Loading...
HomeMy WebLinkAbout19980389 Ver 1_Complete File_19980501State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director 6 04 A T?FA NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 12, 1998 Alamance County DWQ Project 980389 APPROVAL of 401 Water Quality Certification Mr. David Robinson NC DOT PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Robinson: You have our approval, in accordance with the attached conditions and those listed below for the purpose of a bridge replacement over Big Alamance Creek, as you described in your application dated May 1, 1998. After reviewing your application, we have decided that this impact is covered by General Water Quality Certification Numbers 3101 and 3114. These Certifications allow you to use Nationwide Permit Numbers 12 and 33 when they are issued by the Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. in 1 , re on Howard, Jr. P. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Winston-Salem DWQ Regional Office Mr. John Dorney Central Files 980389.1tr Division of Water Quality • Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10%a post consumer paper PRE-DISCHARGE NOTIFICATION PCN TO: National Marine Fisheries Service Pivers Island, NC FAX (919)728-8796 US Fish & Wildlife Service Raleigh, NC FAX (919)956-9336 State Historic.Preservation office Raleigh, NC PAX (919)733-8653 NC Division of water Quality Raleigh, NC rAX (919)733-9959 NC Wildlife Resources Commission Creedmoor, NC E'Al( (919) 528-9839 1. ACTIO =I9-9820792 2. APPLICANT: NCDOT/IBR12/NC62/8.1470701/H-2501 3. DATE OF TRANSMITTAL: 5/11/98 4. RESPONSE DEADLINE(5 days from transmittal): 5/15/98 5. COMMENT DEADLINE(10 days from response deadline): 5/26/98 6. SEND COMMENTS TO: RALEIGH REGULATORY FIELD OFFICE RALEIGH, NC ATTN: Eric Alzmayer FAX (919)876-5823 we are also forwarding the attached PCN to the Fish and Wildlife Service and the National Marine Fisheries Service for review and comment concerning any likely affect to any threatened or endangered species or their critical habitat within those agencies' jurisdiction. 10'd 8T :0T 866T'L0'S0 %N01b1nS38 H91318M WOMB STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH. N.C. 27611-5201 E. NORRIS TOLSON GOVERNOR SECRETARY April 24, 1998 U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 Attention: Mr. Eric C. Alsmeyer MAY- ?ggg F u'?;. NCDOT Coordinator I .i ? WETLANDS G hi' Dear Sir: E,I UALITY SE.!.i IN ' Subject: Alamance County, Replacement of Bridge No. 12 over Big Alamance Creek on North Carolina 62, Federal Aid Project No. BRSTP-62(1), State Project No. 8.1470701, T.I.P. No. B-2501, Action I.D. 19950100. On August 16, 1995 the North Carolina Department of Transportation distributed a Categorical Exclusion document for the above referenced project proposing to proceed under a Nationwide Permit in accordance with 33 CFR Appendix A (B-23). On August 28, 1995 the Corps of Engineers verified the issuance of NWP 23 (Corps of Engineers Action I.D. 19950100). The CE document stated that no jurisdictional wetlands would be affected by the construction of the project. Project design now requires the relocation of a 200 mm water line and a 150 mm gas line under the creek and placement of cofferdams in the creek to facilitate construction. The current location of the water line is preventing the construction of one and possibly two -- shafts. We expect that the utility line relocatio authorized under Nationwide P it 12 and the cofferdam authorized under-- tde 33. Both lines will be relocated within the existing right-of-way between Stations 4+74 to Station 6+86 Line-L-. The water line will be located parallel to and approximately 13 meters (43 feet) upstream of the bridge inside the right-of-way. The gas line will be located parallel to and approximately 1.5 meters (5 feet) left (upstream) of the proposed water line and approximately 1.5 meters (5 feet) inside the right-of-way. The length of each utility line under the creek will be 35 meters (115 feet). Impacts on jurisdictional surface waters will be temporary. No clearing will occur in jurisdictional areas. Following installation of one-half of the water line, the area will be backfilled with material originally removed from the excavation to a depth of at least one foot. The backfilled area will be tamped and the coffer dam system moved to the remaining half of the river. The final half of the water line will be installed in a fashion similar to the first half and the cofferdam system removed. A track hydraulic excavator will be used to place the cofferdam and the utility line. It is anticipated that the contractor will perform an additional excavation parallel to and four feet from the water line installation for the gas line. It is anticipated that this excavation will proceed along with the water line installation. Preconstruction contours will be restored to the creek bed. All material resulting from excavation will be placed so that it is not dispersed by currents or other forces. Any excess material will be removed to upland areas and exposed- stream banks stabilized immediately upon completion. The enclosed drawings (Sheets 4 to 7 of 7) describe the two options for the proposed cofferdams. Option 1 consists of cofferdams composed of temporary concrete barriers covered with plastic and weighted with sand bags. This option will result in 0.016 acres of temporary fill in surface waters. 2. Option 2 consists of cofferdams composed of Class 1 and 2 rip-rap weighted with sand bags. This option will result in 0.021 acres of temporary fill in surface waters. This option will allow the contractor to work when the water level is above 3 feet. Restoration Plan: The natural streambed and plant material will not be removed. No permanent fill will result from the subject activity. Reference elevations are available for the area of proposed construction of the cofferdams. Following completion of the utility line relocations all material used in the construction of the cofferdams will be removed and disposed of in an upland location or reused by the contractor. The temporary fill area will subsequently be restored to its approximate original contour and rough surface texture. The temporary impact area is expected to recover naturally, since the natural streambed and plant material will not be removed. The NCDOT does not propose any additional planting in this area. Schedule: The work will commence on May 1, 1998 and be completed by August 31, 1998. The work to be completed within this time frame includes the construction of the cofferdam, all work associated with the placement of the utility lines, removal of the cofferdams, and completion of the restoration plan. Enclosed are sketches of the structures, project site map and preconstruction notification form for the utility line replacement. The NCDOT hereby requests the issuance of Nationwide 12 and Nationwide 33 permits authorizing relocation of the utility lines and construction of the cofferdams. We anticipate the 401 General Certification will apply to this project, and are providing seven copies of these documents to the North Carolina Department of Environment and Natural Resources, Division of Water Quality, for their review. 3 If you have any questions or need additional information please call Ms. Alice N. Gordon at 733-7844 Ext. 307. SincereI , David C. Robinson, Ph.D., P.E. Assistant Manager - Environmental Services Planning and Environmental Branch DCR/hrs Attachment cc: Mr. David Franklin, Corps of Engineers, Wilmington Field Office Mr. John Dorney, NCDENR, Division of Water Quality Mr. Whit Webb, P.E., Program Development Branch Mr. R. L. Hill, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. William J. Rogers, P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. J. W. Watkins, P.E., Division 7 Engineer Ms. Stacy Y. Baldwin, P.E., P & E Project Planning Engineer 3/25/96 DEM ID: 950858 CORPS ACTION ID:19950100. 199820275 T.I.P.No B-2501 NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT 4):12 and 33 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT. 1.OWNERS NAME:NC Dept of Transportation: Planning & Environmental Branch 2. MAILING ADDRESS: P.O. Box 25201 SUBDIVISION NAME: CITY: Raleigh STATE: NC ZIP CODE: 27611 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): 3. TELEPHONE NUMBER (HOME): (WORK):919-733-3141 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: David C. Robinson, Ph.D., P.E. Assistant 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Alamance NEAREST TOWN OR CITY: Alamance 1 SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): 6. IMPACTED OR NEAREST STREAM/RIVER: Big Alamance Creek RIVER BASIN: Cape Fear 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES [ ] NO [x] IF YES, EXPLAIN: 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)?YES[ ] NO[x] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [x] NO [ ] IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION) : 19950100, 199820275 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ ] NO [x] IF YES, DESCRIBE ANTICIPATED WORK: _ 9a. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 9b. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 2 10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: FLOODING: EXCAVATION: OTHER: DRAINAGE: TOTAL ACRES TO BE IMPACTED: 0 10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION):N/A LENGTH BEFORE: FT AFTER: WIDTH BEFORE (based on normal high water contours): WIDTH AFTER: FT AVERAGE DEPTH BEFORE: AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: X CHANNEL EXCAVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: cofferdam 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? N/A WHAT IS THE EXPECTED POND SURFACE AREA? 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS: 8 1/2" X 11" DRAWINGS ONLY): See attached sheet 1 to 7 of 7 and description of project in rover letter 13. PURPOSE OF PROPOSED WORK: To install 200mmDI water pipe in accordance with plans. 3 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS): N/A 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES [x] NO [] (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [x] NO [ ] b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES [x] NO [ ] IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. See CE QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 4 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET OR THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e. WHAT IS LAND USE OF SURROUNDING PROPERTY? f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OF THE U.S. MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM. 4liq - 15S- OWNER'S/AGENT'S SIGNATURE DATE (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED (18g.)) 5 FIGURE 1 a4 ?^ ? ? r ,O Ao c l- f- mti on . if L161I.YC[? < 0 ? n f, c? 'L m In ct L Ln '[101" _ - ; 11 A -[•? x l l >r ? 4 11 - " Ib ? "' k = it FF g'?• O M m O S r4 ,IS,1? c D-- 27 rr\NC m m n °m p ° 11 ? i o m ? II o L i+ m o = :. ?? F o It 5 II III • Itl',O ? ?w T,W •KI ;aI ?r r? nrs, r?>m zo Z° ir°.,o ?zr•.o t-? ? SAO Zmr> <m ,00 JOV ?N2N O mo N> N Nyn Z E N? 0 ?? O m 0 0 o m me me°r', Nr s° sm 4 °v 3 '^ 2 y N C 4° N NNi 6o OZ an O 2>O 1 o m . r•r r, a o ?? 3p 3TZ r> C CN n??N p ?? rn H i v Q'->ia n iC _' Oy •?..0 A mr^ ' -,a .ohm O 9L iq 3 p'n .O 4p ?Oim m j ? O ti N Z m Dm N Nr °n ..z O: O lL ?' rpiHm m a p' ? s n ?? n n ?? < o ,.. c N N - r' II CHARLIE N. MOORE - D0 392 PC 405 • 11 2469 S. M. 1 ? I x many Il x ? ?? Jo DUKE POWER CO. ecILnSens ne15.N, a., Lcn x ?`• r? ^ ? SI CHARLIE M. MOORE DB 376 PC 726 n ,tAS 2023 S.M. Ir tw - _ ? ? n r v t Tz ° oam Ohio nor 1 < { NI a 4r •1 L+1 t1 - YNr f . mp y Un 'o i n? on ;3?z 0 0 L2 ? SC 4.51.681 ,•. ? a r ._. N m ? w o N ? ? m n N m m ^ ti n ? ;° LA A o o °N n a tno F v -I m > c: n.^. i a Atm d r o? > +??^ 23 6'RAVEL X ? ?+3 / UI r 'r/ ° N 61 O ti\ ? O r j ?0 ''ri ? J move II i' L p o , f?J m l ?f ?? rt' I ? 4, Z a r -9 I I ?a Cl --4 zC` ZG) ?q °u • = r r > - ''A rCHt 7' EJ.F p { m N r m m SE£ SHEEr 6. q ' z n D C U 0 2 y n - ? D ? D ? nSD ^ y ` D '•. Y ? D ? ? 2 SO I 1 O 3 M• HALL. 1011,1 L 08 695 243 650 5. .4. / G r t.. yit. t.„a J .` ?. ARLEEH P. OLDHAM 00 547 PC 917 23S S.N. 5 0 J p_ 3 ( / CARL TON M. SIJIT4 ` D8 249 PC 309 223 S.N. tl ?? 171 ?.I D 9 m P • 00 00 vv vv a3 Y N N N N a ^ oo• 00 .[sw- OoAoo v z? z i TExIE A. 3" s v D9 467 P A V C, rD 725 S nnno -4 3 m AO?• O .,'tom a Z p H l z ° ..mvmm m m i m o 0 n -. m G ' 0 D o r n m 'z c = DO Iv [ t: ° A x i 0 ??? '/ ?ll ].t lr .. f ?I I?? :8N ^y 4 yP P 'Ja •01 ? ? - o ll A' {.E 1.2 f F w? 1 o _ N 'EIF ? ti q+00 4 / ? O d _ K o,. vm CN> JN IO Iz 0 O N S 1 OO O O ? to v i v v 9 O I ? I a O v l? 17({ A V N / 4?N rtc moo P?? m o N r. / ? • 3: I 0 0?0 / mm?? L H < ADD ~ mo m m o a % / In v z C1 `; m O b 6+p0 m a N p g8 1W T .?` ?NA3 0?, I QUA O W D`I,7 \\l u ?° r- r n oN r oo r D ? 7? i? Nm rn???`?y ?? <cvr?tp 7 n l l i i u u II o a NOp?9? AN m N a . C, > r -1 O 0 0 V O N Q , J n ^??l^ai 3 oNl°'il u?$?n z Ri n - I ? ? .GOUO s OOON Cn 3N ? O \ a 0 3 3 3 3 3 0 3 I J?? SO v F A C A A C-7 G ? i 3? C 1 v lu i oC W: E $T dH `A :ST 0£d b f ..: o 1 - I -?I I I 1 I I [.T - 7 7T I f N ?. . X 1 - i .1 I I I I ?' :_ 1 x I 1 Z :I 1, 1 - 1 E 01 1 i I I 'O ?i zl 1 PROP. MH L I ::i i L w STAB +60 : ` - t l -.n ...? .: y.w f jm l 1 I.s. 1. } - -1 I I I ? ? -- 1 I - - _ - . ..... 1 1 t k- - t t PR OP. M H - 77 IA I Itn I I? 1 I4 ? , I 1 I I 1 I 1 \ \ I 1 ? ? I I TEMP. CAUSEWAY WITH 100MM STONE BASE (TYP.) • ?• I z I 1 10 5 0 1 z 1 0 ? ? ? N 1 J I I c? I SCALE IN METERS 6+2 - - ' ' 1 m I I 0 1 Au) cli ' z ' M L -? ?- \ D ? \ ?1 1 I I 'r\ 6+0 I I I I MEDIA \y, BARRI R o 1 I 1 1 SANDBAGS ' ?? or I I I 1 I I a (?+ I I 200MM \\ ??? q?j,?N \ WAGER PIPE ' '` . • cF ' C^1 I 5+80 `. I I N `.• ; ?LLJ 1 OC . 1 Lij I 1 • ? ,I I I ? I I +60 - 0 ° 5 1 I 1 0 1 CLASS II ; RIP- , 1 l 1 RAP TYP ' ' ?? ' ( ) • I ?, 1 1 ?1 1 1 I I 5+40 I I I 1 1 1 1 1 I 1 I 1 I N. C. DEPT. OF TRANSPORTATI 1 DIVISION OF HIGHWAYS OPTION 1 ' ' ALAMANCE COUNTY 1 PROJECT 8.1470701 (B-2501 P I 0 1\I T P 11'1 I I Replacement of Bridge No. 12 e Big Alamance Creek and approathche ? ? 1 1 I I ? ? 1 I ?, 1 1 TEMP. CAUSEWAY WITH 100MM STONE BASE (TYP.) % ?`- '? -•`., ? z ? 1 10 5 0 i z 1 +20 i ¢ 1 SCALE IN METERS 6 O 1 4 F 04 ; ? ' Z 1 M Cn : ? I 1 1 - D ' CLASS I & II ?1 RIP- RAP M WITH SANDBAGS n 1 \ - n' 6+0 1 `1 I 1 ? CD I I 1 1 c. ca 1 I ? ' 0M ' ' - - ? a 1 1 I 1 M 0 YP) rt q?yg ' ,,' \ P0PE WATER ' '• NcF ' •, 0 19 5+80 1 1 1 X 1 ? ' ui ' 0o , ? • •• 1 I I 1 1 I 1 I +60 L P10 ° 1 1 1 1 5 o ' , I 1 o° 0 1 1 o ? o CLASS II ' RIP- I l 1 RAP (TYP) '• ' ?? ' 1 • ` 1 i •1 1 1 5+40 1 I 1 1 I I 1 1 1 1 1 1 1 1 N. C. DEPT. OF TRANSPORTAT] DIVISION OF HIGHWAYS ' ' ALAMANCE COUNTY OPTION 2 ? PROJECT 8.1470701 (B-2501 p 1 0 K' \ / T MAI 1 Replacement of Bridge _a 12 ov( Big Alamance Creek andnd approacn( ch LO 00 (0 LO udi LO C\j I 0 n v i CD I J 1 v W T CO ?- J 3u'C W J U CD M LL O Lr fr I O? J ,LO Z U) I L LO O T N Ii L1 T 0 W 0 CD O Q LL F.. LL C\A 1 ' W J ? I O Q O O + LO (n fD O ut LO T I I J J LLl O O co + O LO O J LL o 0 O 0 O a J r Cr I M (D ZI + Lf) cD m 0 U) Z 0 a Q = co Z N UU) 3 M o w H U 3 w w 2 ~ a U w a ~ N o s a a Or H w S ? N Q N m H Q odd z II H V) W J ? U ? N 0 0 N N a a 0 0 N. C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS ALAMANCE COUNTY PROJECT 8.1470701 (B-2501) Replacement of Bridge No. 12 over Big Alamance Creek and approaches on N.C. 12 in Alamanca Co. SHEET 6 OF 7 R /W 37M 158 156 154 152 150 EXIST. BRIDGE SANDBAGS 148 MEDIAN BARRIER 146 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - OPTION 1 "*\-RIVER BED TEMP. FILL IN SURFACE WATERS=.006 HECTARE (.016 AC.) 158 156 154 152 150 148 1:1 SLO 146------- )G E OPTION 2 RIVER BED TEMP. FILL IN SURFACE WATERS=.008 HECTARE (.021 AC.) N. C. DEPT. OF TRANSPORTATI( CROSS-SECTION DIVISION OF HIGHWAYS ALONG CREEK ALAMANCE COUNTY PROJECT 8.1470701 (B 2501) Replacement of Bridge No. 12 over Big Alamance Creek and approaches on N.C. 12 in lamance Co. SHEET OF 7 R/W