Loading...
HomeMy WebLinkAbout19951305 Ver 1_Complete File_19951219State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director g513QS _X VVIVA, A"a ID E=_ F1 19 December 1995 ft?C?rEt? MEMORANDUM DEC ' 195 TO: Mr. A. Preston Howard, P.E., Director Division of Environmental Management FROM: John R. Parker, Jr. Major Permits Processing Coordinator SUBJECT: CAMA/Dredge and Fill Permit Application Review Applicant: N.C. Department of Transportation RECENEp (?511'4GgTON OFF1C_ ?z DEC 2. ? W A' '` ,. Project Location: On SR 1160 at Bridge No. 29, Hertford County, North Carolina Proposed Project: To replace the existing' 17 wide by 156' long bridge with%a 27' ide by 175' long bridge. ?e Please indicate below your position or viewpoint on the proposed project and return this form by 9 January 1996. If you have any questions regarding the proposed project, please contact David Moye at 946-6481, Ext 298. When appropriate, in-depth comments with supporting data is requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. // Signed Date lP l 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper '10 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: N. C. Department of Transportation 2. LOCATION OF PROJECT SITE: Hertford County on SR 1160 at Bridge #29 over Potecasi Creek near Murfreesboro, North Carolina Photo Index - 1989: N/A 1984: N/A State Plane Coordinates - X: 2,562,600 Y: 958,200 Union Quad. (upper left corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/11/95 4/3/95 Was Applicant Present - NO NO 5. PROCESSING PROCEDURE: Application Received - 12/15/95 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hertford County Land Classification From LUP - Conservation (water, wetlands) Rural (land) (B) AEC(s) Involved: PTA (C) Water Dependent: YES (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing - Bridge Planned - Bridge (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other ±800 ft2 Highground [AREA] (D) Total Area Disturbed: 0.02 acres (E) Primary Nursery Area: NO (F) Water Classification: C-NSW Open: NO 8. PROJECT SUMMARY: The applicant proposes to replace an existing ± 17' wide by ± 156' long bridge with a ±27' wide by ± 175' long bridge. NC DOT Bridge #29 Hertford County Project setting The N. C. Department of Transportation (NC DOT) proposes to replace bridge #29 located on SR 1160 crossing Potecasi Creek south of Murfreesboro in Hertford County, North Carolina. The existing bridge is ± 17' wide and ± 156' long and is a one lane bridge. The bridge is bordered on the downstream (south) side by an approximately 50' wide cut over woodland area for aerial transmission line right-of-way. This cut over area is vegetated with various wetland plant species which give way to upland grasses on the road shoulder. Adjacent the cut over area on the downstream side are wooded wetlands on both sides of the creek. The upstream (north) side of the site is bordered by wooded wetland on both sides of the creek. The creek is _+ 126' wide at the bridge crossing and the vertical clearance under the existing bridge is +5'. Potecasi Creek which is classified as C-NSW by the Environmental Management Commission. Project description NC DOT proposes to replace an existing ± 17' wide by ± 156' long bridge with an approximately 27' wide by ± 175' long bridge. The existing bridge which has 7 bents will be removed and replaced with a new bridge which has 3 bents. Approximately 800 ft2 of high ground (existing approach fill) will be removed which will increase the horizontal opening under the bridge from ± 156' to ± 175'. The existing vertical clearance of ±5' will remain the same. Anticipated impacts The project as proposed would result in the excavation of ±800 ft2 of high ground. The existing bridge has a navigable opening between existing bents of ±20' wide with a vertical clearance of ±5'. The proposed bridge will have a opening of ±50' wide with a vertical clearance of ±5' which will enhance navigability while maintaining the existing vertical clearance. The existing bridge width of ± 17' will be increased with the new bridge to ±28' . Localized turbidity would occur as a result of the construction activities. David W. Moye - Washington Office - 18 December 1995 „`STATED STATE OF NORTH CAROLINA DEPARTMENT OF TkkNSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 December 7, 1995 Mr. David W. Moye, Field Representative N.C. Department of Environment; Health. and Natural Resources Division of Coastal Management Washington Field Office P.O. Box 2188 Washington, N.C. 27889-2188 Dear Mr. Moye GARLAND B. GARRETT JR. SECRETARY Re., Proposed Replacement of Bridge No. 29 on SR 1160 in Hertford County On/about September 29, 1995 the North Carolina Department of Transportation (NCDOT) submitted a CAMA Major Development Permit application for the proposed replacement of bridge # 29 in Hertford County. A permit was required, because Potecasi Creek; at the site of bridge # 29, was determined to be a Public Trust Water Area of Environmental Concern per Administrative Code Subchapter 7H.0207. On October 13, 1995 the Division of Coastal Management (DCM) returned the application due to discrepancies in the information provided. Corrections have been made to the application as recommended in DCM's October 13th letter. The revised MP-1 and MP-5, applications and accompanying drawings are attached. Riparian landowner notification verifications are also provided. It is requested that this revised application be processed as soon as possible to enable the Bridge Maintenance program to upgrade the existing, functionally obsolete structure in the near future. If you have any questions or comments please call Mr. M. Randall Turner at (919) 331-4737 (office), or at (919) 333-2048 (cell phone), Sincerely H. ranklin Vick, P.E., Manager Planning & Environmental Branch HFV/mrt R 1% Page 2 December 7, 1995 M r. Moye Enclosures cc: John Parker, Permit Coordinator, DCM Jimmy Lee, P.E., Bridge Maintenance Unit D.R. Conner, P.E., Division Engineer M. Randall Turner, Division Environmental Officer Form DCM-?vJ P-1 APPLICATION (To be completed by all applicants) 1. APPLICANT b. City, town, community or landmark Approx. 4 miles south of Murfreesboro a. Landowner: Name N. C. Department of Transportation C. Street address or secondary road number SR 1160 Address P.O. Box 25201 City Raleis4h State N.C Zip 27611-5201 Day Phone (919 733-3141 Fax (919) 733-9794 b. Authorized Agent: Name H. Franklin Vick. P.E.. lign. ME Branch Address P.O. Box 25201 City Raleia State N.C. d. Is proposed work within city limits or planning jurisdiction? yes X No e. Name of body of water nearest project (e.g. river, creek sound, bay) Potecasi Creek 3. DESCRIPTION A`TD PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing timber bridge with new concrete bridge Zip 27611-5201 Day Phone (919) 733-3141 Fax (919) 733-9794 b. Is the proposed activity maintenance of an existing project, new work or both? both c. Project name (if any) Replacement of Bridge 4 29 :VOTE: Permit will be issued in name of landowner!s), and/orprgject name. 2. LOCATION OF PROPOSED PROJECT c. Will the project be for public, private or commercial use? Public Transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Public Transportation: High-yvay crossing of Potecasi Creek; Standard Construction 1/Iethodolomes a. County Hertford Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Approximate elevation of tract above MI-1W or NWL +/- El 20 ft (USGS)-/- 100 ft assumed datum d. Soil type(s) and texture(s) of tract Mapped as Bibb Soils. mucky inclusions e. Vegetation on tract Ma lp e, aum, ash, cress swamp forest f. Man-made features now on tract Timber bridge g. What is the CA1vL4 - Land Use Plan land classification of the site? (Consult the local land use plan.) X Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? Rural-agricultural Is the proposed project consistent with the applicable zoning? X Yes Na ("Attach zoning compliance certificate, if applicable) Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes _ No Coastal (marsh) Other X If yes, has a delineation been conducted? * No (Attach documentation, if available) *See attached memo to COE m. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface runoff from bridge and am)roachwavs o. Describe existing drinking water supply source. 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title; plus writt en permission from the owner to carry out the project. ® An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710'203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guideagency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. SA Stormwater Certification, if one is necessary. SA list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Smithfield Carroll's Farm Address P. O. Box 1240 Phone Waverly, Virginia ?3890 Name R. Jennings & Annie P. White. Jr. Address P.O. Box 147 Phone Con-vav N. C. 27820 Name W.L. Simons & Agnes R. Simons Heirs Address 412 N. Colony Ave Phone Ahoskie, N.C. 27910 A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. N • A check for 5250 made payable to the Department of Environment, Health, and Natural Resources c DEI'R) to cover the costs of processing the application. ® A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certifv that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certifv that the infonmation provided in this application is truthful to the best of my knowledge. This is the ( 4 day of Jac , 19 1;5 . Print Name H. Franklin Vick P.E. Signature Landowner orAuthorizd Agent Please indicate attachments pertaining to your proposed proj ect. DCM MP-2 Excavation and Fill Information DCM VIP-3 Upland Development DCM MP-4 Structures Information Y DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development A"OTE. Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAM.A Major Permit, Form DCM ;MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) Concrete-Prestressed cored slab c. Water body to be crossed by bridge Potecasi Creek d. Water depth at the proposed crossing at T%4LW or N-IN-L +/- 11 ft. e. Will proposed bridge replace an existing bridge? X Yes No If Yes, (1) Length of existing bridge 156 ft. (2) Width of existing bridge 17.1 ft CR* (3) Navigation clearance underneath existing bridge +/- 5.0 ft (4) Will all, or a part of, the existing bridge be removed? (Explain) Entire existing bridge will be removed * CR denotes clear roadway f Will proposed bridge replace an existing culvert(s)? Yes X No If Yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the M1-1W or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge 175 ft h. Width of proposed bridge 24 ft CW: +/- 27 ft R-R* Height of proposed bridge above wetlands +/- 4.6 ft * R-R denotes rail-to-rail Will the proposed bridge affect existing water flow? Yes X No if yes, explain k. Navigation clearance underneath proposed bridge +/- 5.0 ft Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? X Yes No If ves, explain Existing bridge has 2 spans P 17 ft 6 in and 6 spans a. 20 ft-, proposed bridge has 3 spans @ 50 ft and 1 (tai 25 ft therefore navigational width is increased. Vertical clearance remains unchanged m. Will the proposed bridge cross wetlands containing no navigable Nvaters? Yes X No If ves, explain n. Have you contacted the U. S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Form-MM-W-5 2. CULVERTS a. Water body in which culvert is to be placed N/A b. Number of culverts proposed NIA c. Type of culvert (construction material, style) NIA d. Will proposed culvert replace an existing bridge? Yes No N/A If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain), e. Will proposed culvert replace an existing culvert? Yes No N/A If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the NMW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f Length of proposed culvert N/A g. Width of proposed culvert N/A h. Height of the top of the proposed culvert above the ',Iv1HLV or NWL N/A i. Will the proposed culvert affect existing water flow? Yes No N/A If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No N/A If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the M-1W or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated _ (4) Amount of material to be excavated in cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands SAVs - Other Wetlands If yes, (1) Length of area to be excavated _ (2) Width of area to be excavated (3) mount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highg-ound excavation? X Yes 1To If yes, (1) Length of area to be excavated +/-M ft (2) Width of area to be excavated +/- 40 ft (3) Amount of material to be excavated in cubic yards +/- 200 cu vds d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area _Upland site to be determined (2) Dimensions of spoil disposal area see d. (1) (3) Do you claim title to the disposal area? Yes No seed. 1 If no, attach a letter granting permission from the owner. Form DCM-MP-S (4) Will the disposal area be available for future maintenance? Yes No see d. 1 (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) -above. see d. W (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. see d. (1) e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? Yes X N If yes, (1) (2) (3) f. Length of area to be filled Width of area to be filled Purpose of fill . Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled .(3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes NO If yes, (1) Length of area to be filled +I- 40 ft (2) Width of area to be filled +/- 40 ft (3) Purpose of fill Top dress shoulders near end bents 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? . Yes X No If yes, explain in detail None anticipated c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail None anticipated d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-T%4P-2 e. How will excavated or fill material be kept on site and erosion controlled? Stringent application of NCDOT's Blv'TPs for the Protection of Surface Waters f. What type of construction equipment will be used (for example, dragline, baekhoe or hydraulic dredge)'' Backhoe, crane, trucks. etc g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes No If yes, explain in detail Stone rip-rap will be used on all slopes greater than 2.1 NCDOT H. Frankli P. App or oject N is atture Date Hertford County }t Muwlo n. h r IELD 0P. 4< North Carolina Department of Transportation Division of Highways County: Hertford Quad: Union Basin: Chowan Project: Replace Bridge # 29 on SR 1160 Over Potecasi Creek Date: 09 / 21 / 95 Vicinity Map Sheet ] of 5 v Q.. J J? YI -- U f1 Vt ? a ? ` %A - w Y, I Y ly c j l.J VI ,?1 y ? I ?V ? ?1 aZ yyd 0 )ZI C •a- <i d V I N W ..! ?l A t o Op ; ? I? r, t) 1 Q c wQ? II qa I? - W ? 1i•j ?' I ? I CY t,r ? ? II. ? t h 1 ? I ??? ? L 4t ? ll?l F„ <- r G0 'I 41 W 111 ?' ?? f 1 CE .1 J Q CL =t1? I NY' ?? Q 0 r?vU Z J U I?;Nz 3 % II I? ?I I( I ?. c ?h zw tiH' \h r? t- 41• S 3 2 N 2 J 4 ? W. w Qw n? N 1-1 oc y Q w U N t? • • North Carolina Department of Transportation Division of MF.hways County: Hertford Quad: Union Basin: Chowan Project. Replace Bridge # 29 on SR 1160 Over-Potecasi Creek Date: 09 / 21 / 95 Plan View Sheet 2of 5 os•?6 w I I I .. -.zF3 l I a I U0 p I I I QNj o• i I tj ,? ?` I I aI I = c0 oL o . F 3 v I '?' l f Ill I w .a I.Lj ?- W Ll 0 UL 1 a A a- W Q4J I I w 0 I K J O D? h ;3 0 ? Y ' ?w Z 3 O td fro S ' • O North Carolina Department OfTranvortation Division of Highways County: Hertford Quad: Union Basin: Chowan ProJect: Replace Bridge # 29 on SR 1160 Over Potecasi Creek Date: 09 / 21 / 95 Plan View Sheet 3 of 5 ?zz II Q ? z '' I 1 W ? t 103+b l •. 1 / ?? Il -1111 -Z J rI _ -Z 0 t? ID ll? Cl` tt t 1 v' 1 1 ? w Q J 4 D v II • 11 I? Y V 4 O 0 Z Lt 0 W Q I.L?Vim T °j Ad t? Y it J;ry .?` W %4 . C1-1 Q? ? Jt v wk-9 w? 4 O l?l of ?n :o Q _ `9 U o as v' r O i I? 1 - oC t^ I I ?Z? I "`` 1 1 ( Q s I I ' 1z N 0 fl r J T O ? J ewl V1V (D CJ N %A k1l it 4) Q Id 4 Z ? cz? Q 11.1 t 1 11 t1 q •• 1-- } o N U Cr O? ° W 1 U e r , Noah Carolina Department of Transportation Division offiighways County: Hertford Quad: Union Basin: Chowan Project: Replace Bridge # 29 on SR 1160 Over Potecasi Creek Date: 09 121 / 95 Profile Sheet Sheet 4 of 5 4 Q C4 b J1q O t N Q _ ''`'t 4 9C J •.J ?1 2 w O M Q Q . ? • N o O C1 Z- 42 il ';t W w 11t .J kA O C/? a Cj O U9 ? O p_ M North Carolina Department of Transportation Division of Highways i County: Hertford I Quad: Union Basin: Chowan Project. Replace Bridge # 29 on SR 1160 Over Potecasi Creek 1 Date: 09 / 21 / 95 I Cross-Sections ? O Sheet 5 of 5 - r? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARmTT JR. GOVERNOR P.O. BOX 1405 SECRETARY Elizabeth City, N.C. 27906-1405 Phone: (919) 331-4737 Fax: (919) 331-4739 December 7, 1995 Mr. Raleigh W. Bland, Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office . P.O. Box 1000 Washington, N.C. 27889-1000 Dear Mr.. Bland: Re: Proposed Replacement of Bridge No. 29 on SR 1160 in Hertford County I have enclosed a vicinity map and a site drawing for a proposed bridge replacement in Hertford County. A CAMA Major Development Permit application has been submitted (effective December 7, 1995) by the NCDOT. As designed, the project will impact less than 0.1 acre of Section 404 wetlands. The wetland impacts are in the vicinity of the proposed rip-rapped zones adjacent to the proposed end-bents. I have visited the site on more than one occasion and have made a wetland determination. The approximate upland-wetland boundary is depicted on sheets 1 and 2. The predominant community in the bridge study area is a swamp forest and fringe wetlands associated-with Potecasi Creek. Soils are mapped as Bibb and evidence of saturation within the upper 12 inches for extended periods is apparent. The Division of Coastal Management wants to insure that the wetland boundaries in the project area have been properly determined, as evidenced by a COE tear sheet, concurring with the field determination. Please provide me with a tear sheet confirming that sheets 1 and 2 properly depict the wetland boundaries in the bridge vicinity. Call me if you have any questions or comments. . Sincerely, M. Randall Turner, Division Environmental Officer Division One Attachments cc: David W. Moye, DCM lax 1zilrsia5 13: 23 aUla 331 9739 NCDOT EC DIST 1 1& 002 U.S. ARMY CORPS OF ENGINEERS Wilmington District Action ID: County: -L 4n 1?: ?1 Notification of Jurisdictional Determination PiLoprrnmerlAuthorized Agent 1 . Address K U . V-4 Indicate Which of the following apply: • There a wetlands on,* above describe roperty which we str ly suggest should delineated d yag s yed. The sup ed wetland lin ust be verified by o staff before the s will mak final Arisdictional d rmination on yo property. Beca of the size our property an ur present worklo , our identification an elineation of you w ds cannot a accomplished i timely manner. Y may wish to employ onsultant to obt ' a ore timely ineation of the ands. Once your sultant has flagged a we d line on the pr erty, Corps st will review it, an , rf it is accurate, we ongly recommend that have the line su eyed for .fins proval by the Co . The Corps wi7I no ake a final jurisdictional etermination on ur property vKhout an approve urvey. • The wetlands on your lot have been delineated, and the limits of Corps jurisdiction have been explained to vou. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed thfew& years from the date of this notification. • Ther are no wetla presenii-emmnnation oV th above describe propeny which a subject tot permit r -qGi ements of S ion 404 of taWater Act SC 1344). Unl there is a cha a in the law or our public regulations, th' m e relied upon for a eriod not toe d three years from the a of this notifica ' n. f' j• The project is located in one of the 20 Coastal Counties. You should contact the nearest State Office of Coastal Management to determine their requirements. Placement of dredged or fill material in wetlands on this property without a Department of the Army permit is in most cases a violation of Section 301 of the Clean Water Act.(33 USC 1311). A permit is not required for work on the property restricted entirely to existing high ground. If you have any quesu- re ardin the orps of Engineers regulatory program, please contact Rck Q lit at 1 qi 1 ?v 1 ?.3 Property-swasdAuthorized Project Manager Signature. Date t 2?" 15j - 15 SURVEY PLAT OR FIELD SKETCH OF DESCRIBED PROPERTY AND THE WETLAND DELINEATION FORM MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM. CEMW Facm566 1 =91 Telephone Numbers 3'3 t -- WT '1 Expiration Date [I- J5- U00 1Z/15/y5 13:24 W919 331 4739 NCDOT EC DIST 1 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID . . County Qr {GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner/Agent _) t Address p. o . d - t ?. ? flub Telephone No. 4 J ?? 1G?,"' ?j g y D Size and Location of project (waterbodv, road name/numb . / 1 , town, etc.) Description of Activity n- ,.r --- - .J ._-Section 404 (Clean Water Act, 33 USC 1344) only. .l Section 10 (River and Harbor Act of 1899) only. Section 404 and Section 10. R -3 Regional General Permit or Nationwide Permit Number. Any violation of the conditions of the Regional General or Nationwide Permit referenced above may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This Department of the Army Regional GeneraI/Nationwide Permit verification does not relieve the undersigned pennittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. By signature below, the permittee certifies an understanding and acceptance of all terms and conditions of this permit. Property Owner/Authorized Agent Signature Regulatory Project Manager Signature Ti Date 6 `" r? - 9 S _ Expiration -X-4 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. ra 003 cESAw Foam 69t Dec 1993 1Z/ 18/!!5 13: L5 aVlY 331 TIJU iNUDUT 1:G ll15T 1 _5_ L0 004 NATIONWIDE PERMIT # 3: }S2lN=27AWcv_. AUTHORIZES REPAIR, REHABILITATION, OR REPLACEMENT OF ANY PREVIOUSLY'AUTBORT_ZED CURRENTLY SERVICEABLE STROCTIIR.E OR FILL OR OF ANY CURRENTLY SERVICEABLE STRUCUuRE OR FILL AUTHORIZED EY 33 CFR 330.3. DOES NOT AUTHORIZE. ZL?INTENANCE DREDGING ANY) BEACH RESTORATION. SECTIONS 10 AND 404. STATUS IN NORTE CAROLINA. ISSUED. NATIONWIDE CONDITIONS.- STANDARD GnEX2RAL CONDITIONS AND THE FOLLOWING SPECIFIC CONDITIONS: 1. THE-STRUCTURE OR FILL IS NOT TO BE PUT TO USES DIFFiRING FROM THOSE USES SPECIFIED OR CONTEMPLATED FOR IT IN THE ORIGIT7AL PERMIT OR THE MOST RECENTLY AUTHORIZED MODIFICATION. 2. MINOR DEVIATIONS DUE TO CHANGZS IN YATERIALS, CONSTRUCTION TEc,,LTIQUES OR CURRENT CONSTRUCTION CODES OR SAFETY STANDARDS WHICH ARE NECESSARY TO 2%=t REPAIR, REHABILITATION OR REPI:ACEM?,NT TO CURRENT SAFETY STANDARDS AL.y PERMITTED. 3. i'NCLUDES THOSE STRUCTURES AND FILLS DESTROYED WITHIN THE PAST TWO Y` _PARS BY STORMS, FLOODS, FIRE OR OTMIR DISCRETE EVENTS, BUT WHICH WTERE SERVICEABLE IMMEDIATELY PRECEDING T'rAT EVENT. REGIONAL CONDITIONS: NONE. 4401 CERTIFICATION DETE=NATION: GENERAL. CERTIFICATION ISSUED, BUT CONDITIONED AS FOLLOWS: 1. ESTABLISHED SF,DIb+..° NT AND EROSION CONTROL PRACTICES PRE UTILIZED TO PRE4 TT VIOLATIONS OF THE APPROPRIATE TURBIDITY WATER QUALI.TT STANDARD (50 NTUS IN STRF.A1u5 AND RIVERS NOT DESTGNA^E'D AS TROUT SY NCDEM_; 25 NTUS IN ALL SALTWATER CLASSES ANU ALL LA=C5 AND RESERVOIRS; AND 10 NTUS IN TROUT em- TERS) _ 2. • MEN _ RES SHALL BE TA MN TO PREVENT LIVE OR FRESH CONCRETE FROM- COMING _TiYTO CONTACT WITH WATERS OF THE STATE UNTIL TEE CONCRETE HAS HAIRDENED. CONSISTENCY DETERMINATION: CONSISTENT IN COASTAL ALREA SUBJECT TO THE FOLLOWING CONDITION: 1. SHOULD ALL OR PART OF T°T_.* D-ErELOPMENT ACTIVITY BE LOCATED WITHIN AN ARIA OF ENVIRONS'-ENTAL CONCERN (AEI) AS DESIGNATED BY = NORTH CAROL=NA COASTAL RESOURCES COM MISSIC.', A COASTAL AREA M?a1?Ir`?GEM?ExMT ACT (CPLv_?) PERMIT_ IS REQUIRED FROM- THE NCDCM3 UNLESS THE I--PLTCZLgT is a =C-- ERRMT AGENCY. IF Tom' -PPLICA.INT IS A FEDERAL AGENCY XbM ALL OR PART OF TITE DEVELOPME`N^s ACTIVITY IS "LOCATED WITHIN ALIN _.EC, A CONSISTENCY DETERMINATION PUR$U AT, TO 15 CFR 930 MUST BE PROVIDED TO THE NCDCli AT LEAST 90 DAYS BEFORE T;? ONSET OF THE PROPOSED ACTIVITY.