Loading...
HomeMy WebLinkAboutWQ0041802_Application (FTSE)_20200702ALRIK CONSULTING GROUPPLLC Engineers & Planners TRANSIVIVAI LETTER To: Firm License t,e P-1199 Washington Regional Office DATE: JECT V r7s, July 2, 2020 Water Quality Section ATTENTION: 943 Washington Square Mall s Washington, NC 27889 SUBJECT: Legacy Park Apartments Fast Track Application - Sanitary Sewer Main YOU:❑ Town of Ayden, Pitt County, North Carolina Under Separate Cover Via: [Type text here] the following items: =SENDINGG er ❑ Plans ❑ Specifications ® Other: gs ❑ Prints ❑ Permits r ❑ Reproducible ❑ Samples COPIES DATE DWG. # DESCRIPTION Permit Application Fee ($480.00) 2 Cover Letter for Fast Track Applications 2 Fast -Track Permit Application - (Sanitary Sewer Main Ext.) 2 I Flow Tracking/Acceptance from Town of Ayden 2 � I i i Flow Tracking/Acceptance from CMSD 2 Site Location Maps THESE ITEMS ARE TRANSMITTED AS CHECKED BELOW: ® For Approval ❑ Approved as Submitted ❑ For Your Use ❑ Approved as Noted ❑ As Requested ❑ Returned for Corrections ® For Review & Comment ❑ Disapproved ❑ Submit copies for approval ❑ Submit —copies for distribution ❑ Return_ corrected prints ❑ Other: COMMENTS: Please see attached Fast Track Sewer Extension Application and supporting documentation for review and approval. If there are any questions regarding this application or if any further information is needed, please do not hesitate to contact me at 252-646.2257 or dan.withers@arkconsultinggroup.com. COPY TO: Dat'VWUhev'b, f .E. Signature ARK CONSULTING GROUP, PLLC 6317 DATE INVOICE NO, COMMENT AMOUNT NETAMOUNT 07/02/2020 480.00 DATE07/02/20 VENDOR NCDEQ TOTAL 480.00 ARK CONSULTING_ GROUP, PLLC 2755B:CHARLES BLVD GREENVILLE, NC 27858 252-558-0888 www.arkconsultinggroup.com PAY Four Hundred Eighty and no/100 TO THE NCDEQ ORDER OF FIRST CITIZENS BANK 6317 239 FAYETTEVILLE ST RALEIGH. NO 27601 66-30/531 DATE CHECK CHECKAMOUNT 07/02/20 6317 $480.00 11.0063171I• 1:0531001001:007210152a23L,0 AUTHORIZED SIG(AA9RE RK CONSULTING GROUP, PLLc July 2, 2020 NCDEQ - DWR - Fast Track Sewer Extension 948 Washington Square Mall Wilmington, NC 27889 RE: Legacy Park Apartments NCAC 02T.0300 Fast Track Sewer System Extension Town of Ayden, Pitt County, NC To Whom It May Concern, Enclosed is a sewer extension application with supporting documentation for the proposed multi -family development in Pitt County. The proposed extension consists of approximately 1800 feet of new gravity sanitary sewer mains and appurtenant facilities. The enclosed documents include the following items: • Check in the amount of $480.00 • Fast Track Sewer System Extension Application • Flow Tracking for Sewer Extension Applications • Site Map On behalf of the applicant, Town of Ayden, we respectfully request that you grant a permit for construction of this sewer system. With best regards, Ark Consulting Group, PLLC J. Dantzler Withers, P.E. Project Manager KCONSULTING GROUP, PLLC July 2, 2020 NCDEQ - DWR - Fast Track Sewer Extension 948 Washington Square Mall Wilmington, NC 27889 RE: Legacy Park Apartments NCAC 02T.0300 Fast Track Sewer System Extension Town of Ayden, Pitt County, NC To Whom It May Concern, Enclosed is a sewer extension application with supporting documentation for the proposed multi -family development in Pitt County. The proposed extension consists of approximately 1800 feet of new gravity sanitary sewer mains and appurtenant facilities. The enclosed documents include the following items: • Check in the amount of $480.00 • Fast Track Sewer System Extension Application • Flow Tracking for Sewer Extension Applications • Site Map On behalf of the applicant, Town of Ayden, we respectfully request that you grant a permit for construction of this sewer system. With best regards, %=-C J. Dantzler Withers, P.R. Project Manager 2755-B Charles Boulevard, Greenville, NC 27858 252-558-0888 www.arkconsultinggroup.com State of North Carolina R Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dtvislon of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engincerina practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. 9 Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303.O '2 Projects not eligible for review via the fast track process (must be submitted for full technical review): 9�, l ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; w "'vo /y ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; �'�i � ep? 9 ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; o�i�. 0 ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; '9, ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); isr ➢ Vacuum sewer systems. C, General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page I of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T 0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) 1. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Progerty Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEW For more information, visit the Division's collection systems wehsite INSTRUCTIONS FOR FORM: ETA 04-I6 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791.4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bartle, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pander (910)796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Water Quality Section Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DW R) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Ayden (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Keith Murohv per 15A NCAC 02T .0106(b) Title: Director of Public Works & Utilities 4. Applicant's mailing address: 4061 East Avenue City: Ayden State: NC Zip: 28513- 5. Applicant's contact information: Phone number: (252) 481-5817 Email Address: kmurphyaa avden.com ❑ Privately -Owned Public Utility ❑ Other II. PROJECT INFORMATION: 1. Project name: Legacy Park Apartments 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: W000_ 3. County where project is located: Pitt 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.46861' Longitude:-77.43453° 5. Parcel ID (if applicable): 12206 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: J. Dantzler Withers License Number: 38746 Firm: Ark Consultinu Group, PLLC Mailing address: 2755-B Charles Blvd. City: Greenville State: NC Zip: 27858 Phone number: (252) 565-1017 Email Address: dan.witherst7a arkconsultineeroup.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Contentnea Metropolitan Sewer District Permit Number: NCO032077 Owner Name: Contentnea Metropolitan Sewer District V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00269 Owner Name(s): Town of Ayden FORM: FTA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [-]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM- DEV) been attached? ❑ Yes [-]No ®N/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM• HOA) been attached? [:)Yes [:)No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial _% Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If yes, provide a copv of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow',s No. of Units Flow 2-Bedroom Apartments 240 gaVUnit 144 34560 GPD gall GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 34560 GPD a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114j shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 34560 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1800 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).* ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(t)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (e) ➢ I SA NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: ® Yes [—]No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer includiniz in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaage ➢ If noncompliance with 02T.0305(f) or (g). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per I5A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [-]No Per 15A NCAC 02T.0 I 05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Pal NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? /o If No, complete and submit the Variance/Altemative review. Aooroval of the request is reauired prior 2. Professional Engineer's Certification: (Professional Engineer's name ❑ No application (VADC 10-14) and supporting documents for Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. .....................iYlYili ..................... �p� North Carolina Professional Engineer's seal, signature, and date: , to ���` CAROB �'•, SEAL 38746 6A171=20 3. Applicant's Certification per 15A NCAC 02T .0106(b): ha J r— attest that this application for & title from A placation Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: t—aD ice( Date: �Q FORM: FTA 04-I6 Page 5 of 5 D State of North Carolina Department of Environmental Quality Division of Water Resources 4s 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION `Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC IC .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents E Required unless otherwise noted B. Cover Letter (Required for All Application Packages): E List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): E Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): E Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. E The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. E The Professional Engineer's Certification on Page 5 of the application shall be signed, seated and dated by a North Carolina licensed Professional Engineer. E The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T 0106(b). Per I5A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page I of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) 1. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .01 15(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Curriluck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pander (910)796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Water Quality Section Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: ETA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DW R) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Town of Avden (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Keith Murn per 15A NCAC 02T .0106(b) Title: Director of Public Works & Utilities 4. Applicant's mailing address: 4061 East Avenue City: Avden State: NC Zip: 28513 5. Applicant's contact information: Phone number: 2( 52) 481-5817 Email Address: kmurohy avden.com ❑ Privately -Owned Public Utility ❑ Other H. PROJECT INFORMATION: 1. Project name: Legacy Park Apartments 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Pitt 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.46861 ° Longitude:-77.43453' 5. Parcel ID (if applicable): 12206 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: J. Dantzler Withers License Number: 38746 Finn: Ark Consulting Group, PLLC Mailing address: 2755-B Charles Blvd. City: Greenville State: NC Zip: 27858 Phone number: (252) 565-1017 Email Address: dan.withers(a)arkconsultinggroup.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Contentnea Metropolitan Sewer District Permit Number: NCO032077 Owner Name: Contentnea Metropolitan Sewer District V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00269 Owner Name(s): Town of Arden FORM: FTA 04-16 Pagel of 5 V1. GENERAL REQUIREMENTS I . If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes []No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM, DEV) been attached? ❑ Yes [:]No ®N/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM 7 HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: jQQ% Domestic/Commercial _% Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? [:)Yes ®No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(t)) Daily Design Flow'•" No. of Units Flow 2-Bedroom Apartments 240 gal/Unit 144 34560 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 34560 GPD a See 15A NCAC 02T .0114(b), (d) (e)(I) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T 0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 34560 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I . Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1800 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ➢ 15A NCAC 02T.0305(fl contains minimum senarations that shall he nrnvided fnr sewer sysremv ® Yes ❑ No Setback Parameter" Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal hijzh water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet TOP slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T 0305(g,) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ "Stream classifications can be identified using the Division's NC Surface Water Classifications webma e ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 0213.02009 ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per I SA NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or [:)Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T 0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the reouest is required prior to submittal of the Fast Track Application and suimortine documents. 2. Professional Engineer's Certification: name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may .include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): SEAL 1 ' 38746 : - that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of 5 Dkisloo of Wafer nf-sources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: a—w n o-f AJ&I Project Name for which flow is being requested: Legacy Park Apartments More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: _ b. WWTP Facility Permit #: AlIflows are in MGD, c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 9� o� ✓G yco�. tiyo oN.. Q,,_ FO II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** PS 10 Unknown 0.2592 0.1037 0.0205 0.000 0.0205 0.0832 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Ayden Downstream Permit Number: WSQC00269 Page I of 6 FTSE 10-18 III. Certification Statement: I " Q' A ao- ne- S certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signature of Signing Official 6- 30 Date Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section 11 where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Plow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] It. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD, There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD It. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section 11 List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Finn capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg. Tributary Flow Plus Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available (Name or Number) MGD (Firm / pf) MGD MGD Flow Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately O.OI MGD per year; and that c. A funded capital project that will provide the required plamred capacity, namely is in design or under construction with planned completion in and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014 This eject is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015 Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not vet tributary flows in amounts that exceed the firm pump station capacities identified in Section 11 above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18 State of North Carolina Division of Water Resources Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: &-o n p � 1z 44erl Project Name for which flow is being requested: Legacy Park Apartments More than one FTSE neay he required fora single project if the owner of the WWTP is not responsihle far all nip stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plank,9 ✓G u� a. WWTP Facility Name: b. WWTP Facility Permit #: o p �O� A11 flows are in M 1� O c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / po, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** PS 10 Unknown 0.2592 0.1037 0.0205 0.000 0.0205 0.0832 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project correction point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Ayden Downstream Permit Number: WSQC00269 Page I of 6 FTSE 10-18 III. Certification Statement: I ; A 3Ont_ S certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signature afSigning �- 30 -aoao Date Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) r Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not vet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + fJ h. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg. Tributary Flow Plus Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available (Name or Number) MGD (Firm / pf) MGD MGD Flow Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18 State of North Carolina R Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Ayden Project Name for which flow is being requested: Legacy Park Apartments More than one FTSE tiny be required for a single project if qne olmer of the WWTP is not responsible for all ptunp stations along the route of the proposed wasteipaterJlop. IN c Complete this section only if you are the owner of the wastewater treatment plant. oo a. WWTP Facility Name: Contentnea Metropolitan Sewerage District 9m °Fy b. WWTP Facility Permit M NCO032077 � O c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used Allfluivs are to MG" 20 3.5 BR 9n- 1.838 .0346 2.363 67.51 % Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. (A) Design Average Daily Firm Flow** Capacity, * (Firm / pt), MGD MGD Hwy 11 WQCS00080 7.5 (B) Approx. Current Avg. Daily Flow, MGD 1.27 (C) (D)=(B+C) (E)=(A-D) Obligated, Total Not Yet Current Flow Tributary Plus Daily Flow, Obligated Available MGD Flow Capacity*** .49 1.76 1.24 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the 1ltinimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NCO032077 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Charles M. Smithwick, Jr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable, Tbis analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. M Signing Date Page 2 of 6 FTSE 10-18 aaml&wa C/ff&W'400aw dvewez �e �04atrz4ct CMSD POST OFFICE BOX 477 GRIFTON, NORTH CAROLINA 28530 CHARLES M. SMITHWICK, JR. DISTRICT MANAGER July 1, 2020 Mr. Dan Withers, PE ARK Consulting Group, PLLC 2755-8 Charles Blvd. Greenville, NC 27858 Re: Legacy Park Project (Ryden, NC) Dear Mr. Withers: I am In receipt of your request for the Contentnea Metropolitan Sewerage District (CMSD) to accept the additional flow of 34,560 gpd of wastewater that will be generated by this project. It is understood that this project will consist of 144 2-bedroom apartment units with a daily design flow of 240 gal/unit/day. This wastewater will enter the CMSD collection system through Ayden's #10 pump station which discharges directly into the CMSD gravity outfall line which flows to the CMSD's Hwy 11 pump station. By virtue of this letter, the CMSD will accept this additional flow. Please find the attached FTSE form and supporting documentation. Please advise If you have questions or comments. Sincer*, Charles M. Smithwick, Jr. District Manager, CMSD ¢a2z° 4 u_�a a¢'� U O. ONcc�� h n(D 00 0) NabO AlpO r O O O O O yy O 0 N R (0,) �• 0 0 0 0 O 0 0 0 0 0 0 0 p Q }NNN N N N N N N N N N N Y N w a O •� k ° ~ 0 0 0 0 0 0 0000000000 O N •'0 N 00 N 000 0000 co N 0000 (D 00 00 w X Z (o0O h 0000 (o d'0)LO(O (D MN (D' n Q1 ?j Ld N N M M M r h h M N O N N O ° M X 0) 0) r 0) rr Lu W W W W W 0.LU (1) xx (nmx(nxxx ww D)O N 00 N 000 00 Cl) r NNN Cl) 00 L C(0 hN OM 00 V CO Cl) d' « G r 0 E t J 0) 7 No c 0 (0 N M �p O_ O• Q O C 2 0 3 0 e us U °(� 00O N N O 0 0 0 NU 0) 3 0 N � � O O N A 'a7 2 h CL r ry N N $ 3 N T o(Dhtn00O 0)MNNNN Moo Q !6(D 0) co NM 0)(O MMM M r �� a a rn Y3 « c O W Y 9 a 'N > v 4k E 12 L°r LN = C Y (OD (OON w to a h Lo (p O t� c tf N OQ(n� € E 7d� N NOV C 0) OWN m° ;Sm(o�3�v_ U3c"� Uco u c v dZ c rnrn ° °) c - 3 to 0 F• y Q: � Mn « 3 m °3 c c d° E o 0 0 c « � c 3 o r 3LL Q v>(0(nmaF i U¢aU�3 y�aL+�aoiaoimUm� ca°i �roo� G LL1? C��� 0 a O 00 IT OD yy gg N (0 10 N O U C 0 0 0 0 r O r ... Olp N € 4) > r ��OQ ' CD CO W W r r r r - 0000040 d IY N N N N N V o_ m O 7 OD O a � F"0000000 000 0000 c (fl G 00 (O N (0 00 O r O) O (o (0 0 0) I, O (0 O N (o h LO Cl) M O Z r O M r N N r N, V r N C O (O E LL a co '0 0] ca � � m c0 ca (n V V) (n L V c� = •pT '(' 62 >, T T T 2 V p:, OOl 3 0) N N 7 7 U) N N 7 O) 7 O C 0.WWO2wwV0 �Q2 0M(0O NYM0 MM� �ON,) ❑. m C ,C N O E .a v C Cl) o r a c 0 0 NV 00000 CO(0 M N O O 0000 N O ; (or(o CO co CM N J (�6 J 3 C a y 0 0 0 Z m a C V ffi d M Y N d) L, S RM co 00 rl co 0. co co cq 04 fONM Mr NOIlN (o It Uom .V � C a 0 C U C F- Z (o m ca F N O o r a a p "a cCO c yv a 0) Z d awe 1= 0 o c S a v •o IDrod 0 3 c O N N Zo Z 0) EU)m o'O �UaN a lL o2n o ro m o. o 0 r� 0) e-1 00 N n (D n m co co 00 00 r4 rl l4 CA -Zt N op M W N m a l00 em i Ch V m rl H a4 s4 ei N N t4 N N W O) 9 � a „ ko d N r, n O O In cn n a N ai e 4 a W m O 1 m a m I-q 0) 00 c e `n � ^ f0 a v m � 14 m n m Ln n ., to � F I- v dt Il V' t0 (n . n N m 00 et n w 00 0) N e-1 00 d' l0 Ln O U) �n N 00 O 01 r4 Ol Ol O e l 00 Vn m '-I 14 4 6 O O rl r4 r4 c4 r4 ~ O1 Q � 11 It m rn t m N � o o m n 00 N d' In a O 00 l0 Ln ` m O 1l 00 01 tV l0 m (G O w Ln M m m m N N m m Ln d w 2 H 0 o� >. � Q a a a v1 O Z a G mLL Q Q m c v Q c {- o O O N N State of North Carolina Department of Environmental Quality Division of Water Resources -P" I : 1". Division of Water ltdsources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Ayden Project Name for which flow is being requested: Legacy Park Apartments More than one FTSE nray be required for a single project if the on ner of the WWTP is not responsible for all pump stations along the route of the proposed rvastervateriforv. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit Contentnea c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP c. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used rage District ZIL All flows are itt MGD 3.5 .49 1.838 .0346 2.363 67.51 % I/< II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. (A) (B) Design Average Approx. Daily Current Firm Flow** Avg. Daily Capacity, * (Firm /pt), Flow, MGD MGD MGD Hwy 11 WQCS00080 7.5 3 1.27 (C) (D)=(B+C) (E)=(A-D) Obligated, Total Not Yet Cun•ent Flow Tributary Plus Daily Flow, Obligated Available MGD Flow Capacity*** .49 1.76 1.24 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for• each pump station located between the project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NC0032077 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Charles M. Smithwick, Jr certify to the best of my knowledge that the addition of the volume of wastewater to be pennitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Page 2 of 6 FTSE 10-18 CJoam4m7m o,&ezopoh?az c feweWe �i tract CMSD POST OFFICE BOX 477 GRIFTON, NORTH CAROLINA 28530 CHARLES M. SMITHWICK, JR. DISTRICT MANAGER July 1, 2020 Mr. Dan Withers, PE ARK Consulting Group, PLLC 2755-B Charles Blvd. Greenville, NC 27858 Re: Legacy Park Project (Ayden, NC) Dear Mr, Withers: I am in receipt of your request for the Contentnea Metropolitan Sewerage District (CMSD) to accept the additional flow of 34,560 gpd of wastewater that will be generated by this project, it is understood that this project will consist of 144 2-bedroom apartment units with a daily design flow of 240 gal/unit/day. This wastewater will enter the CMSD collection system through Ayden's #10 pump station which discharges directly into the CMSD gravity outfall line which flows to the CMSD's Hwy 11 pump station. By virtue of this letter, the CMSD will accept this additional flow. Please find the attached FTSE form and supporting documentation. Please advise if you have questions or comments, Sincerely, Charles M. Smithwlck, Jr. District Manager, CMSD N T Qdmz � 2 ut�N cg1 OOO, O r�co 0000 O,N 07 f.1 Y O CD O p Q} N N N N O N O O O O N N N N 00 O N N N O c 0 a Y3 J 7 a ~ 0 0 0 0 0 0 DONW N wC) 0 fD 00 f-0000 ,-tn0 OD O 3 N N , M , O LL d 1 0) WrsW xx 0)0 N 00 N 000 C; OD I-N O Cl) .E 'm E d O O O O O O O O O O M W O N W W CO W 00 w d:mO(OOMN8 V M , I co N d d d.. d d W W W' W W 00 CO N N N M 00 00 •1 , M CO M V , C O w C VC) d' O) Cl) O O - O 0 0 0 N N N 3 0 O Fr 0. m m M N M m O M MMM O N N eF�a> > C N N-cn �fn m C C C � C a 'C 'd � a a d 5 c v,cnu,mo_r- Flff�l , V a U) 0 :j O O n 7 N LOOM 00 N N OV d G tQ o.0 .Z �+ 0 a7 a) a1 t -M O cwujo29? n C aI ocn > j. rn la 1 O ��OQ r;I U yygO N(O V1 V 00N € N & > r 0000 o001 r r r r U ^.� 0 0 0 0 r O r N U �. 0000000 a7 N 0 O. d'N O O O O NNNN O Qi'N NN NN NN a m 00 0 7 � O 'C v F-0000000 000 0000 o r �0� Arno 0) 000 1 44Lf) ° h 0 Z r 0 M r N < h N N U ?� r N C O a1 E LL m m m in m y vvv EjR c a)a>a) mRM a% L L (a n. wo U��fYUU ��� U�UU a O1M W O NYM O MM� (NOS U) 01 G_ C N O Y3 cosv .Q C Cl) o r 0 O O u0w woomm 0(00 0000 N (Vo 3O r (o Orr.N M m N J J 7 C � - V O o d o Q o o — A, O C 00 M O N 1� S L V aD W i�fOM 6. a0 r 0 (O N N (ONM M r NO1�N � C to X{ � C J Z U p � 1°' 3 N LLa Cd)�v c a Q) Z o c c a j ) O C O (L •y{ d �U ?+ mZ Z N OO'g mi d Z �Y E- d v? U da V' ++ O a+ 9 .. p (a p p a a O K �jLL O m o NU a0 N0m m 0 5 0 =o U m W O F- Z 0 r� O1 r-1 00 N f, to Il m m ro 00 00 N rl 0 cn w4 N Oaj f M W N m � emi cn "'� H r4 rl r1 N N rl 'v N 00 14 „ a � N n r�O O to 00) N d' N 001 rml a to m o ci CO m ri rn o0 0 00 e my `n -t Ln n n rl n a m � t1oo U) y t0 C@ L F I'\ 0 N O (44 n a a n It W m n Ln m 00 v N 0) 00 0) N ci 00 d' t0 N O to i!) � N G ba o 0i 'j ri o 0 o ri V-1 ri H ri 3 Q N m m N I, t0 ui ci 0 0 N+1 N n ON m V O ttoo 01 d' 000 .0 L 0000 to o Ln tD CD M O r� 00 cn (V 0 M to O 00 w M m m m N N m m Ln d 0 N = _A 7 N 3 0 a, 0 m a v v (V > N E a E E m C ° a m > 3 CL tai e $ m c +t° o z° o a 3 a to ti o cn N N 2 U PARTMENT OF THE USGS U.S. DEU S. GEOLOGICAL SURV YERIOR {Jwcr M�r6egf�wvY CJ Q O Q � � 3 r�� 4 a Site 0 h In AYDEN QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES J-( S7 - - a• 1 2.. ` NJ I 21 At-LEN D f`� MN, 0 5o0 1000 2000 Mite ,•ze Feet _ -za Mas 1:12000.000 AYDEN, NC 2019 UTM ORIDAND H 19 MADNAIC NORTH DECLINAI ION AT CENT LR OF SHEET CONTOUR INTERVAL 5 FEET NOUN MAER CAN VERTICAL DATLLtl OF 19M Project Mgr.: JDW Project NO.: 17041 NC License: P-1 199 SITE LOCATION PLAN EXHIBIT Drawn By: KLG Scala: ASSHCINN ADCONSULTING CONSULTING LEGACY PARK APARTMENTS cnecl,aaBy:�pW Date: 2p�40P0 Engineers & Planners EROSION CONTROL PLAN A� 1 2755-B Charles Blvd. I Greenville, NC 27858 AYDEN, PITT COUNTY, NC U.S. DEPARTMENT INTERIOR m GUGEOLOGICAL SURVEY edYeee AYDEN QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES GUM13E Rp, r O J w 3 11. J ° �Q,QL H �_ Site ;.` t RLj NTERS ST 1 SNpowHf4LST`' ._ I ; jl� ALLEN MN, 0 ,.N 1000 2000 177 MI�LS +'? Feet ',MILS AYDEN, NC 1:12000.000 2019 UTM GRIOANO Ate MAGNETIC NOMH CONTWR INTERVALS FEET OECLINAIIONAT CENTEq OTSHEET HORIN NVEACAN VERTIGL oAT OF IM Project Mgr.: JDW Project NG.: 17041 //q�� � NC U... P-ttos SITE LOCATION PLAN fflDrewn By: KLG Scale: ASSFICVIVN �/. D CONSULTING Checked By. jpW Date 2nizozo 7F�"��CC ��' `GROUPPuc LEGACY PARK APARTMENTS Engineers & Planners EROSION CONTROL PLAN 2755-B Charles Blvd.I Greenville, NC 27858 AYDEN, PITT COUNTY, NC 0 JLI _4, Average Yearly Flow for: Jan.2019 Feb.2019 Mar.2019 Apr.2019 May2019 Jun2019 Ju12019 Aug2019 Sept2019 Oct2019 Nov2019 Dec2019 CMSD, NCO032077 Permitted Flow: 2.3576129 2.4056429 2.256871 2.1541333 1.4740645 1.6486667 1.5700645 1.3992258 1.8006667 1.2582903 1.3717 1.4966452 1.766131983 Avg. Flow 2019 % of Permitted Flow: 3.5 0.504609138 (< 80% / 90% OK)