis halimifolia in. Describe existing wastewater treatment facilities N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) eurf?^P n,,,^ff along eject Describe existing drinking water supply source. N/A Man-made features now on tract 45 foot timbgLbri?gP g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community Rural Other h. How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes X No (Attach zoning compliance certificate, if applicable.) j. Has a professional archaeological assessment been done for the tract? Yes _ X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No Are there wetlands on the site? _2L Yes _ No Coastal (marsh) X_ Other If yes, has a delineation been conducted? No (Attach documentation, if available) In addition to the completed application form,. the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the FORM DCM-MP-1 site. Include highway or secondary road (SR) number, landmarks, and the like. * A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners.must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber & Rena Hall Address 565 Firetower Road Phone -Beaufort- NC 2U 1 Name Beverly & Donna Rimmer Address P () Box 148 Phone Atlantic NC" 2U 11 Name Jerrv Lawrence, General Contractor Address P O Box 598 Phone Beaufort, NC 2851 h * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am autkiorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 6 day of 19 Print Name William D Gilmore- P.F. -- Signature _I)CA Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. R. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A other sections of the Joint Application that relate to this proposed project. g. Length of proposed bridge 1 & 50' 1. BRIDGES h. Width of proposed bridge Clear roadway = 20' a. Public _X- Private i. Height of proposed bridge above wetlands b. Type of bridge (construction material) +/-2.0, Cored slab concrete j. Will the proposed bridge affect existing water flow? Yes X_ No C. Water body to be crossed by bridge Tributary to Ward Creek If yes, explain d. Water depth at the proposed crossing at MLW or NWL 2.0' k. Navigation clearance undern eath proposed bridge e. Will proposed bridge replace an existing bridge? X_ Yes No 1. Will the proposed bridge affect navigation by If yes, (1) Length of existing bridge 45.8' reducing or increasing the existing navigable (2) Width of existing bridge 19,2' opening? X Yes No ill lace d (3) Navigation clearance underneath existing rep ge w If yes, explain A single sl2an bri an bridge Navig a openine. tin¢s i th bridge +/- 2.4' p s e ex (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber bridge (to be removed), in. Will the proposed bridge cross wetlands containing no navigable waters? Yes X_ No f. Will proposed bridge replace an existing culvert(s)? If yes, explain Yes X_ No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. Have you contacted the U. S. Coast Guard the MHW or NWL concerning their approval? Yes X_ No If yes, please provide record of their action. orm DCM-MIJ-5 Will the proposed culvert affect existing navigation CULVERTS N/A potential? _ If yes, explain L. Water body in which culvert is to be placed ?. Number of culverts proposed Type of culvert (construction material, style) 3. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL Will the proposed culvert affect existing water flow? Yes No If yes, explain Yes No a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X_ No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: _2L Coastal Wetlands _ SAVs - Other Wetlands If yes, (1) Length of area to be excavated 5-0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yards c. Will the placement of the proposed bridge of culvert require any highground excavation? X Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1 5'. (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T r..t., A ?;rP to hP riPtrrmint-d (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. Revised 03/95 Form DCM-MP-5 (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X_ No If yes, give dimension if different from No. 2 above. b. Will the proposed project require the any existing utility lines? - Yes __2L No If yes, explain in detail Will the proposed project require the construction of any temporary detour structures? Yes X_ No If yes, explain in detail None expected. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X_ No MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill £ Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upgrade and stabilization Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X_ Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service 4. GENERAL - a. Will the proposed project involve any mitigation? Yes __2?_ No If yes, explain in detail e. How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best _ Management Erosion Control Measures f. What type of construction equipment will be.used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction _ equip i ?^track hoe,dilmp truck. motor grader etc.) g. Will wetlands be crossed in transporting equipment to project site? Yes . _ X No If yes, explain steps that will be taken to lessen environmental impacts. Existing road h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X_ No If yes, explain in detail MOOT, Carteret 7ounly- Replace Bridge No. 15 Applicant or Project Name Signature all 1r i I I N I I 11 0 2 I 4 THE STRAITS i- - CArig-ZTERET COUPsine 2 3 4 NORTH CAROLINA t,S..,n Qu,rler Uu'1 n1n'(Is'°-Avilp Liao /U C l\ 1 /)/r A ?? I \ r Avon a , ruc 11., `'. rt ACV I ?' `oRorr B°v t O 1 ' t l _ Y P,mliCO Bea h 1 \ i 2 P°IW `?sw N.?,.uia Dll ? I - W IoM 1 . NAM W" GRE'r 1. ti- you ? I O creek lav M. (J t Aid M. ?? Avr Dr, 17 R oyil 3 ? Notn,U?ln ? l _ MS sic ? I1ollyv"le by n \ \ (1 (Cash Caner) '?anQem ere llu R. + Manbelo 1 . \ ouacoke anltbaO ,3,ybol0 Af,/ of . 1' 1/ on . F/t/ t 1. 1 1 A111.6ce A M L I v O Merrill blh? rlon svJlC? Por lsmou lhr???r l1 ohr 55?m(co? R°n°n .. r1. I lent al/ Buv Q,[.y / ,yids ?A?,lro• _ 1s':.f lleV t t._..?i---?- /?/ t?? I I? h /,,/rr 1 I II tr•n11t? ''t„s _ fi 11 0?' nco 'I R r'• crrrnovsE ?. x O F"" ... wild" t n • - LINO-PTH CARO S ?0 - ZO JD SCA((OC 1rn(S 04C .hrH (QUALS APPROI 1 J 141LES 0 --- -- _ Ilk, C- .i .. u'.ra.S nS('-h LQU-t S APPROK :1111.0 mF fERS t.c.p.0.r. )IV. OF N[6UWAY5 ltrew-r COUNTY 3R. 4"15 ON SK 1 152 r nt TK 1,8 o F lit'RD CA vR.1 L' 199'6 iFteer _t- of I a? D O/1/ ?--_ ! 3 -7 G 0 C V? f :r 1!1 F < o t.L - Q -i4 uj a Mp- Q ?1 0?„ r? }::: ? J _.? CIL ? r . 0 3- , "ell ? N- •? li I ? . ? r• t 7 ....•.? .1 c of G. f C1 _ ?. 3 • ? I•? ? •? v T X -4 A ION. Z/ 0 0 ? J N -r J? < L d (? 1 Z r J ? ? j v M hi n tN? Q • \ Q1 4 ? i N o ?qr,`l !J r 1 C Q !U } ? ro C? J u7 ? J IL 0 Lo ?u VN W j- r W Q w Q am-fere you wi t52. QR. fc5 N S orr - cB n e ?R EOGE 0 r EDGE o r 1n1 WE T LAN05 6 rLA NOs SO o ? `' .:. _ p G1 SEC j / v/,/ -/? i y9o? S so-? ScAL? ?o u-6-0"NoQrz /o' vi-97, I 0 w,9DV1,I)1 r-11 L I P R A P. G R, --? E o,E OF, WCTLAIJ U-1 00 wErcaNOS ?;- U)Q r -O- Sol 50. l0' y?lZT. ??%% ?? ,•?i?j? it/? C? FILL IgBO?E o N V/ 5-6, 5' C U, yD,5, t FILL w. = 7(-- u- Y DS• /- T I L L S= / 3 c- `f S /- C?P.fJ ? ??T.Z ? lQi?LK C?,TP?R.? routiriY gR? ? C ? ON SR:: ? t? ?i * IV 11 iti 7? d O ` Ltj - I 1 ? UI-? W ' h ? Lo S 1Q, v I I . C : N Z 7 %' ??! rL! V/ Ia?1 L J J I 0 A? z I J L a? Af`&D. o.`f 0 0 v J l? c c -i i 0R- ..#t ?N sR ? ?? , J DIVISION OF COASTAL MANAGEMENT MEMO TO: FROM: Cyndi Bell NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 16, 1998 Doug Huggett J? SUBJECT: Proposed replacement of Bridge No. 15 on SR 1152 over a Tributary of Wards Creek in Carteret County. In September of 1996, the NC Department of Transportation applied for a CAMA permit to replace the above referenced bridge with four pipe-arch culverts. The subsequent application review resulted in numerous agencies objecting to the project design due to the anticipated adverse environmental impacts to anadromous fish movement. Your agency sent the applicant a letter on November 26, 1996 (DWQ Project No. 961000) asking that they consider utilizing a bridge design as opposed to the originally proposed culvert design. Based upon your letter, as well as correspondence with this office, NCDOT voluntarily placed their project on hold while alternative designs were considered. Ultimately, a revised application was submitted that would utilize a cored-slab bridge design to replace the existing bridge. A small amount of coastal wetland would be impacted along the two end embankments. It,- K ate. Enclosed please find for your review and action a copy of NCDOT's revised permit application, as well as a field investigation report for the original project application. It would be appreciated if you could forward to me a copy of your final action on this matter. If you should have any questions or concerns on the revised application, please feel free to give me a call. P.O. BOX 27687, RALEIGH, NC 2761 1 -7687 / 2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE 919-733-2293 FAX 919-738-1495 AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST-CONSUMER PAPER ,?y.. JAMES B. HUNTJR }h? ?1. OVJERNOR t ?. VMw r. g 1t STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH, N.C. 27611-5201 GOVERNOR September 30, 1998 Mr. Ted Tyndall Division of Coastal Management Department of Environment and Natural Resources Hestron Plaza II 151-B Highway 24 Morehead City, North Carolina 28557 Dear Mr. Tyndall; E. NoRU1s TOLSON SECRETARY RECEIVED OCT 3 0 1998 COASTAL MANAGEMENT Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over Tributary of Ward Creek. State Project No. 5.2151. The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 6) 1WW I. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance P . 'FORM DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: Name N.C. Dept. of Transportation Address P. O. Box 25201 City Raleigh State NC Zip 27611 Day Phone (919) 733-3141 Fax (919) 733-9794 b. Authorized Agent: Name Address City State Zip Day Phone Fax C. Project name (if any) Carteret Bridge # 15 Note: Permit will be issued in name of landowner(s), and/or project name. 2. a. LOCATION OF PROPOSED PROJECT County Carteret b. City, town, community or landmark Otway C. Street address or secondary road number SR 1325 d. Is proposed work within city limits or planning jurisdiction? Yes X_ No e. Name of body of water nearest project (e.g. river, creek sound, bay) Tributary of Ward C? 3. DESCRIPTION & PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existine deteriorated timber bridge with 1 & 50' cored slab (abutt type) b. Is the proposed activity maintenance or an existing project, new work, or both? Both C. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Proposed prQlect will be for public transportation Construction will utilize typical road construction equipment such as track hoe dump truck, motor grader etc Revised 03/95 FORM DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. b d. f. 9. h. 1. k. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' Soil type(s) and texture(s) of tract Sand and muck Vegetation on tract Distichis spicata, Juncus roemerianus. Baccharis halimifolia Man-made features now on tract 45 foot timber bridge What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) _ Conservation Transitional Developed Community X Rural Other How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes X No (Attach zoning compliance certificate, if applicable) Has a professional archaeological assessment been done for the tract? Yes _X No If yes, by whom? Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? _ Yes _X No Are there wetlands on the site? Yes _ No Coastal (marsh) X Other If yes, has a delineation been conducted? No (Attach documentation, if available) M. Describe existing wastewater treatment facilities N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff along prq.ject o. Describe existing drinking water supply source. NIA 5 ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 FORM DCM-MP-1 site. Include highway or secondary road (SR) number, landmarks, and the like. * A Stormwater Certification, if one is necessary. * A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber & Elena Hall Address 565 Firetower Road Phone Beaufort. NC 28516 Name Beverly & Donna Rimmer Address P. O. Box 148 Phone Atlantic, NC 28511 Name Jerry Lawrence Genera] Contractor Address P. O. Box 598 Phone Beaufort. NC 28516 * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. * A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of ?°?? 19 I Print Name _ William D. Gilmore P Signature D'` t Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Public X Private b. Type of bridge (construction material) Cored slab concrete c. Water body to be crossed by bridge Tributarv to Ward Creek Water depth at the proposed crossing at MLW or NWL +/- 2.0' Will proposed bridge replace an existing bridge? X_ Yes No If yes, (1) Length of existing bridge 45.8' (2) Width of existing bridge 19.2' (3) Navigation clearance underneath existing bridge +/- 2.4' (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber bridge (to be removed). Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge 1 @ 50' h. Width of proposed bridge _ Clear roadway = 20' Height of proposed bridge above wetlands +/- 2.0' j. Will the proposed bridge affect existing water flow? Yes X_ No If yes, explain k. Navigation clearance underneath proposed bridge +/- 2.4' Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X Yes No If yes, explain A single span bridge will replace the existing 3-span brie. Navigable opening. in. Will the proposed bridge cross wetlands containing no navigable waters? Yes _Y? No If yes, explain n. Have you contacted the U. S. Coast Guard concerning their approval? Yes XNo If yes, please provide record of their action. Revised 03/95 . Form DCM-MP-5 j. Will the proposed culvert affect existing navigation Z CULVERT N/A potential? Yes No If yes, explain a. Water body in which culvert is to be placed b. Number of culverts proposed 3. EXCAVATION AND FILL C. Type of culvert (construction material, style) a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X_ No d. Will proposed culvert replace an existing bridge? If yes, Yes No (1) Length of area to be excavated If yes, (2) Width of area to be excavated (1) Length of existing bridge (3) Depth of area to be excavated (2) Width of existing bridge (4) Amount of material to be excavated in cubic (3) Navigation clearance underneath existing yards bridge (4) Will all, or a part of, the existing bridge be b. Will the placement of the proposed bridge or culvert removed? (Explain) require any excavation within: .X Coastal Wetlands _ SAVs - Other Wetlands If yes, (1) Length of area to be excavated 5.0' e. Will proposed culvert replace an existing culvert? (2) Width of area to be excavated 27 0' Yes No . (3) Amount of material to be excavated in cubic If yes, yards 20 cubic yards (1) Length of existing culvert (2) Width of existing culvert c. Will the placement of the proposed bridge of culvert (3) Height of the top of the existing culvert above require any highground excavation? the MHW or NWL X Yes No (4) Will all, or a part of, the existing culvert be If yes, (For Bent Supports) removed? (Explain) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1.5' (3) Amount of material to be excavated in cubic yards < 1 cubic vard f. Length of proposed culvert d. If the placement of the bridge or culvert involves g. Width of proposed culvert any excavation, please complete the following: (1) Location of the spoil disposal area h. Height of the top of the proposed culvert above the *Upland site to be determined MHW or NWL (2) Dimensions of spoil disposal area Will the proposed culvert affect existing water flow? Yes No If yes, explain (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. Revised 03/95 * NOTE: Any suitable material will be used as as backfill for the project. Form DCM-MP-S (4) Will the disposal area be available for future b. relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X_ No If yes, give dimension if different from No. 2 above. Will the proposed project require the any existing utility lines? _ Yes X No If yes, explain in detail Will the proposed project require the construction of any temporary detour structures? Yes _X No If yes, explain in detail None expected. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X_ No MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled. (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upgrade and stabilization g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X_ Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service 4. GENERAL a. Will the proposed project involve any mitigation? Yes X_ No If yes, explain in detail How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best Management Erosion Control Measure What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipment (i.e., track hoe. dump truck, motor grader- etc.) g. Will wetlands be crossed in transporting equipment to project site? Yes . _X No If yes, explain steps that will be taken to lessen environmental impacts. Existing road h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X_ No If yes, explain in detail _ NCDOT Carteret County. Replace ridge No 15 Applicant or Project Name Signature 1 21 ?? Date Revised 03/95 ?aq r?ur' .tir.•? - '"J \ ,r (??? ,m Iv vv `t /fi - Pow Pamlico Bea h, ?' Ro..• Bov 1J / Avon IOM _ •r.r.`A[IL[ 1 \ ?' III '`9 I ti Sou -12 z Royal G Holly,dle (Cash Corner) I and\.m ere t'r ~ / ' ` \ ` I ?tte? ?•?o } Mabel \?LvR. -n. /? \\ r[??t /Atd - ? r•,y i?[a,oro ;sarboro ?lr?? ?/?re`ncfe? /' `\.\ Guacoke?-??L11 u?t?CQ A:IlenCe // - Merrrll? G >YP-hrlons".11e ••?r? jti -?\? "r_•_ Z"r" 11 $$? mfco/ Rallan O /nS(.AT?K//?,?. Por lsmov ln? grincoAr /nfrl _. •'• ••?. - J ? • C ienl a?/ ? Bav 'v ?``?.rr`q-1-' / 5 /p?`r? I ?..+. ? _- .r ?r rt`'•rs- _ I ?A([; anc• ?.• / ? _ tt': f Lluv \ .I / ?- ??tif -1 - \r l U r edar Islaria"1-\? 1 \ yf? la fn r toJr \` \ $u ash /nL•I Spuln R?.er -t'] / I 4 ; + f?t• MTnesoll/ Cosa ?1:1_V '.w Y.7 r G_\??y "` ' \ r C tilt !•V y` i .- $• in,, F r 't 'Norlh ? talerr NORTH CAROLINA . ?? ?(f?,1, (_ i \ J ) f • \.L-An ?ual:er? t. u.: n:x•l lt. A, L. 70 ` / / ? ? 1_? ? ?,?^ = \ ?•'o `. , ? 1l. ?~ 19 Tk- uzfi Dil. / p ( (. n:' 6wvlor• Mw .oa [ ' u+E Z ?? ••...'/•4 1? Z?REA (h , \ ( ? ? •;. I ? ? r`F ? ? ?>\ ? 11]2 / A •r %:?`, ! \? CITY HE ._? '_'?i I'? I[ __ '`" J`^?'; ? •?'?'? .s?s.e ? `'/.n` ,? \ ?_;/ - T11E STRAITSJ?? ?- C A TrZ T E R, E- T coul SCALE ? -. - 3 -- - - EAU:[ „„ o M1 - ? ~1!1 °? to \\,{ '/ , i_I 1.S Ul . ? 1 j. ?) ? L?? ? 111E- 19-L I ' a?lock-_'Harlo.e )0 (Stacy 11ff II ?y Hal10.e ?..?! IJT) (\ \ l `? s Ot-a r<fVlll?Ion J'M°C C?`yaP1 r_?=_? ly y •? I"l) 1Mushal er r•` ^'c° rw.r• ,?. ais}'NQ?t?t?., •". eialw• WolicCiler i+!- :J?•. f"t'•.ya.,nh4+.: - a a Inds a:.ld r?" •+sws•• I Ra`.n' NOPTH CAROLI `IA belt l ?•?•.av? d SCALE C( MACS CrC,hiH C^UAIS APPRO[ 13 YI[CS SCAIC Of $1t0-'IRS 01( K)I[CUA($ APPROI 111110++ I 0 JO [0 ra C CR$ ' _ .'I SIC IS ;, x.1101'-:9 "10?R(R$ 1 rr. c.1).6''r pcIV. QF N[?[Ca{jIJRYS /?QTGRI;I uNiY SR• #15MSK 1152 Q Af Z"R I9 0 F W*0 ?R APR L 19(C? .s Ftetr 4 ? JI ? ?_ ?1 ? .o 1 LL " oAT. v J / 2. r ? Vim` :•I•:•:•:•:?`c?/ r_ ?'?^ i I ? I \ ¢ J C? I I I .Y- ? 1 i? cl, fob qz-l ayoX: .::. . o C Ll Lc U M M . 4r Qr L J L Q r ?l W 4 ? N 6 r 1? ? j w Its -, ...t no I? 1 i J v J r IL c L9 lu N W W Lu wre'Re< COUNTY #15' 00 ,OR. T?, t,8 n r7 Wit cR ?.Tyg n II CN ..T, G J gt ? o ? 0 0( 1 ?¢ I j a QL >1 Q_ a \?1 0 V z 0 L V J J J Z 0 . f' a ? o 0 0- 'n V C C C N ?- V i? nf. D o.-T' j cAg-r m- - r Co uOy 8R, ?? oN sR 1.12 i ev ?/V Z, rgle j A DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC Department of Transportation (tributary off Wards Creek) 2. LOCATION OF PROJECT SITE: on SR 1152 and on a tributary off Wards Creek, near the community of Otway, Carteret County Photo Index - 1995: 52-608, T-11 1989: 152-1,1-14 State Plane Coordinates - X: 2732300 Y: 349000 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7-9-96 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - 9-30-96 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret Land Classification From LUP - Rural & Conservation (Primary Nursery Area) (B) AEC(s) Involved: CW,EW,PTA,ES (C) Water Dependent: Yes/No (D) Intended Use: Public (E) Wastewater Treatment: Existing - N.A. Planned -N.A. (F) Type of Structures: Existing - Bridge Planned - Culverts (G) Estimated Annual Rate of Erosion: 0' Source - Personal observation 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands ± 400 ft.2 ± 225 ft.2 spartina alterniflora, juncus roemerianus,distichlis spicata (B) Non-Vegetated Wetlands ± 2,700 ft.2 ± 1800 ft.2 Shallow Water bottom areas (C) Other ± 15,500 ft.2 High ground up 'r (D) Total Area Disturbed: ± 18,200 ft.2 ?-. a d?? 1a (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: Yes 8. PROJECT SUMMARY: The NC DOT is proposing to replace an existing bridge with culverts at a site on SR1152 and over a tributary to Wards Creek, near the community of Otway, Carteret County. 4 FIELD INVESTIGATION REPORT: NC DOT PAGE #2 9. NARRATIVE DESCRIPTION: The NC Department of Transportation (DOT) is requesting a permit to replace an existing bridge with culverts at a site located on SR 1152 and on a tidal tributary of Wards Creek, near the community of Otway, Carteret County. The existing bridge is ± 46' long x 19' wide and has a vertical clearance above the mean high water line of ± 2'. On either side of the bridge a border of coastal wetlands exist which is vegetated primarily by spartina alterniflora, juncus roemerianus, distichlis spicata. The width of the tributary is ± 45' wide except directly underneath the bridge where the headwalls have narrowed the Creek to f 35' wide. Beyond the bridge, the tributary and its adjacent coastal wetlands continues inland for ± 1400' before ending. This tributary and the adjoining Wards Creek has been designated a primary nursery area by the Division of Marine Fisheries. The Creek is also designated as SA and is open to the harvesting of shellfish. DOT is proposing to remove the bridge and replace it with 4 lines of culverts. The culverts will be ± 40 in length, each having a width of ± 8.5' and a height of ± 5.9'. Four feet of fill material will be provided between the culverts which will result in a total crossing width of f 46.3'. To facilitate the installation of the culverts, f 2,700 ft.2 of Creek bottom would be excavated with f 575 ft.2 of Coastal Wetlands being either excavated or filled. Approximately 400 ft.2 of high ground would also be excavated to provide a sufficient opening for culvert installation. The culverts and associated fill would result in a permanent filling of ± 1800 ft.2 of estuarine resources. The construction of the roadway embankment and the raising of the road grade will result in f 50 ft.2 of coastal wetlands and ± 15,500 ft.2 of high ground within the existing road right of way being filled. 10. ANTICIPATED IMPACTS: The project as proposed will result in the excavation of ± 2,700' of shallow water bottom and ± 400 ft.2 of high ground, the excavation and filling of f 625 ft.2 of Coastal Wetlands and the filling of ± 15,500 ft.2 of highground within the existing road right of way. Approx. 45 yds.' of material would be placed below the mean high water line and f 275 yds.' of material would be excavated and trucked off site. Turbidity levels in the immediate area will increase significantly during excavation activities. The negative effects of this increase can be lessened if excavation is timed to periods of least biological activities or turbidity curtains are deployed during construction. Proper erosion control techniques will also need to be undertaken along all disturbed areas during construction in order to prevent sediment runoff from entering adjacent wetland and water areas. There has been various concerns expressed by some federal and state agencies over the years concerning the potential negative impacts of culverts to fisheries resources. These concerns may be amplified since this work is occurring within a designed primary nursery area. PREPARED BY: Charles Jones DATE: October 21, 1996 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Mr. William Gilmore NC DOT PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Gilmore: NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES October 19, 1998 Re: Bridge maintenance over Ward's Creek Carteret County DWQ # 981025 The Division of Water Quality has reviewed your submittal for a CAMA permit replacement of bridge 15 on SR 1152 in Carteret County. Your application was not complete since our processing time will not begin until the CAMA Permit application is received in the Central Office. I can be reached at 919-733-1786 if you have any questions. Until this information is received, I will request (by copy of this letter) that the Corps of Engineers place this project on hold. Also, the project will be placed on hold for our processing due to incomplete information (15A NCAC 2H.0507(a)(4)). Sincerely, J n R. Dorney 'i ?f ater Quality Certi Yiation Program Attachment cc: Wilmington DWQ Regional Office Wilmington District of Corps of Engineers Wilmington Field Office Corps of Engineers John Dorney Central Files 981025.hld Division of Water Duality • Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper SrAn STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH. N.C. 27611-5201 E. NORRis TOLSON GOVERNOR SECRETARY September 30, 1998 Mr. Ted Tyndall _ Division of Coastal Management Department of Environment and Natural Resources Hestron Plaza II ?!? U1:1 P tfi 13 151-B Highway 24 Morehead City, North Carolina 28557 NIEMNDS GRt;Ci Dear Mr. Tyndall; Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over Tributary of Ward Creek. State Project No. 5.2151. The North Carolina Department of Transportation proposes to replace Bridge No., 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit Enclosed is a permit application for a CAMA Major Development Per?it including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance ?ORM DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Otway C. Street address or secondary road number 3. Landowner: SR 1325 rtation s f T d. Is proposed work within city limits or planning po ran Name N.C. Dept o jurisdiction? Yes _X_ No Address n n Box 25201 e. Name of body of water nearest project (e.g. City Raleigh State N river, creek sound, bay) Tributary of Ward Cr 1 Day Phone (919) 733-3141 Zip 2ZSi1 ' _ _ 3. DESCRIPTION & PLANNED USE Fax (919) 733-9794_ OF PROPOSED PROJEC I b. Authorized Agent: Namc Address a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. t1TT1}f .r ltridEe Replace exist'nO rlPtPr,nrnteti with 1 na 50' cored slab (abutt tvnng) City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? . Both Fax C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. Proposed ?tp. ct will be for public transportation. Construction will utilize typical road 2. LOCATION OF PROPOSED constriction Poi . ment each as track hoe. PROJECT dump truck motor gT er, P+c - a. County Carteret FORM DCM-MP-1 4. LAND AND WATER a. C. d. e. E. 9. h. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' Soil type(s) and texture(s) of tract Sand and muc? Vegetation on tract Dist chis spi a a Juncus roemerianus Baccharis halimifolia M. Describe existing wastewater treatment facilities N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff along project Describe existing drinking water supply source. N/A Man-made features now on tract 45 foot timb?r?1?SP What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community Rural Other How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes __X_ No (Attach zoning compliance certificate, if applicable.) Has a professional archaeological assessment been done for the tract? Yes X_ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X_ No Are there wetlands on the site? X Yes - No Coastal (marsh) _2?_ Other If yes, has a delineation been conducted? -ND- (Attach documentation, if available) In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the FORM DCM-MP-1 ;ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners.must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber & Elena Hall Address 565 Fire+^wer Road Phone -Beaufort, NC 28516 Name BeverlL& T?nnna mer Address P O Box 148 Phone Atlantic NC 28511 Name Jetty Lawrence General Contractor Address P O Box 598 Phone Beaufort. NC 28516 A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. * A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of 19 Print Name William D Gilmore p R 6C, Signature Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development _ DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public _X_ Private b. Type of bridge (construction material) Cored slab concrete Water body to be crossed by bridge Tributal:y to Ward Creek d. Water depth at the proposed crossing at MLW or NWL +/ 2.2 e. Will proposed bridge replace an existing bridge? X_ Yes No If yes, (1) Length of existing bridge 45.6' (2) Width of existing bridge 19.2' (3) Navigation clearance underneath existing bridge +/- 2A (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber- bridge (to be removed) Will the proposed bridge cross wetlands containing in. no navigable waters? Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge 1 na 50' h. Width of proposed bridge Clear roadway = 20' Height of proposed bridge above wetlands +/-20' j. Will the proposed bridge affect existing water flow'? Yes X_ No If yes, explain k. Navigation clearance underneath proposed bridge +/ 2A Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X_ Yes No If yes, explain A single span brid.Le will replace the exist ingpan bridge Navigableable onenine. If yes, explain Yes _ X No Have you contacted the U. S. Coast Guard concerning their approval? Yes X _ No If yes, please provide record of their action. orm DCM-MP-S Will the proposed culvert affect existing navigation CULVERTS N/A 1. Water body in which culvert is to be placed ?. Number of culverts proposed Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No If yes, explain potential? Yes If yes, explain a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: Coastal Wetlands - SAVs - Other Wetland, If yes, (1) Length of area to be excavated 5.0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yards Will the placement of the proposed bridge of culvert require any highground excavation? X_ Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1 5' (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T T..I., A ai*a fn ha r'i?tim.. ine..& (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. No Form DCM-MP-S (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes _X No If yes, give dimension if different from No. 2 above. b. Will the proposed project require the any existing utility lines? _ Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X_ No If yes, explain in detail None expecte - e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X_ No MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for "gee and stabi ization - g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on h. highground? X Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service e. How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best Management Erosion Control Measures What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction eauipment?i,?? oe. dump truck. motor grader etc ? Will wetlands be crossed in transporting equipment to project site? Yes . X_ No If yes, explain steps that will be taken to lessen environmental impacts. Existing road Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail _ NCDOT Carteret County. Repla ce Bridge Nn_ I Applicant or Project Name Will the proposed project involve any mitigation? Yes X_ No If yes, explain in detail Signature 1 "19 CARTERET COUN11 1 NORTH CAROLINA - `J \J C '-n Qua, ter uwi n•j, s'usniknp vvv J s• I[tcr r PtmlicO g h ?' ?Ko<.•?Bov (r - /f Pow, 1 t r ??N+wrs`ta+r(e? 1[\j- fOM t - NAr't witDoft `[ewe I l .----_\;\ rl.ll. I. Z) eeu r i. , 4, soy ? ? G? Geek I ? '+Iia \ ? t 4 l` Ar'•o'a OR oyal HoWCFm \ i Mesic ` \ \.c (Cash Comer') ? 1lollynlle \ / ' ?enSlemere \ U ck F/t/orr; 13 IfLeo o '37rboro on Merrell _.-?-v tonsnlle C T "r(? ?? Portsmo Ih_r???lYna oAr P In 10 J 55 / Rullen r• 1' ? da I 01 ent* w+Pine I.?ILa ho?^r S \ ?It•n? ?t ? l7rvm lnlA ciler? icy //.. •rt)iriS, m rni J ~ q I * r y MirsMl erQ e aula / Inrlua? IPcacn . \TnPT H. (' A R L1N? r \t \t rrr[ rfrr\t L' u III I Aron y ''o 0 f 0 o Z USE O I belt t?. r PIV. OF 141614WAYS M rexrf COUP! TY apt. 4H5 ON s K 1 152 Ll hf TR 1,8 o F WARD ?A APR L 196 ,t?o.oj' P . s 4 i N I II r 0 i w ?. 4. I 4 SCAtF Q, C, 72 0 = in < 4 LL M pia CL N `J llyi L? AT' 4 o v?' cY h Q u?? ° ! r:::•:' j t ?l f 0 I ' 04 41. P? ti,?il _ Q .I.,- ? E..I •.•.. r !? 1 Lo V) glee Co - - QR- *(5 00 S 1 i5 ? ,,mss, 01, c8nrWARP EDGE U r EDGE 0 r WETLANpS 1nJ`:'L./aNDS SEC%101,1 -? X90! ' so' So' ?I ScAL ? ? ?? 5o'?oR rz 1 ?= /0' VEJZ7, I ?o,9Dw.9y r- L L i PROP. Gal I c WE tc.aNOS ? ??_? ?- OGE c F WCTLAN L.1 SI L L q 30?E- 0, N U/ SG5 C !!. yvS, t BE le, O',q U, Y P5. r o J 1V 11 f 1.?L l/ vy b Cn - - 1 :zl ICJ c? ? ? ? I I I J ? 0 - I LJ y '? 7 I ?t I Q o 4 i J a Q .a lt? Z ? o `? FC V i I 1 \ J J J f a J I z I? 0 0 -t C' wiwr? s 2 _? ? SL1TT STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 GOVERNOR ...September 30, 1998 si UC_J_ 141. Mr. Ted T dall Division of ?geme t Department 1 i N tural Resources Hestron Plaza II 151-B Highway 24 Morehead City, North Carolina 28557 Dear Mr. Tyndall; E. NoR1us TOLSON SECRETARY Subject: Carteret County, Replacement of Bridge No. 15 on SR 1152 over Tributary of Ward Creek. State Project No. 5.2151. The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of.Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, j (41 & wl,-- - William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office .Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark L. APPLICANT Otw.ay C. Street address or secondary road number 3. Landowner: SR 1325 tation f T d. Is proposed work within city limits or planning ranspor _ Name N.C. Dent o jurisdiction? Yes X_ No Address n Box 75701 e. Name of body of water nearest project (e.g. Raleigh State NC - City river, creek sound, bay) Tributary of Ward Cr Zip 27611 Day Phone (919) 733-3141 3. DESCRIPTION & PLANNED USE Fax (919) 733-9794 OF PROPOSED PROJECT Authorized Agent: b a. List all development activities you propose e.g. . building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Name Replace existing deteriorated timber bridge Address with 1 & 50' cored slab (abutt typ _ City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? Both Fax C. Project name (if any) ('arteret Bridge # 15 c. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. Proposed project will be for public transportation. `onstraction will utilize 1 ipical road n PQ,w ^.nant c„rh ac track h_oe. 2. LOCATION OF PROPOSED construgli PROJECT imp truck motor grader, etc - a. County Carteret - FORM DCM-MP-1 4. LAND AND WATER a. b. C. d. e. E. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' Soil type(s) and texture(s) of tract Vegetation on tract Distic is Sptcaca. Juncus roemerianuS Baccharis halimifolia Man-made features now on tract 45 foot timber bridge g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes __X_ No (Attach zoning compliance certificate, if applicable) Has a professional archaeological assessment been done for the tract? Yes X_ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X_ No Are there wetlands on the site? X Yes - No Coastal (marsh) X_ Other If yes, has a delineation been conducted? N _ (Attach documentation, if available) in. n. 0 Describe existing wastewater treatment facilities N/A Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff along project Describe existing drinking water supply source. N/A In addition to the completed application form, the following items must be submitted: . A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the FORM DCM-MP-1 ;ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners.must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber R. FlPna Nall Address 565 Firetower Road Phone Beaufort. NC 28516 Name Beverly R Donna Rimmer Address P O Box 148 Phone Atlantic NC 2851 1 Name Jerry Lawrence General Contractor Address P n Box 598 Phone Beaufort NC 28516 * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. * A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of 19 Print Name William D Gilmore P E ')?Ati Signature Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development _ DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. I<:.. , ?sca Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge i. 50' 1. BRAS h. a. Public X Private i. b. Type of bridge (construction material) Cored slab concrete j• Water body to be crossed by bridge Tribut= to Ward 'reek d. Water depth at the proposed crossing at MLW or NWL 2.0' k. Will proposed bridge replace an existing bridge? X Yes No If yes, (1) Length of existing bridge 45.8' (2) Width of existing bridge 19.21 (3) Navigation clearance. underneath existing bridge +/-2.4- (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber bridge (to be removed). m. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. the MHW or NWL Width of proposed bridge Clear roadway = 20 Height of proposed bridge above wetlands - +/ 2.0' Will the proposed bridge affect existing water flow? Yes X_ No If yes, explain Navigation clearance underneath proposed bridge +/ 2.4' Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X_ Yes No If yes, explain A singIg apan bridge will replace the existine 3-span bridge Tav.gable opening. Will the proposed bridge cross wetlands containing no navigable waters? Yes _X No If yes, explain Have you contacted the U. S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Rcvi'sC 1 01/05 Form DiCM-MP-5 Will the proposed culvert affect existing navigation t CULVERTS N/A 3. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If Yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW` or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No If yes, explain potential? Yes If yes, explain a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: _X_ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated 5.0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubiC??ards c. Will the placement of the proposed bridge of culvert require any highground excavation? X_ Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1.5' (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T T-I.-A cite to hP AptPrminP.(I_ 2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. No * NOTE: Any suitable material will be used as as backfill for the project. Form DCM-MP-S (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL7 Yes ?X No If yes, give dimension if different from No. 2 above. b Will the proposed project require the any existing utility lines? _ Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail None expected e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X _ No MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled. (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: sY Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upgrade and stabilization - Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X_ Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service 4, GENERAL - a. Will the proposed project involve any mitigation? Yes X_ No If yes, explain in detail e. How will excavated or fill material be kept on site and erosion controlled? Standard NC'DOT Best Management Control Measures What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipment (i.e.. track hoe, dump truck, motor grader etc ) Will wetlands be crossed in transporting equipment to project site? Yes , X_ No if yes, explain steps that will be taken to lessen environmental impacts. Existing road h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes ?X_ No If yes, explain in detail NCDOT Carteret County. Rep] ace Bridgt No. 15 Applicant or Project Name Signature n.l}n S Z Tr' N I LL Ot-Y 'r 1711 M rl ' V]I 4 ?- •- r _I ? ? -- - a?,,.?.i,-'•:--`?1 ?`\°a i. __-` Jam`. ---?..'_'J?- _. .. _ SCALE A MILES CARTERET COUNTY NORTH CAROLINA ?`? ?? ) I \t„ an Ouulc( owl nu?• R'u.nrAliV buy \ fl ?r\ lrr( `, \,\ 1 N Avon J ?O1 ?. Nccr ? t ?' Ro..?Bav t o 2 ? Poln• 1 1 P.mlico Bea h ? - 1 \ IOM !? - , NA r'L wll Otl?lTWf? "' $ou ? Q o l ?.re pia f??l:<on , \ <,I_ LW . A l •? ? Irtb° o? T A ?1 . ?A(t: slPl \?? f lad(ock 't{.rlowr?I 1G SucY ti I (1 i l? fij.? N• R S m rn. ? o dad; s, 3,1s 1 ma'sh4i ell I'Thel 1 n?l.nl? <Kh PNnTRT a 1 ti u?a?h ln(rl , 1 I ?. I. 11(( IfrrYl / rl S I V?O cnrHousf z LINA7, piv. of 14 [614WAYs 3R• 415 ON SK 5152 pi TK t B OF LAU Cie MPPUL, 196 a? 6- r7 0 a .,? r! ? ;lam ?3 a } 1? Nel - 4 ll O ? r , J }- / 4r o O? .;::.. ? ` ?- v v < r• • '. • ? "J I? Vol 04- n:{• • T ` '?l LAY L? :;:a ; •..i•'., .: , ??-. '? Q (J IjI) i? If) 0?1 S 1 t5z ••` r - - #t5' G..:. Ott U M ni rl (r r n 4 ? N ? 0 Cr'1 2 I, 'ul ,,L1 C ro J Z V? J J v = Q^ iL LL IQ W w w q Q f OG E 0 r --- WErLANOS FILL 1?30VE (),y Vi. SG5 c ?, yes. 0 .N. w, = 7C" y Ds. i i O r t ?ju rL W Q .v?? W 11" ? h o spa ? ' E- ;<I Z E I I ?` I i { a? I, a L III ? f J 0 1i Z z 0 l; J J 0 0 - t- C, N N'l fiP. O.-C t 0R- # ? 5 ON sR ? l?2 SUi( STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH. N.C. 27611-5201 GOVERNOR September 30, 1998 Mr. Ted Tyndall Division of Coastal Management Department of Er?yironment and Natural Resources Hestron Plaza II:" r ' - - 151-B Highway 24, ' Morehead City, Ngi-th Car 2#b5 Dear Mr. Tyndall;,,.. 4? 9810 E. Noms TOLSON SECRETARY Subject: Carte ree', o µ eplaceltnent of Bridge No. 15 on SR 1152 over Tributa o 1,Creell. State Project No. 5.2151. ry The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, William D. Gilmore, P.E., Manager Planning and'Wtivironmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT b. City, town, community or landmark Otway C. Street address or secondary road number - a. Landowner: SR 1325 Name N.C. Drpt of Transportation d. Is proposed work within city limits or planning jurisdiction? Yes ---2L- No Address p n Roc 25291 e. Name of body of water nearest project (e.g. City _EgLdgh _ State NC river, creek sound, bay) Tributary of Ward Cr Zip 27611 Day Phone (919) 733-3141 3. DESCRIPTION & PLANNED USE Fax (,919) 733-9794 OF PROPOSED PROJECT b. Authorized Agent: Namc Address City State Zip Day Phone Fax c. 2. Project name (if any) Carteret Bridge # 15 Note: Permit will be issued in name of landowner(s), and/or project name. LOCATION OF PROPOSED PROJECT a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing deteriorated timber bridge with 1 na 5 'cored slab (abutt ?tvpe- b. Is the proposed activity maintenance or an existing project, new work, or both? Both C. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Proposed . ct will be for public transportation. Construction will utilize Wical road constr„rtiQn equipment such as track hoe. dump true motor rate. et[ a. County Carteret- - FORM DCM-MP-1 4. LAND AND WATER in. Describe existing wastewater treatment facilities N/A a. b d. e. f.. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +1-5.01 Soil type(s) and texture(s) of tract Sand and muck Vegetation on tract Distichis spicata. Juncus roemerianus Baccharis halimifolia Man-made features now on tract 45 foot timber bridaP n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff long project o. Describe existing drinking water supply source. N/A g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes X No (Attach zoning compliance certificate, if applicable.) Has a professional archaeological assessment been done for the tract? Yes X_ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X_ No 1. Are there wetlands on the site? _2L Yes _ No Coastal (marsh) _X Other If yes, has a delineation been conducted? No (Attach documentation, if available) In addition to the completed application form,. the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the FORM DCM-MP-1 ;ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners.must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber R. >4tP^a uall Address 565 Firetower Road Phone BeaufoftNr 128516 Name Beverly Donna u immer Address P 0Box 148 Phone Atlantic N(` ?R51 1 Name Jerrv La?x^ P^ce General Contractor. Address P n Box 598 Phone Beaufort, NC 2851 Fj * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of 19 q Print Name William D Gilmore P E I CAI? Signature Landowner or..-..,-. ize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A other sections of the Joint Application that relate to this proposed project. g. Length of proposed bridge 1 Q 50' 1 BRIDGES h. Width of proposed bridge Clear roadway = 20' a. Public X Private i. Height of proposed bridge above wetlands b. Type of bridge (construction material) +/- 2.0' Cored slab concrete j. Will the proposed bridge affect existing water flow'? Yes _ X No C. Water body to be crossed by bridge Tributary to Ward Creek - If yes, explain d. Water depth at the proposed crossing at MLW or NWL +/- 2.0' - k. Navigation clearance undern eath proposed bridge e. Will proposed bridge replace an existing bridge? 2 X_ Yes No Will the proposed bridge affect navigation by 1 If yes, (1) Length of existing-bridge 45.8' . reducing or increasing the existing navigable (2) Width of existing bridge 19 2' opening? X_ Yes No l ll (3) Navigation clearance underneath existing ace rep If yes, explain A single span bridge wi able opening. e Navi brid 3 i i bridge +/- 2A g -span ng g the ex st (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing limb r bridge (to be removed), in. Will the proposed bridge cross wetlands containing no navigable waters? Yes X_ No Will proposed bridge replace an existing culvert(s)? Yes X_ No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. the MHW or NWL If yes, explain Have you contacted the U. S. Coast Guard concerning their approval? Yes X_ No if yes, please provide record of their action. Form DCNI-MIP-5 i. Water body in which culvert is to be placed Number of culverts proposed Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. h. Length of proposed culvert Width of proposed culvert Height of the top of the proposed culvert above the MHW or NWL Will the proposed culvert affect existing water flow? Yes No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3 EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X_ No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated 5.0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yards c. Will the placement of the proposed bridge of culvert require any highground excavation? _X_ Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated If (3) Amount of material to be excavated in cubic yards < I cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T T-1- A cite 4n 1-%P r1PtPrmined- _ (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. Form DCM-MP-S (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes _X_ No If yes, give dimension if different from No. 2 b. Will the proposed project require the any existing utility lines? .- Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X_ No If yes, explain in detail None expecte . above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X No MHW or NWL? Yes X No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _2? Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upy-Lade and stabilization g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X_ Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service 4 GENERAL a. Will the proposed project, involve any mitigation? Yes X_ No If yes, explain in detail e. How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best Management Erosion Control Measures f. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipment (i.e.. track hoe dump tniclc, motor grader etc,) g. Will wetlands be crossed in transporting equipment to project site`? Yes , X_ No If yes, explain steps that will be taken to lessen environmental impacts. Existing road h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail NCDOT Carteret County. R=b &-rl e No 15 Applicant or Project Name Signature I2???' N I I 'I ry ro 2 I 4 h .jr.,; IIaO j THE STRA1 TS / COUNT)? I 0 t-SCALE _ - i NORTH CAROLINA \? a ) /; \t S..+ri Qwrler` bwi rtu?. `lVulnrkr alp U.IV \\ , U • \`J ( i Avon ?? Rrt r1 7 Jc rtacrl ?Ro.rv.Bav\ - t Poin' 1, 1 Psmlico Bea n - ?1?JJJ `(\ I \ g 2 ?I/??? 5 ?µ?atfLR ,? \ I IOM t ,F?? • NAr'L WrlDll!(R ???---?? 1 I W ? ' ?- 1 ?' Avr+ N Mc 1 r -or ? A ?I Hulov.e , --b Y- \ r. r?0,ris J (tr.. .. ,.+ H• ytrl '.? 1 OI t ll ton 11 '?I?„t?' .•?? -'C UFwr, 1f,a,li? Vrn, ?. Y ?"^r \ ' City ? t? c,,?M+I:Aaf er¢ w?, !.. Pint K.vILShnr+ ' Por:-/.• pry^. r:.,: I sett eERRr?( I i i I IL \ `' 2 or c ti vcoke?-? ,p - - ticHrnousf Sumh Lr MI I i I I I INA CA P\01 IPe+`h 1. NOR? - I I0. . ?0 i il. M.4 ?.1 ?.IItS ct.cr?.o.r DIV. pF H1 64WAY-S CR-reW COUNTY SR. *15ONSK 1152 or 9 T-K 1,8 o f GARS Ce belt l APKI ,1,,/ 106 ._. =_i r•,:.to,o.l 1 of ?' 6- X37?»0 72 S w ,? j no „J CL ? ;lam ??, } 3 o _ i-n f r QC V) ` CL ? N • 4 O Q l- ? P h - E- J ••nn ^ r rv ?J ?"? ? y :'I•:•:` C1 i ? ? (?,? 1. -We-e( cowry ?.......•....:..• o IARD U M M ?I 40 tL T J L4 Q C[ 1 N. (?.C 0 C r' o tZ f _ )lj ro ? J 2 L7 J IL i ? LL w N w w Q w Cl . EWE O F" EDGE O r WETLANO:5 W?r?- NOS SFci/o/,/ -/? i y9o? So' -o" 5c-AL?5 S1or/-50"goQsz I PRoP. GR, E?cE cr 00 WEtcaNDS - - - L/1a S 50? SCALE _ % ??= SO ?,'Y?tzfZ, F-IL L 1-?130VE O • N V/. = 565 C Cl, yv.5, FILL 3,-lGvk/ o•N• w = 7GU. Y D5. r I LL i 1"'N DS = / 3 cc(, VD-S /- Tied n , l YXx gR? ? c 5 ON 5R t ?? Cfl 03 _ O t 11 ?rV W Q O tj) W 1 ?? "1 LO s? 1. i J I o- _a c 0. ? y .q ti LQ J !til t-? t z z t o? v J J c IT Its c 0 cR-f?2^e? Co uxPr` 0R- X15 QN sR ?1?, ? d FSU7Z STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 GOVERNOR September 30, 1998 Mr. Ted Tyndall Division of Coastal Management Department of Environment and Natural Resources Hestron Plaza II 151-B Highwy24--:- Morehead City, taf iga Dear Mr. Tyndall; /94% E. NORRIS TOLSON SECRETARY Subject: Cartes , Replacement of Bridge No. 15 on SR 1152 over Tribi t-ft';f V Vd Creek. State Project No. 5.2151. The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. NV 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Otway C. Street address or secondary road number a. Landowner: SR 1325 Name N C Dept of Transportation d. Is proposed work within city limits or planning jurisdiction? Yes X_ No Address n n Roar 25201 e. Name of body of water nearest project (e.g. City Raleigh State NC river, creek sound, bay) Tribut= of Ward Cr Zip 27611 Day Phone (919).7 3. DESCRIPTION & PLANNED USE Fax (911) 733-9794 OF PROPOSED PROJECT b. Authorized Agent: a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier. Name and excavation and/or filling activities. Replace eructing detra oratedl timber brid=e Address with 1 & 50' cored slab (.abutt tyng?_ City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? Both Fax C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. Proposed - -. ct will be for public transportation. Constriction will utilize typical road 2. LOCATION OF PROPOSED construction ?g'?InmPnt e„rh ac tTask hoe. PROJECT dump truck motor grader, etc - a. County Carteret. FORM DCM-MP-1 4. LAND AND WATER M. Describe existing wastewater treatment facilities N/A a. b. C. d. Size of entire tract N/A Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' Soil type(s) and texture(s) of tract Sand and muck Vegetation on tract Digichis spicata. Juncus roemerianus Baccharis halimifolia f.. 9. h. J- n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff along project o. Describe existing drinking water supply source. N/A Man-made features now on tract 45 foot timber-bri?gP What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community X Rural Other How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes __X_ No (Attach zoning compliance certificate, if applicable.) Has a professional archaeological assessment been done for the tract? Yes X_ No If yes, by whom? Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes _ X No In addition to the completed application form,. the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view -and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the 1. Are there wetlands on the site? X Yes - No Coastal (marsh) X_ Other If yes, has a delineation been conducted? N _ (Attach documentation, if available) ORM DCM-MP-1 ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary e A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners.must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber R, Elena Hall Address 565 Firet,,.Yer Road Phone Beaufort Nr ?R5t6 Name Beverly & Donna Rimmer Address P ).Box 148 Phone Atlantic NC 28511 Name Jerry??Pneral Contractor Address P 0 Box 598 Phone Beaufort Nr'IKU) * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. * A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of kr, 19 ' Print Name William D Gilmore P F ,()r-A V_4? L-_ z4t ..- Signature Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-VIP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) N/A other sections of the Joint Application that relate to this proposed project. g. Length of proposed bridge 19 50' 1 BRIDGES h. Width of proposed bridge Clear roadway = 20' a. Public X_ Private i. Height of proposed bridge above wetlands b. Type of bridge (construction material) +/- 2.0' Cored slab concrete - j. Will the proposed bridge affect existing water flow? Yes X_ No C. Water body to be crossed by bridge Tributary to ward Creek If yes, explain d. Water depth at the proposed crossing at MLW or NWL +/- 2.0' - k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? + - 2 X_ Yes No If yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge 45.8' reducing or increasing the existing navigable (2) Width of existing bridge 19.2' opening? X Yes No (3) Navigation clearance underneath existing If yes, explain A single sl2an bridge will replace bridge +/-2.4- the existing 3-span bridge- Nayigal21e.9? (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber bridge (to be removed) in. Will the proposed bridge cross wetlands containing no navigable waters? Yes _X_ No f. Will proposed bridge replace an existing culvert(s)? If yes, explain Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. Have you contacted the U. S. Coast Guard the MHW or NWL concerning their approval? Yes X_ No If yes, please provide record of their action. +orm DCNI-IMP-5 CULVERTS N/A !. Water body in which culvert is to be placed I Number of culverts proposed Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3 EXCAVATION AND FILL. a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes _X- No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: -2L Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated 5.0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yids Will the placement of the proposed bridge of culvert require any highground excavation? X Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1 5' (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T T..t., A a4tr% hP A-tPrmined- 2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. Form DCM-MP-S (4) Will the disposal area be available for future b. relocation of maintenance? Yes _2L No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes Y No If yes, give dimensions if different from (2) above. C. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. Will the proposed project require the any existing utility lines? - Yes X No If yes, explain in detail Will the proposed project require the construction of any temporary detour structures? Yes _ X No If yes, explain in detail None expecte d, e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X No MHW or NWL? Yes X No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled e. How will excavated or fill material be kept on site (2) Width of area to be filled and erosion controlled? Standard NCDOT Best (3) Purpose of fill _ Management Erosion Control Measures Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway- fill for 1 pg ade and stabilization £ What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipment i,e..track hoe,sltl??p truck motor erader-etc 1 g, Will wetlands be crossed in transporting equipment to project site? Yes , X_ No If yes, explain steps that will be taken to lessen environmental impacts. Existing road Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service a. Will the proposed project involve any mitigation? Yes __2?- No If yes, explain in detail h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes _X_ No if yes, explain in detail _ iNCDOT Carteret County, Replace Bridge No. 15 Applicant or Project Name Signature I ? :?. f ?? t_- ? \ I rte; i?`.:- ??? `\`F o: - _ _ J __? ? ??•?_ r ?. ?, H ? I ,I I O 4 srRa?rs ?? .?-_ T ti7 SGIE COUNTS ° 6- -4 NORTH CAROLINA I a (,", '•n Qu?Iltr- or P'u,ni Alnv B.rV ?q Itccr t/rrr ?• ?Rm Ba L I p>Imhco B?h IpM l? - -? < NAr'[ ?v,lDll/E TTrTr?vvtttttt I I Z) GRE r F. I G0 ti Creek rlto \ Awora Royal Ir 3 ,?. 1 `JC\' ` \ \ ?? ' Hotnchm \ • ? Wesle ` / \ \ ? Hollyvdle 5 / ' ? \ ter 'I (C+shCorner) ?•nd•mV. A.rn. \\ manbef 7 Doro ;3arboro Oauohe?,aJ A:li•Ace on ?' Y l Mernlt G rlon svJle C T 'rj? /? Porlsme Ih??0, r,l<odr 7O J 55? w/ Xonan .412`.f A? I 8uv n I Reacr+1. / t ti u?a<h Infrl ? i I I 1I CAROLIN,,V6, L\ 30 (CAL(CE uIIES 0r[ NCH EQUALS ArVROt 13 ItIIES ;° r i. {,ray \1 IcfE Ife \/) i r•S 1v' ?° LF! 4E,yJ ' 13 Avon I X12 i • I O o`Frc _ ••? r AIV. pF N[WWAYS CARTER i COUNTY 13R. x'15 ON SK 1 152 Q K TR 1,8 o F GAO Ge MPKI1, 1r06 4 -L Y7 0 L2111 G a 0 v ` a? 3 Q cY x o < o L1 - Q ,l L o ? J l/ 04 A Q P Q [11 -- 61 / .. r•:• W N w -a 0 0 n ?J I? ^! v 'J 7 J d L ^ r ? J UI L`\1 V) U M hi tL +r Q ?1C ?- 4 ? N o Cr; v o '. r? J ro J o } d ' cr ? . J J J 1?I 1 IL K ? N 41 W Z w w o n r,Po.pfe? o0 CoSP, 1 '15z dR- ?c5 orr - cB o MW CR EpGE U r EDGE Or"' AN05 W?:'c.?NOs ?WEnTL U. O SEC % / oh/ -? I X90_' I So' /o, {/FQT, I Q ?vADwly ?=/? L. r PROP. LOGE b F "1c TL AlJL?3 S6Q 00 WE rLANOS_ " S/_=ci/o/I is _6 Ll? 50, r / P/L L r?130 ?E O , N W, 5 G5 C c!• YDs, FILL 0,,q. v` , = 7C u- Y PS. -ILL 1AlcT% I?NDS= 13 ro ?L CfL L 5g5-???. C?.TP.?R.? ,ouN-i? 8A, 5- olu SK d T ri, 0 ?t 'j? 2 I D L a J lli v1 O n ?J J Irl a1 ? z i a z V `I J 'ua? J 0 Z I 7 IIA I I I I 1 E' ?I 0?1 11 Ar. C P. o.`f ~e?opt Co u p! N?r'Y 2 0R- .. 5 SR ?? SUT[ 0 w ?A STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. 60X25201. RALEIGH. N.C. 27611-5201 GOVERNOR September 30, 1998 Mr. Ted Tyndall Division of Coastal Management Department of Environment and Natural Resources Hestron Plaza 11 151-B Highway 24 _ Morehead City, North Carolin 0 (? . Dear Mr. Tyndall; ;.4 OCT 14 ft ,8.1()1 E. Nowus TOLSON S F.C RETA RY t of Bridge No. 15 on SR 1152 over Subject: Carteret Co oject No. 5.2151. Tributa?,of.t'p Pr I'll ?gxvwel The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (CAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, William D. Gilmore, P.E., Manager Pla*ng and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: Name N.C. Dept of Transportation Address v n Bo 25?01 City Raleigh State Zip 27611 Day Phone (9191733-3141 Fax (419) 733-9794 b. Authorized Agent: Name Address b. C. d e City, town, community or landmark Otway Street address or secondary road number SR 1325 Is proposed work within city limits or planning jurisdiction? Yes -X- No Name of body of water nearest project (e.g. river, creek sound, bay) Tributary of Ward Cr 3. DESCRIPTION & PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing d r;nratPrl t;mher bridge with 1 I cored slab (abutt Za2o- City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? Both Fax C. Project name (if any) Carteret Bridge # 15 c. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. Proposed _pLpjert will be for public transportation. Construction will utilize typical read 2. LOCATION OF PROPOSED construction equipment such as track hoe. PROJECT imp truck motor grader etc a. County Carteret ReviseO 01/9' FORM DCM-MP-1 in. Describe existing wastewater treatment facilities 4. LAND AND WATER N/A CHARACTERISTIC a. Size of entire tract N/A n. Describe location and type of discharges to b. Size of individual lot(s) N/A waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial c. Approximate elevation of tract above MHW effluent, "wash down", and residential discharges.) Surface runoff along project or NWL d. Soil type(s) and texture(s) of tract. Sand and muck o. Describe existing drinking water supply source. e. Vegetation on tract Distichis spicata. N/A Juncus roemerianus Baccharis halimifolia Man-made features now on tract 45 foot timber bridge - g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community _X_ Rural Other h. How is the tract zoned by local government? Not zoned i. Is the proposed project consistent with the applicable zoning? Yes X No (Attach zoning compliance certificate, if applicable.) j. Has a professional archaeological assessment been done for the tract? Yes _ X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X_ No Are there wetlands on the site? IL Yes - No Coastal (marsh) X Other if yes, has a delineation been conducted? No (Attach documentation, if available) In addition to the completed application form,. the following items must be submitted: . * A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the ?ORM DCM-MP-1 ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners. must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber R• Elena Hall Address 565 Firelgwer Road Phone Beaufort NC 28516 Name Beverly & Donna Rimmer Address P O Box 148 Phone Atlantic, NC 28511 Name Jerry r amience General Contractor Address P O Box 598 Phone Beaufort NC 285 16 * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. * A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. * A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of selp+C? 19 r Print Name William D Gilmore P F Signature J)CA Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information - DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge 1 Q 50' 1 BRIDGES h. a. Public X_ Private i. b. Type of bridge (construction material) Cored slab concrete J• C. Water body to be crossed by bridge Tributary to Ward Creek d. Water depth at the proposed crossing at MLW or NWL +1- 2 0' Will proposed bridge replace an existing bridge? X_ Yes No If yes, (1) Length of existing bridge 45.8' (2) Width of existing bridge 19.2' (3) Navigation clearance underneath existing bridge +/- 2A (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing imber bridge (to be removed) f. Will proposed bridge replace an existing culvert(s)? Yes X_ No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL Width of proposed bridge (Tear roadway = 20' Height of proposed bridge above wetlands +/- 21 Will the proposed bridge affect existing water flow" Yes _ X No If yes, explaiii k. Navigation clearance underneath proposed bridge +/-24' Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X_ Yes No If yes, explain A single span bridge will replace the existing 3-span bridge Navigable opening. m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X_ No If yes, explain n. Have you contacted the U. S. Coast Guard concerning their approval? Yes _ X No If yes, please provide record of their action. orm DCM-MP-S Will the proposed culvert affect existing navigation ! CULVERTS N/A Water body in which culvert is to be placed Number of culverts proposed Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL Will the proposed culvert affect existing water flow? Yes No if yes, explain potential? _ If yes, explain Yes No Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X_ No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands _ SAVs - Other Wetlands If yes, (1) Length of area to be excavated 5.0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yes c. Will the placement of the proposed bridge of culvert require any highground excavation? X_ Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of area to be excavated 1.5' (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *TT-1-A c4+ +n 6- /lPtPrmined. (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No if no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. Re,. )3/9- Form DCM-MP-S (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes -X- No If yes, give dimension if different from No. 2 above. b Will the proposed project require the any existing utility lines? _ Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes _X- No If yes, explain in detail None expected. - Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X No MHW or NWL? Yes X No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upgrade and stabilization - g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on h. highground? X Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service e. How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best Manasement Erosion Control Measures What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipment i,e..track hoe. dump truck. motor grader. etc.) g. Will wetlands be crossed in transporting equipment to project site? Yes , X_ No If yes, explain steps that will be taken to lessen environmental impacts. Existing road Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X_ No If yes, explain in detail _ NCDQL, Carteret County Replao Nn. 15 Applicant or Project Name a. Will the proposed project involve any mitigation? Yes X_ No If yes, explain in detail Signature 1 2? ? ? N f r O S ? 4 Y _ r EAUFORT ' 711E srNAIrS , - - ?/j,G? ?f _? emery G < M? 1 ne 3. 26 I - <-s-51 I sG« . M::E, CARTERET COUNT)' _ I NORTH CAROLINA l laU?l nVl,? \ \ ?? ( (Swan r)wrler Is'usncMnv Uev ,IU Aron ` fart rtssr, r?''?r ?N°rr vv o a h I \ Y 2 Poin;(?s_ I Pamlico Be B <?4ar(R IOM ef7? - -? Y. NAt'r YVrlOlllt a r I W Sou ?IanS? ud 7 creek , ? I??GD ? Royal 1 ' Hobuc.F,n ` \ \ 4 I rut rteerl Hol lyrdle (Cash Corner) ?andamere \ VI r f'• ? Manbel >r;??. ocr coke -??' - .. A ur . an?sbo< •3ayboro ` ? Fore qce Hlance 1 S on G? /' rs`s+/ t ueraovst r r•- A M L I O = - Merritl 1?hPrton sville T -r44 i? Pa;srnouth??7f) ncoFr lrrlrf "'^ ??e <e 1Z ? m ,w/ H°rr°n " -a::.f ?r - .`r\ _ '•'.: a/ er nsr? w"I 2J., 1---. ._------?- C<a,r laland' y,,.e,n frrrrf , Mne lanj?r g4wln R?ra `'o t'?' lo?a /?? l li Frtr? soll \ S', o'•S i ?? _ -4 Q' u +` f s ' u,n ?. S SI i d * eal<r*f North ?! ' I . a l arlowell r? $Ia[y ti n Hulowe ?I 1T 1. In Al art ONC INCH CQUAI S AP I•Ro I N.c.D.o.t TCAROLINA 7t,,,7i NO,A-\` ` 5 10 2? 30 $CAIC Ur V4E5 i J (ls ViV. OF wGRWAYs CACre?-F7r COUNTY SR' 415 ON sR 1 152 vntT-K c90 FGARD ?R APR? E, I9'76 -? sFte.tr _? Of a? Z u) a 3 3 0 1 ? G rar 9 U - Q '1 ? 0 W 0 }. ate- a a 0+ J \ 1 7 P? h>. Q I.,, E -- p` I :•::::;? J _ a :'•':'•'•' p J) .. ?.•. J V :.,. 0 0 ? J N ,i 1 JJ 1 r 7 ? X11 f\' /; L11 U M Ni 40 nc ra ?i a 4 ? N 0 Cr•I ? O p `II c cl ? ro cr Z J u? E J J J ? Lo N LO iu I? N w w Q Cl m wfGle DCo J?? BR. #(5 0 R t oK c8 or WARP q u: it EOGE u r EDGE o r 'A ET! pk C"5 W`rLANOs Soo `? R _ SECT10H -? X90! i So' ScAL LC / u= So'poasz l I 0 ?vADwr9y I=/L L i i I PROP. GR, ? ? LOGE G?' wcTLA11L's 60 00 w t r LA N 0 y1a 50. /I /0' y?T FIL L ,?Bo?E- o. N. V/. = -s'65 c r1. yJS, Gu- . SILL o.N.w, = 7 D5 r I LL i 3 G!- ' VDS. To%?L c/?L = 585c?l.Y Ds ,12`tls ?J J44 /1 ,2 ?C?,TP•?Q.? ? ?unr£Y gR, ? c 5 ON 5R' ? ?? o W Q Iti pcrL .V F-? W 11. ? h o 0 -? J Q\?yll ?l z ri :. l t t w Nr? GI V r1 1 M J a cftR?e?^e? Co Wry I LQ -+ 0R- #?5 ON SR LU?2 F STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 GOVERNOR September 30, 1998 Mr. Ted Tyndall Division of Coastal Management E. NORRIS TOLSON SECRETARY Department of Environment and Natural Resources Hestron Plaza II 151-B Highway 24 Morehead City, North C 557 a,D Dear Mr. Tyndall; oCr qp? Subject: Carte ounty, ReprXement of Bridge No. 15 on SR 1152 over Tri but ek. State Project No. 5.2151. ?n,I?l%q(1TV fr,lir The North Carolina Department of Transportation proposes to replace Bridge No. 15 over the Tributary of Ward Creek on SR 1152 near Otway in Carteret County. An application for replacement of this bridge with a culvert was submitted in September 1996. In response to the concerns of the agencies we have redesigned the project to conform to their requests. The proposed action will involve replacing the existing 45.8 foot long by 19.2 foot wide (roadway width) timber bridge with a cored concrete slab bridge. The replacement structure will be 50 feet long and approximately 27 feet wide (roadway width). This replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is wider than the existing bridge. To facilitate the wider structure we propose to excavate about 20 cubic yards of material from the coastal wetland adjacent to the present structure. The construction of the roadway embankment and the raising of the road grade will result in fill in coastal wetlands and on highground (see sheet 3 of 4). We therefore request that the proposed work be authorized under the appropriate Coastal Area Management Act (LAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00 that was submitted with the original application. 2 By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the North Carolina Division of Water Quality. We do not anticipate requesting an individual permit from the Corps of Engineers for discharge of dredge or fill material in waters of the United States. We propose to proceed under General Permit 31 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms. Alice N. Gordon at (919) 733-7844 Ext. 307. Sincerely, Yti'l/Vt/?"? William D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/ag Attachments cc: Mr. David Franklin, COE Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. John Parker, NCDENR, Division of Coastal Management Mr. Whit Webb, P.E. Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P,E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. C. E. Lassiter, P.E., Division 2 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance FORM DCM-MP- t 1. APPLICANT a. Landowner: APPLICATION (ro be completed by all applicants) Name N.C. Dept of Transportation Address n Box 25201 City Raleigh State NC Zip 27511 Day Phone (912) 733-3141 Fax X912) 733-9794 b. Authorized Agent: Name Address b. City, town, community or landmark Otway C. Street address or secondary road number SR 1325 - d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek sound, bay) Tributary of Ward Cr 3. DESCRIPTION & PLANNED USE OF PROPOS D PROJECT a. List all development activities you propose e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. orated timber bridee Replace existing deteri with 1 na I cored slab (abutt =e) City State Zip Day Phone b. Is the proposed activity maintenance or an existing project, new work, or both? Both Fax C. Project name (if any) Carteret Bridge # I S C. Will the project be for public, private or commercial use? Public transportation d. Give a brief description of purpose, use, Note: Permit will be issued in name of landowner(s), methods of construction and daily operations and/or project name. of proposed project. If more space is needed, please attach additional pages. Proposed -- 12rQject will be for public transportation. onstruction will utilize typical road 2. LOCATION OF PROPOSED , onst.,,cti..n Poi W=ent such as track hoe. PROJECT dump truck, motor grader. etc, a. County Carteret I:. l 03/1): FORM DCM-MP-1 4. LAND AND WATER a. Size of entire tract N/A b. Size of individual lot(s) N/A Approximate elevation of tract above MHW or NWL +/- 5.0' d. Soil type(s) and texture(s) of tract Sand and muck e. Vegetation on tract Distinhis spicata. Juncus roemeriamis. Baccharis halimifolia f.. Man-made features now on tract 45 foot tlmhar hridge g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? Not zoned Is the proposed project consistent with the applicable zoning? Yes __X_ No (Attach zoning compliance certificate, if applicable.) j. Has a professional archaeological assessment been done for the tract? Yes X_ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes -X_ No 1. Are there wetlands on the site? _X_ Yes - No Coastal (marsh) X_ Other If yes, has a delineation been conducted? No (Attach documentation, if available) in. Describe existing wastewater treatment facilities N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface runoff ong project o. Describe existing drinking water supply source. N/A In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the ?ORM DCM-MP-1 ;ite. Include highway or secondary road (SR) lumber, landmarks, and the like. A Stormwater Certification, if one is necessary A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners. must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Wilber & EiP„a uall Address «? R,rrarnxx?ar Rnad Phone Beaufort rrr ?u5 t 6 Name Beverly R' n^^^? u immer Address P. O. Box 148 Phone Atlantic NC 28511 Name Jerry LaxxrrPnra CiPnPral (,OntTlctor Address P O Box 598 Phone Beaufort u? ?R516 * A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND - I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day. of 19 Ur Print Name William D Gi?mnrP P_F Signature 4?4 Landowner or Authorize Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge 1 Q 50' 1, BRIDGES h. a. Public X- Private i. b. Type of bridge (construction material) Cored slab concrete - j Water body to be crossed by bridge Tributary to Waal (reek d. Water depth at the proposed crossing at MLW or NWL +/- 02 ' - Will proposed bridge replace an existing bridge? X_ Yes No If yes, (1) Length of existing bridge 45.8' (2) Width of existing bridge 19.2' (3) Navigation clearance underneath existing bridge +/- 2 4' (4) Will all, or a part of, the existing bridge be removed? (Explain) All of existing timber bridge (to be removed)Will proposed bridge replace an existing culvert(s)? Yes 1_ No Width of proposed bridge (Tear roadway = 20' Height of proposed bridge above wetlands +/- 2.0' Will the proposed bridge affect existing water flow? Yes 1_ No If yes, explain k. Navigation clearance underneath proposed bridge +/ 4' - Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X_ Yes No If yes, explain A single span bridge will replace the existing 3-span bridge Nav*-j le opening. in. Will the proposed bridge cross wetlands containing no navigable waters? Yes X_ No If yes, explain If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. the MHW or NWL Have you contacted the U. S. Coast Guard concerning their approval? Yes _X_ No if yes, please provide record of their action. orm DCM-IIP-5 N/A Z CULVERTS 1. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert g. Width of proposed culvert h. Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No If yes, explain Will the proposed culvert affect existing navigation potential? Yes No if yes, explain 3 EXCAVATION AND TILT. a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X_ No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: X Coastal Wetlands - SAVs - Other Wetlands If yes. (1) Length of area to be excavated 5 0' (2) Width of area to be excavated 27.0' (3) Amount of material to be excavated in cubic yards 20 cubic yards c. Will the placement of the proposed bridge of culvert require any highground excavation? X Yes No If yes, (For Bent Supports) (1) Length of area to be excavated 20' (2) Width of-area to be excavated 1.5' (3) Amount of material to be excavated in cubic yards < 1 cubic yard d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area *T T..1-A c;*P to NP jgptprMjnP.Ci_ (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? Yes No If no, attach a letter granting permission from the owner. * NOTE: Any suitable material will be used as as backfill for the project. Revised 03/95 Form DCM-MP-S (4) Will the disposal area be available for future relocation of maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes _X_ No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL7 Yes _X _ No If yes, give dimension if different from No. 2 above. b. Will the proposed project require the any existing utility lines? - Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail None expecte - e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes X No MHW or NWL? Yes X_ No If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled (2) Width of area to be filled. (3) Purpose of fill Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _X Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled +/- 90' (2) Width of area to be filled +/- 5' (3) Purpose of fill Roadway fill for upgt,_ and stabilization g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled +/- 385' (2) Width of area to be filled +/- 40' (3) Purpose of fill Increase level of service 4 L=Ely lLRAL Will the proposed project involve any mitigation? Yes X_ No if yes, explain in detail e. How will excavated or fill material be kept on site and erosion controlled? Standard NCDOT Best Management Erosion Control Measures What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard roadway construction equipme (i.e.. track hoe. dump truck, motor grader etc.) g. Will wetlands be crossed in transporting equipment to project site? Yes . X_ No If yes, explain steps that will be taken to lessen environmental impacts. Existing road h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X_ No If yes, explain in detail _ NCDOT Carteret County- Repl--- DL1,LP Nn. 15 Applicant or Project Name Signature IZ??? i u" t rrsf? ? llli y2, \ up, ,? ° it • t??' ? t ?'e.lta. o. r i j, I Lin 70 ulp LUX d u+e Z , ice} S:%r; n._ v •, ' ? ?l' 6w lort• Ma •o .'map a /?- . 1 ? \ Jt` f •?\ \ ?/ `? I ? ? - r?lr y<ois. _ emu-- ° J µACUHEA ( \C ti ?„ 1 '' ?Z '1? \ CITY ro.-•? a: l `? i .(??r a Irv e r, i i TIfE STRAITS 4bry 3.926 CO l SCALE CARTERPT NORTH CAROLINA ( Quarter- i S.an B-P ff Aron JCor? rate 'I r,,,. ../Polo' ftarr' Pamlico Bca h X `Bov t' t\ 2 tonn 1 . NA7'l -11 lift r ' r I , r so. ar?t Creek G (\ Ar o,+ Royal 17 ? \ \ sj s i ' \` Nobix}en \ ? ? rattnrr ` i ..Me sit \ \i?h h5. i? i0 NollyvJle (Cash Cornell `tan errtere \ ''' ? • '' CFA .y Mar?btl 2 aoy 3syboro Itorence / `\ Ouuohe?-?.p 0 _ i .r uGlr rltoutE A:haricc on A M L I /' fti'/ ; r: 1 Memtj 1,r187rlon sedle C •]? ?`! /? Por!smoulhf\nroA,/,,/,I f/ O J 55 P m Icon Rutran K _ r\ 7 .a n••' tf-v C itnu \ dar Island \ Ff l+n//. r 5fp?u tJo?R,`.er 1° Lo's r R„ i?epch ? M<f.rtwn?s Q t (- f n- Inf,Y ? .. ???!!! !? ?V7 , - North t ' arlo..t 11 v f? I Stacy y av?lock n,..r ,, Narlowe? IO1 Oaris s? tJI L N: R rt l? ?? D1 a?lSton \ y a mylna `* aa'? ? MyT I_ I (,ILY s 1 '? y I x? ?7 1 Marshal erg /`/'1 ?_v a\nsfrel • r?la Gl Otictsler ue,-^ Pint 9,.'t!LSnprt ?'r I In41,a. ??. 1 UNA belt l `T CARO ,_ Jl H "J 3 11 A1 ( OF -It (`. GtiE ?Ir it F !II AI ; APPROC I ];41 ES of 14(614WAYS cA rew COUNTY 3R. 415 ON S K 1 152 QKT-K18ofLAO ? .? .SFte,et' _[- o-f • ? ••J -= CSC J 0 4ad / moo/ X CY, ?.? ? < i• 9 ? M M 3 7-L r7 o n ?. y us ? 1 L 40 .::::;::.?.• . :.:.:..:::::::::: :::•. r Dd a ri Qt ;;: ?I \ ° a J t- ? C,4 7 r ... V Gam' U ^4 .::::?::: i:.: .• J ? 11 ? 1 t ? '- - ? .....::.:.:.: .: ? -- - •.•:..• o?I S t t5z rR ON or N I 0 Or: y v ) Ln I ' Its ? u1 _j ?'. o } Q I` ro J +1 c Z 0 1 j v 1 Q U_ L/) V-% w w Z Z W W Q CD EOGE U F EDGE 0 r WETLANDS W?rLA DZ SO O SECTIO,V i X90! x(90 - - So se ? ScAL? ?,i= 50'Nua;z? /0' vF-z7, I 1?oADW91 r-/L L ' ` PROP. CA, --? \ I \ EOGE Cr 5 WE tLANOS S?ci/v,i iJ- / y/0 -O- 5-0. 50" FILL 31=IeVk/ 0,N. w, = 7CU, Y Ps •?j _ ON 5R El L L vii C' T t} N O's 3 C !- , D, g rl 7 L GILL l 585 C?i. YDS tt ICN 11 t(uRW ? ? Q ?? ? ?cr I t I h ?.1 ? ?' i ? r? I OI r-J 144 ?? Cl- o Z V ?I c N'. C, D o.rt' I a (? c- f.- ?o uN?r ! ? ? ? eR, ?t?N SR 1.12 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director 1 ? • NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 24, 1998 Carteret County DWQ Project # 981025 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS Mr. Bill Gilmore NC DOT PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Gilmore: You have our approval, in accordance with the attached conditions and those listed below, for the purpose of replacing bridge 15 over Wards Creek, as you described in your application dated November 19, 1998. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Water shed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Sediment and erosion control measures shall adhere to the design standards for sensitive watersheds (T 15A:04B.0024). If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611- 7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. F?onn y Poward, P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DWQ Regional Office John Domey Central Files 981025. ltr Division of Water Duality - Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer - 50% recycled/10% post consumer paper