Loading...
HomeMy WebLinkAboutNCC191852_Emails RE NOT Request Not Approved and Final Inspection_20200710Georgoulias, Bethany From: Georgoulias, Bethany Sent: Friday, July 10, 2020 7:39 AM To: skraus@oreillyauto.com Cc: McCoy, Suzanne; sgreene@vericonbuilds.com; mbyers@vericonbuilds.com Subject: RE: NOT Request Not Approved Attachments: UNION -2019-066_Oreilly's CO_6.18.2020.pdf Mr. Kraus, Please see the attached copy of the final inspection report. Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.aeorgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater c�-_�'D,EQI� ,6�dd__NI_6e� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: laserfiche@ncdenr.gov [mailto:laserfiche@ncdenr.gov] Sent: Friday, July 10, 2020 7:37 AM To: skraus@oreillyauto.com Cc: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; McCoy, Suzanne <suzanne.mccoy@ncdenr.gov>; sgreene@vericonbuilds.com; mbyers@vericonbuilds.com Subject: NOT Request Not Approved This email is to notify you that your request to rescind COC No. NCC191852 for the project O'Reilly Auto Parts - Wingate, NC was not approved for the following reason: 41 - Termination request must be submitted by Vericon Construction, the permittee listed. 42 - Document uploaded was a routine inspection from 3/12. Final close-out inspection by MRO was 6/23/2020, which is the date that should be entered. I will forward a copy of that report. Please have PERMITTEE resubmit a new NOT request (and signed Certification form) with the revised date and other inspection report. Contact bethany.geor oulias o,ncdenr.gov with questions. If you have any questions, please contact The NC DEMLR Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Union Project: O'Reilly auto Parts -Wingate (WGT) River basin: Yadkin-PeeDee Person financially responsible: O'Reilly Automotive Stores, Inc. - Scott Kraus, SVP Project #: UNION-2019-066 Real Estate & Expansion Address: 233 South Patterson Avenue, Springfield, MO 65802 1. Project Location: US Highway 74, Wingate Pictures: No 2. Weather and soil conditions: Sunny, no activity 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 23, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination if the plan was approved after April 1, 2019. If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704)235-2137. Reported by: Lily Kay Others present: Date of inspection: June 18, 2020 Time arriving on site: 3:15 PM Time leaving site: 3:25 PM cc: