Loading...
HomeMy WebLinkAboutNCC202849_ESC Approval Submitted_20200708ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 25, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS Caldwell Timber Partners, LLC ATTN: Mr. Aaron M. Patsch 1400 16'1h Street, Suite 320 Denver, CO 80202 RE: Project Name: Waterfront Club Subdivision Phase II Acres Approved: 12.5 Project ID: CALDW-2019-011 County: Caldwell City: North Catawba/Lovelady Address: Connelly Spring Road River Basin: Broad Stream Classification: Stafford Creek - WS - IV Submitted By: Mr. Kirby R. Bell Jr., PE, CPESC Date Originally Received by LQS: January 11, 2019 Date Revision Received by LQS: June 12, 2020 Plan Type: Residential Dear Mr. Patsch, This office has reviewed the subject revised erosion and sedimentation control plan and hereby issues this Letter of Approval with Performance Reservations. The performance reservations are attached. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.Iucas@ncdenr.goy or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources v�JJ� Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NOFI;CAAOLiNA 0ep memnlEnvleomnenml9uallry 828.296A500 Letter of Approval with Performance Reservations Caldwell Timber Partners, LLC ATTN: Mr. Aaron M. Patsch June 25, 2020 Page 2 of 3 of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North. Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Please notify this office when you plan to re -commence construction operations on this site. Your cooperation is appreciated. S' ere Mi ael Smith . Assi taut Regional Engineer Division of Energy, Mineral, and Land Resource Letter of Approval with Performance Reservations Caldwell Timber Partners, LLC ATTN: Mr. Aaron M. Patsch June 25, 2020 Page 3 of 3 Enclosures: NPDES NCG01 Fact Sheet Performance Reservations ec: Mr. Kirby Bell Jr., PE, CPESC robbiebell(@bnkinc.com Mr. Bart Shaw bart@shawtate.com cc: Regional Office file PERFORMANCE RESERVATIONS Please check the location of TSB 7 and TSB 8 shown on plan sheets C2 and C3. The labeling of this basin appears switched between plan sheets. Please review or revise. If necessary, please send a corrected plan sheet to this office. {G.S. 113A-57 (3)}. Please note that the developer is responsible for the control of sediment on -site. If the approved erosion and sediment control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. {G.S. 113A-57(3)). Ref: G.S.113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities