HomeMy WebLinkAbout20200516 Ver 1_USACE Permit_20200713U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action ID. SAW-2019-02099
County: Buncombe
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Town of Woodfin / Attn: Mr. Jerry Vehaun
Address: 90 Elk Mountain Road
Woodfin, NC 28804
Telephone Number:
Location description: The site is located 1050 Riverside Drive, in Woodfin, NC. Coordinates are 35.626204-82.583603
Description of projects area and activity: This permit authorizes placement of fill for a boat ramp and bank
stabilization activities on the French Broad River and fill in wetlands associated with the development of recreational
facility known as Silver Line Park. Impacts authorized by this permit are summarized below. Attached are
recommendations from the North Carolina Wildlife Resource Commission for your consideration.
Resource Impact Type
Permanent Impacts
Temporary Impacts
Permit Authorization
Stream
Boulder Toe/Stabilization
188 linear feet 0.02 ac
247 linear feet 0.17 ac
NWP 13 / Section 10
Boat ramp
53 linear feet 0.006
NWP 26 / Section 10
Total Stream Impact
241 linear feet / 0.026 acre
247 linear feet / 0.17 ac
Wetlands
Recreational Facility
0.17 acres
0
NWP 42 / Section 404
Total Wetland Impact
0.17 acre
0
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: 13, 26 and 42
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the
attached conditions, above noted special conditions, and your submitted application and attached information dated.
Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop
work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization
is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies
with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is
suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide/regional permit, activities which have commenced (i.e., are under construction) or are under contract to commence
in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months
of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been
exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification.
You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act
(CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required
Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Amanda Jones at 828-271-7980, ext. 4225 or amanda.jones@usace.army.mil.
Corps Regulatory Official:
FUEMMELER.AM Digitally signed by
FUEMMELER.AMANDA.JON E
AN DA.JON E5.124 S.1242835090
2835090
Date: 2020.07.13 12:13:19
-04'00'
Amanda Jones
Expiration Date of Verification: March 18, 2022
CF: Equinox, Attn: Owen Carson (via email)
Date: July 10, 2020
Action ID Number: SAW-2019-02099 County: Buncombe
Permittee: Town of Woodfin / Attn: Mr. Jerry Vehaun
Project Name: Silver Line Park / NWP 13, 26, and 42
Date Verification Issued: July 10, 2020
Project Manager: Amanda Jones
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn.: Amanda Jones
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date