Loading...
HomeMy WebLinkAboutWQ0019908_Staff Report_20200715State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report FORM: WQROSSR 04-14 Page 1 of 5 To: NPDES Unit Non-Discharge Unit Permit No.: WQ0019908 Attn: Ranveer Katyal Facility name: Country Club of JOCO Johnston County From: Rick Trone Choose an item. Regional Office Note: This form has been adapted from the non-discharge facility staff report to document the review of both non- discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or No a. Date of last site visit: 9/26/2019 b. Site visit conducted by: Rick Trone c. Inspection report attached? Yes or No d. Person contacted: Mr. Andrew Stephens and their contact information: (919) 934-4166 ext. e. Driving directions: 694 Country Club Road, Smithfield, NC 2. Discharge Point(s): Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Classification: River Basin and Sub-basin No. Describe receiving stream features and pertinent downstream uses: II. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility Classification: Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or No If no, explain: 3. Are site conditions (soils, depth to water table, etc.) consistent with the submitted reports? Yes No N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? Yes No N/A If no, please explain: 5. Is the proposed residuals management plan adequate? Yes No N/A If no, please explain: DocuSign Envelope ID: 62E1EE55-ED57-4166-8B81-03FE61CB0109DocuSign Envelope ID: 0EA4317C-270E-4955-9706-910EACEAA2C4 FORM: WQROSSR 04-14 Page 2 of 5 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? Yes No N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? Yes No N/A If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: Pretreatment Program (POTWs only): III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? Yes or No If no, please explain: Description of existing facilities: See permit Proposed flow: NA Current permitted flow: NA Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.). None 3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately assimilating the waste? Yes or No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? Yes or No If yes, please explain: 5. Is the residuals management plan adequate? Yes or No If no, please explain: NA 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No If no, please explain: 7. Is the existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? Yes or No If no, please explain: 10. Were monitoring wells properly constructed and located? Yes No N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? Yes No N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude DocuSign Envelope ID: 62E1EE55-ED57-4166-8B81-03FE61CB0109DocuSign Envelope ID: 0EA4317C-270E-4955-9706-910EACEAA2C4 FORM: WQROSSR 04-14 Page 3 of 5 ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ 12. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? Yes or No Please summarize any findings resulting from this review: During last inspection facility was found to not have an Operations and Maintenance Plan. An O&M plan still has not been submitted to the regional office. Additionally, the facility was issued NOV-2019-PC-0055 for failing to submit NDMR for 10 months of 2018. A recent BIMS pull shows the facility has not submitted NDMR for several months of 2019 and 2020. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable: NA 13. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No If yes, please explain: 14. Check all that apply: No compliance issues Current enforcement action(s) Currently under JOC Notice(s) of violation Currently under SOC Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.): See NOV-2019-PC-0055, NOV-2019-PC-0415, NOD-2019-PC-0207 in Laserfiche. If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? RRO requested O&M plan and will likely begin enforcement actions for failure to submit NDMR. Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? Yes No N/A If yes, please explain: Failure to submit NDMR as required. 16. Possible toxic impacts to surface waters: Irrigation runoff is a potential concern. 17. Pretreatment Program (POTWs only): DocuSign Envelope ID: 62E1EE55-ED57-4166-8B81-03FE61CB0109DocuSign Envelope ID: 0EA4317C-270E-4955-9706-910EACEAA2C4 FORM: WQROSSR 04-14 Page 4 of 5 IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? Yes or No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an additional information request: Item Reason O&M Plan Facility did not have this document during the 2019 compliance inspection and one has never been submitted to RRO. 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: Hold, pending receipt and review of additional information by regional office Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 6. Signature of report preparer: Signature of regional supervisor: Date: DocuSign Envelope ID: 62E1EE55-ED57-4166-8B81-03FE61CB0109 7/15/2020 DocuSign Envelope ID: 0EA4317C-270E-4955-9706-910EACEAA2C4 FORM: WQROSSR 04-14 Page 5 of 5 V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS DocuSign Envelope ID: 62E1EE55-ED57-4166-8B81-03FE61CB0109DocuSign Envelope ID: 0EA4317C-270E-4955-9706-910EACEAA2C4