Loading...
HomeMy WebLinkAboutSW7050838_APPROVED PLANS_20051017STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW %U5-299 3S DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD y-nop col/90 ,So -7D50932� 54 VICINITY MAP - - �--- -- S, 06-10'45" IN \ \�� NTS - - Z 2D LE �q - _ ms v _ == LEGEND �� !<. 1 1 D.28 �as� ��3slrr=ram I(re.J .==as �.0 -sd x10.77 \ \ POWER POLE 0 , ` BENCHMARK DRAINAGE FLOW DIRECTION o.2i PROPOSED CHECK DAM 1 \\ 50 LF 15" CMP 16' INV. IN - 8.10 INV. OUT = 8.10 PROPOSED ASPHALT ! PROPOSED CONCRETE RIP RAP 10. \ X 10.3D 9.87 10.17 o INSTALL TEMPORARY �10.00 PROPOSED GRADES s.o4 10.09 GRAVEL CONSTRUCTION 10.50,10 ENTRANCE - - - - -, x 10.50 EXISTING GRADES 11.30 © DROP INLET PROTECTION 11.50 10.75 _ MATCH EX. EDGE OF - - EXISTING DITCH PAVEMENT *10.10 PROPOSED DITCH a BUILDING SETBACK 1------ --- ----- - - - - -- VEHICULAR SETBACK � 10.50 t 11.20 ' - PHASE LINE ! BEGIN SWALE9.50 INV_ = 9.50 8 PROPOSED CONTOURS 0 -10 - EXISTING CONTOURS \� o O WOODSLINE m LIMITS OF DISTURBANCE 11.90 o \ 11.55 = �1 a:lp 11.90� \! 43 \ Q 11 10 \ V 1� 10 LOCATION OF ko ACTIVE DRAIN FIELD 1 \ 1 j \ 10.14 x1D. 1 ► ` \ \ 10.22 X 10.36 X 10.35 ® \ !\ 10.0 "•" , �.78 CLEANOUT EXISTING BUILDING A ,\ 10.0 DITCH FLAT 0 8.60 7,700 SF \ 1 -- OFFICE=1,925 SF , \ 14 ® WAREHOUSE=5,775 SIT FF = 12.00 / 1 ! . 11.90 11.25 ` x )860.84 INV 9.0 V \\ \ \ \ 11.8 .57 .07 • 12 \ 80 LF 12" CMP I \ \ \ \�n�! ® 11.35 > • : JUNCTION BOX ♦ \ \\ �� ` 11.90 \® \ RIM - 11.70 90 LF 15" CPP INV = 8.50 _ \ _ _ RIP RAP 11-40 \ �Y I \ 0 0 \ Q. \ loop X 10.71 N MILBURN E. NORMAN DB 102, PG 260 ZONED: RESIDENTIAL X10.78 45" 10.75 BEGIN SWALE INV. = 10.00 - 1 '25' BUILDING & VEHICULAR SETBACK / 8.94 !�� � �E 1 \ \ �\7 10 4 2 w ! LOCATION OF \\ REPAIR AREA > LOCATION OF 2 `., REPAIR AREA \\\\\ \ 11.30 _ \\ \ \ ! \ IF \ \ FXIS-ONC WOODS 11.80 10.80 \ \ ! LOCATION OF \ \\ \ ! ACTIVE DRAIN FIELD \ s 11.90 1.80 Ni 1 10 1515 N/F THURMAN PICKETT \ \ \ \ DB 159, PG 471 ZONED: RESIDENTIAL F -c 00 55/ 10,90 / / 11.30 -11.40 11.15-•'�* BUILDING B : �® - \ \ \ \ ! 7,700 SF \ ! OFFICE=1,925 _ \ \ 1 WAREHOUSE-S 775 FF = 12.00 \ NOTE: RUNOFF FROM THE F \ REAR OF BUILDING B SHALT \ \\ \ 10 !, BE COLLECTED 14 A GUTTER \ AND DOWNSPOUT SYSTEM{ THAT WILL DIRECT ALL RUNOFF TO THE COLLECTION SYSTEMTHAT DRAINS TO ` THE xs. a - DETENTION POND.j CURVE TABLE CURVE DELTA RADIUS I TANGENT I ARC I CHORD BEARING CHORD DISTANCE Cl 3-41'31" 2206.12' 71.10' 142-15 1 N07'17'08"E 142.13' C2 3'02'20" 2206.12' 58.52' 117.01 NO3 55'12"E 117.00' C3 2'47'18" 288.53' 7.021 14.04 1 N7447' 8"E 14.04' GRAPHIC SCALE 10 20 40 l IN f-EtT 1 inch = 20 ft 0.25 � 11.50 140 LF 12" CPP 1 11.40 0.95 RIM 1 \ 53 \ .80 5.9 ! 11.90 / 01 -9 1 50' UILDING-aE76ALC' C- - - - - - 10_90 � _ , � - - - 11.80 - o ' 4 9-19 1A 1; 1 1t.bL 1 t, 1.01 ( ) / 11.15 DI 1 A + x10.52 20 LF 12" CMP RIM 10.90 � � PP E� TIOb ON = B.+ + 1 - INV IN = 9.00 INV. 8.20 12 LF 12" CMP \ 10.65 INV OUT = 8.20 %�-� _ Qp 6.33i6 3 ' ,1 \ v_ � + 1 410.70 1 15 11.15 RIP RAP- 1 + 10.35 /1 " x11.2 r. \ _ _ _ - - - - CID •_� _ _ -20' VEHICULAR SETBACK 7 ` RIP RAP �- "1(F40 - / 36 LF 18" - - - - r 1 APRON 1 1 BEGIN SWALE �11 OPr-�� _ - - - - - - - - � OUTFLOW INV. = 9.75 _ _ 0'S��r ! 250 LF 18" CMP _ _ - _ _ - _ - - - STRUCTURE 11 _ t = INV IN = 7.50 EXIST. 60 - 39- .70 1 EX. TEL PED 1 10-44 INV OUT = 6.50 ACCESS 10.62 1 i EASEMENT �� ti SITE DATA 1. OWNER: BILL FRASCA COASTAL ROOFING AND SIDING LIGHTING PROTECTION, INC. 2401 COLINGTON RD. KILL DEVIL HILLS, NC 27M (252) 480-0515 2. LOT COVERAGE: BUILDINGS = 15,400 SF 18.47E ASPHALT = 23,280.42 SF 27.8% CONCRETE = 2,005.37 SF 2.4% OPEN SPACE = 41163.21 SF - 51.53 TOTAL AREA = 83,849 SF 100.00% 3. THIS SITE IS LOCATED ON U.S. 158 8181 do 8179 CARATOKE HWY. TOTAL AREA = 83,849.39 SF PARCEL ID # 0123-000-092A-0000 111 0123-000-09213-0000 4. PARKING: RETAIL4 AREHOUSE BUILDING - 15,400 SF PARKING BASED ON 1 SPACE PER 400 SF REQUIRED PARKING SPACES = 39 SPACES PARKING SPACES PROVIDED - 39 SPACES (INCLUDING 2 HC SPACES AND 8 COMPACT SPACES) 5. SHADING REQUIREMENTS- (PAVED/CONCRETE AREA) 2,3087.7 SF X 0.20 - 4,617.54 SF (20% OF VEHICULAR AREA) SHADING PROVIDED - 7,070 SF 6. SITE IS ZONED: GB (GENERAL BUSINESS) 7. SITE IS LOCATED IN FLOOD ZONE C ACCORDING TO FIRM MAP NUMBER 3700780365C. DATED 11 /01 /84. 8 STRUGTUR9L SETBACKS: R/W BUILDING = 50' (US 158) R/W BUILDING = 20• (SOUTH) REAR BUILDING - 25' SIDE BUILDING - 25' (NORTH) VEHICULAR SETBACKS: R/W VEHICULAR = 20' SIDE VEHICULAR = 25' REAR VEHICULAR = 25' 9. THIS IS NOT A BOUNDARY SURVEY. BOUNDARY INFORMATION TAKEN FROM A SURVEY TITLED "MINOR SUBDIVISION FOR GARLAND H.. DUNSTAN, JR" DATED 3/13/03 10. DISTURBED AREA FOR SITE DEVELOPEMENT - 2.22 AC 11. LANDSCAPED BUFFERYARD REQUIREMENTS: FRONT R/W - TYPE "C" BUFFERYARD SIDE GB - TYPE "A" BUFFERYARD REAR GB - TYPE "A" BUFFERYARD 12. THERE ARE NO WETLANDS ON THIS SITE. 13, ELEVATIONS TIED TO NGVD MONUMENT Q254 (ELEV.-12.93) 14. SEASONAL HIGH WATER TABLE IS APPROXIMATELY ELEVATION 8,00. DRAINAGE CALCULATIONS PRE -CONSTRUCTION POST CONSTRUCTION DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS Q10= CIA Q1d= CIA A = 1.92 AC A = 1.92 AC C =0.35 C =0.70 f = 6.3 IN/HR I = 6.3 IN/HR QIo = 4.23 CFS Q10 = 8.47 CFS INTO POND PEAK DISCHARGE FROM POND = 3.45 CFS 10.17 TBM = PK NAIL_ T X10.43 \ EDGE OF ASPHALT 10.27 ELEV = 10.55 C55 RECENED 007 072005 DwQ A"# C, 7.88 ac' � !� - 0" 8X JUNCTION BOX .2 9 1 . 1 1 A •9 -11 ' 2 RIM = 11.00 11.37 000HP HI9i 0HP, I- C ow. OHP OHP Cl INY = 7.50 c11.90 21" RCP !\ �� X1 .59 HP OHP OHP 1 - _ INV IN = 8.58 w �12 X12.61 x12.3 12� 0 t110' TO EXIST INV OUT 8.58 x12.70 12� -12- 1 FIRE HYDRANT 13 00 � --- --13-� - r3-- P� l OHP 1201 ] -7 10.41 9 ry X 12.47 _1 �- X 13.39 x 13. 13.20 13.20 X 13.56 13� EX. 7 c)-Wm t 3 a� �7p 1� �� 12-61 a P `70� 13.T43� X13.92- 1-49$�X13.99 XX9.P.$1 f1 / ~may' 1 1 1 9 -13r x 13.52 APPROX. LOCATION - 8D 12.85 ~ \ Ca R �10� > X13-38 OF EXIST. 14" WM - � �` �99� 10�_ 10.85 i BA3 MATCH EX. EDGE OF --99> -- PAVEMENT = ±13.50 y t y 30" RCP- - --73- -- x13.55 � 3aA1 l` 12.20 INV OUT 5.8 70 - -13- -13- -- -13-- -13- -T3- -- -13- -13- -13--- -73--- � --P3-- 11.3/� ~ -P3- � 72.79 APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION °US-CARATOKE_ 120 R DIVISION OF WATER QUALITY x 11.43 O+_20 LJ.J 11 I, 2R U �U O M � o 0 %% ,ll��3n��ettii o � _ i Q Ze v UJI ♦ttt�t fit U h F U1 �� hg 0 Y crqy 0 4k N kq 40 �Li �q 0 N c� a 0 U a 0 0 Y Y Y gq z w 0 0 w z � C a 0 0 c3 a � U Q w 0. S 0 3 Q Q � N � W a o (A 1n o (f) LLJ Of 0 w QD n \ rn in A 0 o o r � cV M ik •+rl foc sY4 -wsooss i EROSION CONTROL MEASURES THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REOUIRMENTS OF THE EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS OF THE DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE PROVIDED ON ALL AREAS OF THE SITE WHICH ARE DISTURBED OR GRADED. CONTRACTOR SHALL PROVIDE GROUND COVERS (SEE SCHEDULE BELOW) WITHIN 30 CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION WITHIN THE SPECIFIC AREAS. THE CONTROL MEASURES SHALL BEGIN PRIOR TO ANY LAND DISTURBING ACTIVITY INCLUDING CLEARING, SHALL CONTINUE DURING THE CONSTRUCTION AND SHALL CONTINUE WITH THE NECESSARY MAINTENANCE UNTIL THE DISTURBED LAND IS STABILIZED. COMPLIANCE WITH LOCAL AND/OR STATE SOIL EROSION AND SEDIMENTATION CONTROL LAWS SHALL BE THE ENTIRE RESPONSIBILITY OF THE CONTRACTOR_ THIS PARAGRAPH IS INTENDED TO SERVE ONLY AS A GUIDE TO THE CONTRACTOR FOR COMPLIANCE WITH SUCH LAWS. ORDERS, RULES AND REGULATIONS CONCERNING EROSION AND SEDIMENTATION CONTROL PROTECTION OF EXISTING STRUCTURES AND FACILITIES FROM SEDIMENTATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ITEMS TO BE PROTECTED SHALL INCLUDE, BUT ARE NOT LIMITED TO CATCH BASINS, NATURAL WATERWAYS, DRAINAGE DITCHES, WALKS, DRIVES, ROADS, LAWNS, AND STREAMS. SEEDING SCHEDULE SEED MIXTURE RATE OPTIMUM PLANTING DATES 1. KENTUCKY 31 FESCUE 5 #/1000 SF MAR. 15 - MAY , AUG_ 15 - OCT. 15 2, COMMON BERMUDAGRASS 2 #/1000 SF MAY 1 - DUNE 3t) (HULLED) 3. PEARL MILLET 2 #/1000 SF MAY 1 - OCT. 1 4- FESCUE 5 f/1000 SF OCT. 15 - MAR. 15 TOP WIDTH VARIES EXISTING GROUND DEPTH VARIES. St�C /�� (MADE POINT TYPICAL DITCH OR SWALE NTS 10 YR = 9.75 INLET ELEV. - 8.00 CLASS B STONE COMPLETELY 6' SCH 40 PVC PIPE, SURROUNDS RISER - FEMALE ADAPTER & PERMANENT THREADED PLUG WATER SURFACE " ELEV = 8.00 6" SCH 40 PVC TEE , 6" SCH 40 PVC TEE THREADED PLUG WITH // xI" DIA. HOLE DRILLED THROUGH _ 6fr1IN. - 4�fi' �SCH 40 PVC (LENGTH AS REQUIRED) 20'X20"X3' THICK CONCRETE PAD TOP OF RISER ELEV. = 9.39 i i�aaiat•� � iro+�� ir.0 -� ii mak6a r .J0 It,t.- SEEDBED PREPARATION THE CONTRACTOR SHALL CUT AND DISPOSE OF WEEDS OR OTHER UNACCEPTABLE GROWTH ON THE AREAS TO BE SEEDED. UNEVEN OR ROUGH AREAS SHALL BE SHAPED AND SMOOTHED TO PROVIDE FOR EFFECTIVE SEEDING AND EASE OF MOWING. THE SOIL SHALL BE SCARIFIED TO A DEPTH OF NOT LESS THAN 5 INCHES, CLODS SHALL BE BROKEN AND THE TOP 3-4 INCHES OF THE SOIL SHALL BE WORKED INTO A SEEDBED BY THE USE OF PULVERIZERS, DRAGS, OR HARROWS. THE PREPARATION OF SEEDBEDS SHALL NOT BE DONE WHEN THE SOIL IS FROZEN OR EXTREMELY WET. LIMESTONE, FERTILIZER, AND SEED LIMESTONE, FERTILIZER, AND SEED SHALL BE APPLIED WITHIN 24 HOURS AFTER COMPLETION OF SEEDBED PREPARATION. LIMESTONE AND FERTILIZER MAY BE APPLIED AS PART OF THE SEEDBED PREPARATION, PROVIDED IT IS WORKED INTO THE SOIL IF NOT SO APPLIED, LIMESTONE AND FERTILIZER SHALL BE DISTRIBUTED UNIFORMLY OVER THE PREPARED SEEDBED AT THE SPECIFIED RATE OF APPLICATION AND THEN HARROWED, RAKED, OR OTHERWISE THOROUGHLY WORKED INTO THE SEEDBED. SEED SHALL BE DISTRIBUTED UNIFORMLY OVER THE SEEDBED AT THE RATE OF APPLICATION SPECIFIED, AND IMMEDIATELY HARROWED, RAKED, OR DRAGGED AS TO COVER THE SEED WITH A LAYER OF SOIL MULCHING ALL SEEDED AREAS SHALL BE MULCHED. GRAIN STRAW MAY BE USED AS MULCH AT ANY TIME OF THE YEAR. MULCH SHALL BE APPLIED WITHIN 24 HOURS AFTER THE COMPLETION OF SEEDING. CARE SHALL BE TAKEN AS TO PREVENT DISPLACEMENT OF SOIL OR SEED FROM THE SEEDBED AREA DURING MULCHING OPERATIONS. MULCH SHALL BE UNIFORMLY SPREAD BY HAND OR MECHANICAL SPREADER. AN ACCEPTABLE APPLICATION WILL BE THAT WHICH WILL ALLOW SOME SUNLIGHT TO PENETRATE AND AIR TO CIRCULATE BUT ALSO PARTIALLY SHADE THE GROUND, REDUCE EROSION AND CONSERVE SOIL MOISTURE. MAINTENANCE AREAS WHERE SEEDING AND MULCHING HAVE BEEN PERFORMED MALL BE MAINTAINED IN SATISFACTORY CONDITION UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. AREA OF DAMAGE OR FAILURE DUE TO ANY CAUSE SHALL BE REPAIRED OR REDONE AS NECESSARY. SECTION LAYER OF #5 - WASHED STONE TQP OF DITCH BANK 4" THICK BOTTOM DITCH PROFILE Z— —CLASS B STONE REMOVE SEDIMENT WHEN IT ACCUMULATES TO 1/2 THE HEIGHT OF THE DAM FILTER DAM IS TO BE IN PLACE UNTIL GRASS IS ESTABLISHED IN BOTTOM OF DITCH SUFFICIENT TO PREVENT EROSION CHECK DAM DETAIL MTS 18" CMP RISER W/ ANTI -VORTEX PLATES & TRASH RACK. SEE TRASH RACK DETAIL WELD 1/4' STEEL PLATE ON BOTTOM_ BARREL 12' CMP INVERT = 8.00 4 aQ d S 4 d i\\\�57 WASHED STONE 4 DRAWDOWN DEVICE- 6" GI STEEL PIPE do FITTINGS, ATTACH TO RISER OUTFLOW STRUCTURE NTS 1 ANTI -SEEP COLLARS AT OF DAM 1. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PADS. (SEE DETAIL) 2. INSTALL EROSION CONTROL DEVICES AT SITE DISCHARGE POINTS TO PREVENT OFF SITE SEDIMENTATION. 3. CUT NEW SWALES AND DITCHES AND CONSTRUCTION DETENTION POND. 4. INSTALL THE REMAINING SEDIMENT AND EROSION CONTROL PROTECTION. 5. INSTALL THE STONE BASE AND ASPHALT FOR THE PROPOSED PARKING. 6. PROVIDE A GROUNDCOVER ON EXPOSED SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS (WHICH EVER IS SHORTER), THE FOLLOWING COMPLETION OF ANY PHASE OF GRADING, AND, A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT 7. REMOVE SEDIMENT FROM DETENTION POND AND RESTORE TO DESIGN DEPTHS. 8 MONITOR AND MAINTAIN THE INSTALLED EROSION CONTROL MEASURES AND REPAIR AS NECESSARY. 9. ONCE VEGETATION IS ESTABLISHED, REMOVE THE CONTROL DEVICES. CONSTRUCTION SEQUENCING PLANTING NOTES 1. VEGETATED SHELF SHALL BE PLANTED WITH PLANTS SELECTED FROM THE TABLE PROVIDED. 2 OR 3 PLANTS SHALL BE CHOSEN FROM THE TABLE. 2. PLANT MATERIAL MAY BE AVAILABLE FROM LOCAL WETLAND AREAS AND DITCHES. THE CONTRACTOR SHALL VERIFY WITH THE LOCAL OFFICE OF COASTAL AREA MANAGEMENT WMETHER OR NOT A PERMIT IS REQUIRED TO TAKE PLANTS FROM THESE AREAS. 3. APPROPRIATE TRANSPLANTING OR PLANTING METHODS SHALL BE DETERMINED ACCORDING TO PLANTS CHOSEN_ (PRIOR TO DIGGING, THE TOPS OF THE PLANTS SHOULD BE CUT OFF TO A HEIGHT OF 4-6 INCHES. CUT OR DIG PLUGS APPROX. 4 INCHES SQUARE MAKING SURE TO GET FULL ROOT DEPTH. THIS PROCESS SHOULD IMPROVE THE SURVIVAL RATE OF MOST OF THE PLANTS.) GRADE (t11.00) �E 10' VEGETATED SHELF COMMON NAME SCIENTIFIC NAME PICKEREL WEED PONTEDERIA CORDATA BLUE FLAG IRIS VIRGINICA ARROWHEAD/DUCK POTATO SAGGITARIA LATIFALIA PERMANENT POOL ELEVATION = 8.00 \ POND BOTTOM ELEV. = 2,00 WET BASIN CROSS SECTION NTS 2' X 4' WOOD FRAME II II II II U f X 4" STAKES BURIED 1BRIC TE r •.�4F�iA-i� �ZIC��IC��IC lC19IC19 / .IGIIICIC I IC1ClCIfIC � _ • , �CIC C 1 IIC . IC 1I�It 11 It / 1 - . �- • 1 I�.11If1ties -1:11111IR121• .. Ii1CICICICICICICICICICICRI it IC IC IC IC IC iC IC iC IG IC IC i !� - • • • 1 IIICICICICICICICICICICICICI • e- • • • • • ICE IC��IC��IC��IC��IC�51, - • 1 • • • • a - • 11lC11 ItICHICI IM11CI1I -• ! •..•.- 1 • 1• FABRIC DROP INLET PROTECTION NTS A. NCDOT #5 OR #57 WASHED STONE SHALL BE USED. PAD TO BE 50' X 20' X 6" DEPTH MIN. B. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS TO BE PROVIDED. C. ENTRANCE(S) SHALL BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. D. PAD MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. E. ANY MATERIAL WHICH IS TRACKED ONTO ADJACENT ROAD SHALL BE REMOVED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS RIP RAP PAD TOP ELEV. = 8.20 GRADE 20' MARSH VELETA PERMANENT -----WATER SURFACE ELEV, 8.00 EARTH WEIR ACROSS END OF FOREBAY AREA 3' a OTTOM ELEV. = 5.00 m BOTTOM ELEV. = 2.00 FOREBAY AREA CROSS SECTION NTS CLASS 'B' EROSION CONTROL STONE STONE DEPTH 22-5' TOP OF BANK u w a z � m V 0 Q u ? u u DITCH BOTTOM OV 4 4 O 4 TOP OF BANK 18' PIPE EROSION CONTROL STONE DEPTH To FLUSH WITH aF DITCH (ER OF FINE GRA1i1=L OR WOVEN GEO-TEXTILE RIP -RAP OUTLET APRON NTS l w 4 - U Q U W m � W a z W W a a a z Q W c� 0 — a 5 U A 0 0 �k 'rHN I I M r4 - Jam- • 1 J ; ,, ; � ; f . f I 5 - +. � . • i - { � � � J - � - - L - _ - y i L- `L1��-_s 1 a- il� r .�-__.- _-... �- ...-_., �� . s s� �� .i Y1_>� +1� a� ��'. •t - _ _ ��,__S, c�1� - wa6 SW7cr D83S ti f 6� AS REQUIRED SEE PLANS FOR INVERT & RIM ELEVATIONS RIM ELEV. (SEE PLAN 1' RADIUS sA • // / 6x6xl9(o WWF COMPACTED SUBGRADE 6" THICK CONCRETE SLAB DUMPSTER PAD DETAIL NTS 4" 2" RAD. 2' TYPE SF 9.5 A ASPHALT 6" ABC STONE BASE CURB DETAIL Nm NOTE: ALL MATERIAL AND INSTALLA11ON TO MEET MIN. SPECIFICATIONS OF NCDOT ' STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES% LATEST EDITION. C.I. F. do G. - 0I-840.16 BY CAPITOL FOUNDARY OF ►APfmki'A INC. OR EQUAL, HEAVY DUTY CASTING, = 180 LBS. MIN., GRATE - 270 LBS, MIN. 3EL MASONRY AS REVD FROM FULL DIM'S OF R BARREL TO INSIDE DIM'S OF FRAME. 3EL OR CONE SECTION MAY BE ECCENTRIC. INSIDE DIMENSIONS: SHALL BE EQUAL TO THE LARGEST CULVERT DIAM. 8- SEWER BRICK MASONRY (SOLID) SET MASONRY WALL FLUSH W/ BELL END OF CULVERT ............................:...'...::�::::.�::.�::::.�:::::..:: ICRETE -- SLOPE TO VERT INVERT. SEE PLANS FOR CULVERT TYPE & SIZ INV. IN. SEE PLANS FOR SLOPE L ...........................3000 PSI CONCRETE FOOTING ................. _.._.. _.I I I W/ 6x6x10/10 WWM ' I COMPACT SUBGRADE TO 959E OF ASTM D 698 DROP INLET NTS APPROXIMATE 1 CONCRETE (TYP) 1'X4'XS' SALT TREATED WITH 1" CHAMFERED 4'X4" SALT CORNER (TYP) TREATED (TYP) 6' e�ee�eeno 1 �emn�o�e�e�eno 2"x4" SALT TREATED (TYP) 4" THICK 2500 PSI CONCRETE SIDEWALK i SLOPE 1/4" PER FOOT -III III IIM I l III 2' TYPE SF 9.5 A _I IIlEl IF�l IMi I1=1 IIASPHALT O 0 O Q Q O s' ABC STONE BASE =III III Ilm I 1 I - IIl .El I Ml I EdM I lEdlE-1 I M III III COMPACTED EARTH1I-- EXISTING EARTH DUMPSTER SCREEN DETAIL NTS (TYPICAL)STANDARD HANDICAPPED PARKING SIGN TO BBE INSTALLED AT REQUIRED HEIGHT AND 10' RAMP DIMENSIONAL RELATIONSHIP TO PARKING STALL 1:20 SLOPE HANDICAPPED PARKING STALL::� /—. FACE OF 6" CURS AS DIM'D. SITEDPLAN PARKING STALL PAVEMENT MARKINGS (TYP.)j— STANDARD HANDICAPPED SYMBOL- 5-0 FT. WHEELCHAIR ACCESS AISLE/RAMP 8' 1 8' PLAN VIEW OF PARKING STALL(S) RESERVED PARKING -BOTTOM EDGE OF SIGN MAXIMUM PENALTY $250 os 20-37.6 CLEARANCE: 60" OUTSIDE OF PEDESTRIAN AREAS 84" WITHIN PEDESTRIAN AREAS —GRADE A.D.A. STANDARD HANDICAPPED PARKING SIGN (W/ STANDARD HANDICAPPED SYMBOL) HANDICAPPED PARKING WALKWAY & RELATED DETAILS NTS 6' O.D. X 6' STEEL BOLLARD W/ GALV. FINISH GROUT FULL Wf 3000 PSI CONCRETE AND FINISH W CROWN AT TOP. SURFACE MATERIAL 3' RISE ADE,Y � 6 1/2" I.D. x 3'-3" SCH 40 STEEL SLEEVE SE IN 3 C.Y. OF 3000 PSI CONCRETE, SLOPE TOP AS SHOWN. OMPACTED EARTH PIPE BOLLARD DETAIL NTS CONCRETE SIDEWALK DETAIL NTS HYDRANT TO BE M+H 129 TRAFFIC MODEL FOR 3.5' BURY WITH 5 1/4' VALVE OPENING 12" AS REQ'D MINIMUM TO CLEAR SWALE t14' (PART JHYST-5045-STCAP & SNAP TIGHT/STORZ 5" BLIND CAP HYDRANT PART #BS50 METAL CAP - NO EXCEPTIONS) BREAKAWAY FLANGE & BOLTS SHALL BE ABOVE FINISHED GRADE FINISH UO 24' DIA. 4' THICK GRADE ;. CONCRETE 'DONUT" 4" PVC SLEEVE 6" DUCTILE IRON PIPE 36' 7 CU FT e VALVE BOX MINIMUM CRUSHED STONE o0 oae 6" RESILIENT WEDGE u°Doll o00 GATE VALVE 0 C, _CONCRETE THRUST CONCRETE THRUST ---��� ': O ,• BLOCK PER DETAIL BLOCK PER DETAIL 12" DUCTILE IRON GRIP RINGS WATER MAIN ROMAC OR APPROVED EQUAL (SEE PLANS FOR LOCATION) 12" CLASS "B' CONCRETE PER NC DOT NOTES: 1. DO NOT BLOCK HYDRANT DRAIN WITH THRUST BLOCKING 2. COAT TIE RODS & NUTS WITH EPDXY 3. DO NOT SUPPORT VALVE BOX DIRECTLY ON VALVE 4. ALL JOINTS SHALL BE MECHANICAL JOINTS FIRE HYDRANT DETAIL NTS 1/4" ANTI -VORTEX PLATES 3/4' STEEL BARS (TYP.) -i---18" CMP RISER P. SPACING BETWEEN RS AND PLATES WELD TO PLATES 1/4' STEEL PLATES— \\ ATTACH TO RISER USING �� \\ 2'X2"X1/4" ANGLE IRON 3/4" STEEL BARS (TYP.) WELD TO RISER 18' CMP RISER TRASH RACK NTS PRUNE CODOMINANT LEADERS PRUNE BROKEN, RUBBING OR CROSSING 13RANCHES #10 WIRE THRU RUBBER HOSE REMOVE TAGS AND LABLES. CUT AWAY ALL BALLING ROPES REMOVE TOP OF WIRE BASKET UNAMENDED BACKFILL SOIL PARTIALLY BACKFILL, WATER TO SETTLE SOIL, FINISH BACKFILLING WIDEN AND SCORE HOLE WALL REMOVE CONTAINER AND CUT CIRCLING ROOTS IF CONTAINER --GROWN, OR AS MUCH BURLAP AS POSSIBLE IF FIELD -GROWN DO NOT PRUNE TERMINAL LEADER OR BRANCH TIPS PRUNE NARROW CROTCH ANGLES do WATER SPOUTS 2" X 2' STAKE INSERTED 12' - 15' INTO SOLID SOIL. DO NOT STAKE OR WRAP TRUNK UNLESS NECESSARY. PRUNE SUCKERS 2"- 3' MULCH KEPT AWAY FROM TRUNK SOIL WELL TO CONTAIN WATER AREA FOR WATER DRAINAGE (PIPE OR TILE COULD BE INSTALLED) LEAVE SOLID 501E PEDESTAL DO NOT DIG DEEPER THAN BALL DEPTH. TREE PLANTING DETAIL NTS NOTES: 1. TAP SHALL BE PERFORMED IN THE PRESENCE OF A REPRESENTATIVE OF THE WATER SYSTEM AND THE ENGINEER. 2. TAPPING SLEEVE AIR TEST SHALL BE PERFORMED AT 100 PSI FOR 15 MINUTES. BLOCK PER THRUST FLOCKING DETAIL BEFORE PERFORMING TAR. TAPPNG SLEEVE ON EXISTING MAIN TAPPING DETAIL N TS EXISTING GROUND .-VALVE BOX 4" PVC SLEEVE (ENDS 4' - 6" BELOW BOTTOM OF CAP) TAPPING VALVE 1 TEMPORARY STORAGE FI FV = 9-3Q DETENTION POND DIMENSIONS r � ti '0 ti N N i3 S o Q. .4 • ..•" G� J U P, k' r 0 vl rn of) lk y q � g x y R a O N Y- z n_ Qo V Y d Y � J F LLI Q o cn Ty' Li M 0 Q m z a z w a zo F z w c� Q c Lu � a n A Ei o o N 9k ' -� •-��-1, . ,� � � 1.-c � i'NI E•r, 7,'I/J i Sr r-T' _ - l L Et �i, i i _. . ._c:. ..-i -� `:y •u-. _I-4e-�-�i'. _'�"Yr t..i iYd -5.: 7_, -CiLi i13i��